TenderDekho Logo
Active GEM

Panchayats And Rural Housing Department Gujarat LED Luminaire Tender Vadodara IS 10322 V3 2026

Bid Publish Date

29-Sep-2026, 6:06 pm

Bid End Date

10-Oct-2026, 7:00 pm

Progress

Issue29-Sep-2026, 6:06 pm
AwardPending

Key Highlights

  • • IS 10322 (Part 5/Section 3) (V3) (Q2) compliance required for LED road luminaires
  • • Option clause allows quantity variation up to 25% during contract and during currency
  • • SITC scope: Supply, Installation, Testing and Commissioning of LED luminaires
  • • OEM turnover criteria tied to bid evaluation; minimum average annual turnover over last 3 years

Tender Overview

The opportunity is issued by the Panchayats And Rural Housing Department Gujarat for the supply, installation, testing and commissioning of LED luminaires for road and street lighting conforming to IS 10322 (Part 5/Section 3) (V3) (Q2) at Vadodara, Gujarat. While the tender lacks a published quantity, the contract encompasses end-to-end delivery including site installation and commissioning, with the potential to adjust quantity by up to 25% during contract performance. The bid requires compliance with the specified IS standard and delivery terms embedded in the contract, with an emphasis on turnkey execution and after-sales support. This tender stands out due to the precise IS 10322 compliance, the option clause on quantity, and the emphasis on combined supply, installation, testing, and commissioning (SITC). Unique aspects include OEM turnover criteria and escalation-matrix for service support, signaling stringent financial and after-sales expectations.

Technical Specifications & Requirements

  • Product category: LED roadway luminaire compliant with IS 10322 (Part 5/Section 3) (V3)
  • Delivery scope: Supply, Installation, Testing and Commissioning (SITC) of LED luminaires
  • Delivery flexibility: Option to increase quantity up to 25% of bid quantity during contract; additional delivery period calculated as (Additional/Original) × Original days, minimum 30 days
  • Turnover criteria: Requires minimum average annual turnover over last three years; certificates from audited statements or CA/CMA as evidence; OEM turnover criteria also specified for bunch bids
  • Service expectation: Escalation matrix with service support contact numbers
  • BOQ: No items listed; suggests a framework for SITC with standard-led requirements

Terms, Conditions & Eligibility

  • EMD/Security: Not explicitly published in data; bidders must meet standard EMD submission norms per tender terms
  • Turnover requirement: Minimum average annual turnover over the last three financial years; similar criteria for OEM; documentary evidence required
  • Delivery timeline: Delivery starts after order and may extend with option clause; extended time mechanism defined
  • Payment terms: Not specified in the extract; typical government tenders include milestone payments on SITC completion
  • Documentation: Must include turnover certificates, OEM authorizations, escalation matrix, and project experience proof; GST/PAN/financials commonly required
  • Warranty/AMC: Not detailed here; ensure to verify warranty and post-sale support clauses in the final bid

Key Specifications

  • LED roadway luminaire categorized under IS 10322 (Part 5/Section 3) (V3)

  • Scope includes: Supply, Installation, Testing and Commissioning

  • Quantity adjustment: up to 25% during contract; delivery time recalculated with minimum 30 days

  • OEM turnover criteria required; minimum average annual turnover over last 3 years

  • Service support requires a defined escalation matrix with telephone numbers

Terms & Conditions

  • Option Clause permits 25% quantity variation during and after placement

  • SITC scope to be fully covered by bid price

  • Minimum turnover criteria for bidder and OEM with documentary evidence

  • Escalation matrix for service support mandatory

  • Delivery timeline mechanics tied to original and extended periods

Important Clauses

Payment Terms

Not explicitly stated; anticipate milestone-based payment aligned with SITC deliverables and commissioning

Delivery Schedule

Delivery starts from order date; extended period applies when option clause is exercised with minimum 30 days additional time

Penalties/Liquidated Damages

Not disclosed here; verify LD provisions in final terms; typical LD percent for delays may apply

Bidder Eligibility

  • Minimum average annual turnover as required by bid document for bidder and OEM

  • Evidence via auditedBalance Sheets or CA/CMA turnover certificate

  • Demonstrated past project experience in SITC of LED luminaires or related electrical works

Advertisement

Tender Data

Bid Details

Quantity

62

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

6

OEM Avg. Turnover

5

Past Performance

10 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Q2)

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Chhotaudepur

Delivery Pincodes

391165

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Narendrakumar Ambalal Modi391165,DISTRICT PANCHAYAT,CHHOTAUDEPUR- 391165ChhotaudepurGujarat3911656230-

Authority Records

PANCHAYATS AND RURAL HOUSING DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9958655.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

391165

Grievance Contact

[email protected]

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements or CA/CMA turnover certificate for last 3 years

4

Audited balance sheets for the bidder and OEM (if applicable)

5

OEM authorization / dealership certificates

6

Past project experience certificates

7

Escalation matrix for service support with contact numbers

8

Technical compliance certificates demonstrating IS 10322 (Part 5/Section 3) (V3) conformity

9

Any other standard compliance documents requested by terms

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for LED luminaire tender in Vadodara Gujarat 2026?

Bidders must submit GST, PAN, audited turnover certificates for last 3 years, CA/CMA turnover certificates, OEM authorizations, past project experience, and an escalation matrix for service support. The tender requires IS 10322 (Part 5/Section 3) (V3) compliance and SITC scope. Ensure 25% quantity variation readiness.

What documents are required for IS 10322 LED tender in Gujarat?

Required documents include GST registration, PAN card, turnover certificates for bidder and OEM, audited balance sheets, CA/CMA turnover certificates, OEM authorization, past project experience certificates, and escalation matrix with service contact numbers. Technical certificates proving IS 10322 compliance should be included.

What are the delivery terms for the Vadodara LED project?

Delivery period starts from the last date of the original Delivery Order; if an extension is exercised, additional time equals (Additional quantity/Original quantity) × Original delivery days, with a minimum of 30 days, and may extend up to the original delivery period at the purchaser's discretion.

What standards must LED luminaires meet for this Gujarat tender?

Luminaires must conform to IS 10322 (Part 5/Section 3) with V3 revision for Q2, ensuring performance, electrical safety, and photometric standards as per the IS 10322 framework; verify any supplementary BIS/IS certifications listed in the final terms.

What is the scope of supply for this LED bid in Vadodara?

Scope includes Supply, Installation, Testing and Commissioning (SITC) of LED road luminaires; the bid price must cover all components, with post-installation commissioning and acceptance testing performed per IS standards.

How is the 25% quantity variation handled in this tender?

The purchaser reserves the right to increase or decrease the order quantity up to 25% at contract award and during contract execution. Additional quantity time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

What are the OEM turnover requirements for this procurement?

OEMs must meet minimum average annual turnover over the last 3 years as specified in the bid document, supported by audited balance sheets or CA/CMA certificates; in case of multiple bidders, OEMs of the highest bid value must meet this criterion.

What are the service support expectations for bidders?

Bidder/OEM must provide an escalation matrix with telephone numbers for service support; this ensures prompt issue resolution during the warranty/AMC period and post-implementation assistance as per tender terms.