Upgradation of Local Area Network
Indian Army
POONCH, JAMMU & KASHMIR
Bid Publish Date
10-Jun-2026, 9:55 am
Bid End Date
20-Jun-2026, 10:00 am
Value
₹2,00,000
Progress
Quantity
1
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for UPGRADATION OF LOCAL AREA NETWORK (LAN) in Secunderabad, Telangana. Estimated value is ₹200,000.0 with scope including site survey, integration with existing infrastructure, and installation with minimal office disruption. Delivery and commissioning occur at SIMULATOR DEVELOPMENT DIVISION, Secunderabad (PIN 500015). Key differentiators include mandatory site assessment, adherence to OEM guidelines, and complete network component installation, testing, labeling, and documentation. Unique aspects include coordination to avoid ongoing operations and ensuring new materials are new and genuine. This tender requires structured deployment, robust downtime planning, and post-installation certification of network points. The project emphasizes seamless integration without impacting existing services, with an emphasis on precise delivery sequencing and compliance to standard installation practices.
Product/service names: LAN upgrade, installation, integration, testing, labeling, documentation
Quantities: Not specified in BOQ; upgrade scope implied as project value ₹200,000
Estimated value: ₹200,000.0
Experience requirements: Not explicitly stated; site survey and integration imply network engineering capability
Quality/compliance: New, genuine materials; OEM guidelines compliance; downtime coordination
Delivery/installation location: SIMULATOR DEVELOPMENT DIVISION, SECUNDERABAD, PIN 500015
Testing/Certification: Submission of network point test reports post-installation
EMD not explicitly defined in data; bidders should verify security deposit terms in final tender
Delivery window: minimum 30 days for extended period with 25% quantity flex; schedule linked to last delivery order date
Site survey mandatory; installation to integrate with existing LAN without disrupting ongoing operations
Not explicitly specified in data; expect standard government terms; verify during bid submission
Delivery period begins after last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not described in data; bidders should confirm LD terms in final tender documents
Must perform a mandatory site survey prior to execution
Ability to integrate upgraded LAN with existing network without disrupting operations
Provide new, genuine materials per OEM guidelines and complete installation/commissioning
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
UPGRADATION OF LOCAL AREA NETWORK (LAN)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
POONCH, JAMMU & KASHMIR
National Fertilizers Limited (nfl)
GUNA, MADHYA PRADESH
Office Of Dg R & D (r & M)
CENTRAL DELHI, DELHI
Indian Army
Indian Army
PUNE, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates demonstrating LAN upgrade capability
Financial statements to show liquidity for project value
EMD/security deposit documentation (as per tender terms)
Technical bid detailing compliance with OEM guidelines
OEM authorization/partnership certificates (if applicable)
EFT Mandate and bank certification
Site survey report (pre-execution requirement)
Test reports/certifications post-installation
Bidders must submit GSTIN, PAN,Cancelled Cheque, EFT Mandate, site survey report, and evidence of prior LAN upgrade experience. Include OEM authorizations and financial statements if requested. Ensure all documents match tender terms and are submitted with the technical bid.
Schedule a site survey before execution at SIMULATOR DEVELOPMENT DIVISION, Secunderabad. Assess current LAN infrastructure, identify compatibility needs, and document any downtime windows. Submit findings along with the bid to support feasibility and integration planning.
The base delivery period starts after the last date of the original delivery order. If quantities increase, the extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
All materials must be new and genuine, installed per OEM guidelines, and delivered with labeling and documentation. Compliance with standard installation practices and post-installation test reports is required for acceptance.
Installation and commissioning will occur at SIMULATOR DEVELOPMENT DIVISION, Secunderabad, PIN 500015. Ensure coordination with the consignee to minimize downtime during office operations.
Payment terms are specified in the final tender; bidders should confirm whether advance, milestone, or post-delivery payments apply. Ensure compliance with EFT mandates and submission of required financial documentation.
Penalty provisions and performance bonds are not detailed in the provided data. Bidders must review the final AtC and tender terms for LD, default penalties, and security deposit requirements before submission.
Office Of Dg (aero)
📍 BANGALORE, KARNATAKA
N/a
NTPC Limited
📍 RAIPUR, CHHATTISGARH
Haryana Government
📍 GURUGRAM, HARYANA
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS