Bid Publish Date
02-Sep-2026, 8:51 am
Bid End Date
14-Sep-2026, 9:00 am
Location
Progress
The Indian Air Force invites bids for the supply of critical air handling components, including a HIGH PRESSURE AIR DELIVERY HOSE 15 MTR, a MANIFOLD TO INLET AIR HOSE 2.1 M (gas charging panel), and a CYLINDER TO MANIFOLD AIR HOSE. The BOQ shows zero listed items, and the estimated value with EMD amount is not disclosed in the available data. Delivery terms reference standard project completion processes, with strict adherence to ATC conditions. The procurement emphasizes compliance with the Buyer's terms, seals, and Certified documentation to avoid rejection. This tender requires rigorous supplier qualification, price certainty, and post-delivery support per the DPM 2025 guidelines.
High Pressure Air Delivery Hose - 15 meters length
Manifold to Inlet Air Hose - 2.1 meters length
Cylinder to Manifold Air Hose - length not specified
Gas charging panel connections via hoses
Compliance with ATC scope and Buyer's terms (Seal + signature required)
Key Term 1: 100% payment upon completion certificate and PRI as per ATC
Key Term 2: Warranty and LD as per DPM 2025; penalties may apply
Key Term 3: EMD amount not disclosed; non-compliance risks rejection and PBG forfeiture
Key Term 4: Deviation from ATC scope leads to blacklist; ensure certification and seal
Key Term 5: No BOQ items specified; refer to Buyer Uploaded ATC for exact scope
Key Term 6: Documentation must be uploaded per Bid document, ATC, and corrigenda
Eligibility criteria to be defined in ATC and scope of work
Experience in supplying military-grade air hose assemblies preferred
Ability to meet certification and documentation requirements as per Buyer ATC
Quantity
6
Category
HIGH PRESSURE AIR DELIVERY HOSE 15 MTR
Bid Type
Two Packet Bid
Bid Validity
160 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
HIGH PRESSURE AIR DELIVERY HOSE 15 MTR , MANIFOLD TO INLET AIR HOSE 2.1 M (GAS CHARGING PANEL) , CYLINDER TO MANIFOLD AIR HOSE
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Coimbatore
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Coimbatore | Coimbatore | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates relevant to air hose assemblies or military onboarding
Financial statements / solvency documents
EMD submission proof (as specified by bidder terms)
Technical bid documents demonstrating compliance with ATC
OEM authorizations or approvals (if applicable)
Key insights about TAMIL NADU tender market
Bidders must submit the required certificates and documentation per the Bid Document and ATC. Provide GST, PAN, experience certificates, and financials. Ensure compliance with the Buyer's ATC terms, certify with office seal, and align with DPM 2025 for warranty and penalties. The EMD amount and exact scope are defined in the ATC.
Required submissions include GST registration, PAN, experience certificates for similar air hose projects, financial statements, EMD proof, technical bid documents, OEM authorizations if applicable, and certifications confirming compliance with ATC scope. Ensure all documents are uploaded with seal and authorized signature.
The tender lists: HIGH PRESSURE AIR DELIVERY HOSE 15 MTR, MANIFOLD TO INLET AIR HOSE 2.1 M, and CYLINDER TO MANIFOLD AIR HOSE. Specific pressure ratings, material standards, and connector types are to be detailed in the ATC scope; bidders must attach conformity with the stated items and provide performance data.
Payment is stated as 100% after the item completion certificate (PRI) per the ATC. Ensure timely submission of completion documentation and certification upon delivery acceptance to trigger final payment.
Warranty and LD clauses follow DPM 2025 guidelines. Penalties may include liquidated damages for delays or non-compliance. Rejection of supplied items may trigger responsibility for collection costs. Compliance with ATC is mandatory to avoid blacklist and PBG forfeiture.
Prove eligibility with relevant experience certificates, financial stability documents, and OEM authorizations if applicable. Upload all required certificates per Bid Document and ATC, ensuring conformance with IS standards and the scope of work described.
Refer to the Buyer Uploaded ATC documents and Scope of Work. The scope mandates three hose assemblies and connectivity for gas charging, with terms on deviations and certification. Ensure your technical proposal aligns with the ATC and includes office-sealed confirmation.
Delivery timelines are defined in ATC; the buyer warns no extension after the delivery period. Prepare supply chain plans accordingly and confirm delivery readiness with the TE/TC documents that accompany the bid submission.