Bid Publish Date
23-Oct-2025, 12:30 pm
Bid End Date
20-Nov-2025, 12:00 pm
EMD
₹40,000
Location
Progress
Central Council For Research In Siddha has released a public tender for Electrochemical Workstations (Q3) in CHENNAI, TAMIL NADU. Quantity: 1. Submission Deadline: 20-11-2025 12: 00: 00. Download documents and apply online.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ANALYTICAL TECHNOLOGIES LIMITED Under PMA | Make : ANALYTICAL Model : EWA-3600E Series | 12-11-2025 11:00:41 | |
| 2 | LEADS INDIA LABORATORY EQUIPMENT CO. Under PMA | Make : METROHM AUTOLAB Model : VIONIC | 20-11-2025 10:15:31 | |
| 3 | METROHM INDIA PRIVATE LIMITED Under PMA | Make : METROHM AUTOLAB Model : VIONIC | 19-11-2025 17:08:04 | |
| 4 | RESEARCH SUPPORTERS INITIATIVE PRIVATE LIMITED Under PMA | Make : Origalys Electrochem Model : OGF01A | 03-11-2025 14:56:51 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | RESEARCH SUPPORTERS INITIATIVE PRIVATE LIMITED(MII) Under PMA | Item Categories : Electrochemical Workstations | |
| L2 | METROHM INDIA PRIVATE LIMITED Under PMA | Item Categories : Electrochemical Workstations |
Please sign in or create an account to view contract details and download result documents.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
5
OEM Avg. Turnover
40
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Electrochemical Workstations (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
20-Nov-2025, 6:30 am
Opening Date
20-Nov-2025, 7:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Specifications | No. of channel | 1 |
| Specifications | Interface | USB |
| Specifications | Measured current/Potential resolution | 150 microV or better |
| Specifications | Applied potential resolution | 150 microV or better |
| Specifications | IMP Amplitude range | Na |
| Specifications | Electrode Configuration, Terminals | 3, 4, 5 Or higher |
| Specifications | Potentiostat rise time | <1s |
| Specifications | Reference electrode input impedance | Greater then or equal to 1 |
| Specifications | Current range | +/- 10 nA - +/- 1 A |
| Specifications | Compliance voltage | +/- 12 V or better |
| Specifications | Scan Rate | 1 microV/s to 1000 V/s |
| Specifications | Potentiostat bandwidth | 1.5MHz or better |
| Specifications | Reference electrode input bias current | <20pA |
| Specifications | Applied current resolution | 0.03% of current range |
| Specifications | Maximum current | +/-1 A |
| Specifications | Bandwidth of electrometer | 1.5 MHz |
| Specifications | IMP frequency range | Na |
| Specifications | Maximum potential | +/- 10 V or better |
| Additional Information | Feature | Software provision for measurement of I-V measurements, I max, Pmax, Fill factor etc |
| Additional Information | Min System configuration | As per requirement |
| Additional Information | Electrochemical Cell System & Accessories | Ag/AgCI reference (Non-aq)-1 nos, Provision for Counterelectrode, Reference electrode and workingelectrode holder. Cell should be made ofquartz. need to customize as per ourrequirements, Pt working electrode- 1nos |
| Additional Information | Warranty Summary | 2 years or more from the date of installation |
| Additional Information | Upgradable option | Na |
| Additional Information | Techniques | AC Impedance, Amperometric i-t Curve, Bulk Electrolysis with Coulometry, Cyclic Voltammetry, Differential Pulse Voltammetry, Impedance - Time, Linear Sweep Voltammetry, Tafel Plot (TAFEL) potentiodynamic deactivation, pitting corrosion, corrosion rate, linear Polarization, Corrosion current etc |
| Test Report/Certification | Availability Of Test Report From Central Govt/Nabl/Ilac Accredited Lab To Prove Conformity To Specification | No |
| Test Report/Certification | Copies of reports and certifications to be furnished to buyer on demand at time of supplies | NA |
| Test Report/Certification | Manufacturer should have ISO certification for quality standards (Manufacturer must Certified to ISO 9001:2008 or latest) | Yes |