Bid Publish Date
05-Feb-2026, 10:12 am
Bid End Date
26-Feb-2026, 3:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
A tender has been published for Directorate Of Purchase And Stores Vibrometer - Induced Ground Vibration Monitoring Instrument (Q3) in MUMBAI, MAHARASHTRA. Quantity: 1 by. Submission Deadline: 26-02-2026 15: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Vibrometer - Induced Ground Vibration Monitoring Instrument (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Certification | Warranty | 1, 2, 3 Or higher |
| Construction | Length of wire for geophone assembly(meter) | 5-6 |
| Construction | Length of wire for microphone assembly(meter) | 2-3 |
| Seismic Vibration Monitoring | Resolution of Seismic Velocity(mm/sec) | 0.006-0.009 |
| Seismic Vibration Monitoring | Minimum accuracy of Seismic velocity measurement | 5% |
| Seismic Vibration Monitoring | Maximum linear freqency response of Geophone | 250.0 |
| Sound Overpressure Monitoring | Maximum Linear sound overpressure monitored (dB) | 144-148 |
| Sound Overpressure Monitoring | Maximum Linear response of microphone | 250.0 |
| Sound Overpressure Monitoring | Minimum Linear sound overpressure monitored (dB) | 82-88 |
| Waveform recording & data collection | Sample Rate per channel(samples/sec) | 4096 |
| Waveform recording & data collection | Waveform recording modes | Fullwave form, Combined, Manual |
| Histogram/Bar Graph Recording | Display facility feature available | Peak particle velocity, Frequency, Displacement, Air over pressure level, Acceleration, Peak Vector Sum, RMS/Peak Velocity, Acceleration & Displacement |
| Generic Parameters | Water Proof(Submerged 20+ cm in water logged mines) | Yes |
| Generic Parameters | Modular Software for Vibration Data Analysis Provided | Yes |
| Generic Parameters | Integrated Keypad | Yes |
| Accessories | External data printer | No |
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | DEEPTEC INSTRUMENTS AND INFRASTRUCTURE CONSULTANTS PRIVATE LIMITED Under PMA | Make : Mini-Seis III Model : PRO | 25-02-2026 12:21:43 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | DEEPTEC INSTRUMENTS AND INFRASTRUCTURE CONSULTANTS PRIVATE LIMITED Under PMA | Item Categories : Vibrometer - Induced Ground Vibration Monitoring Instrument |
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS