Organization: NMDC Steel Limited; procurement: upgradation of measuring gauges (thickness, profile, flatness, camber) and new Qserver at the Hot Strip Mill; scope includes supplies, spares, installation and commissioning. Location: Bastar, Chhattisgarh. Estimated value and EMD are not disclosed. BOQ shows zero items, implying a service-led, project-based upgrade. Key differentiator is the integration of a new Qserver alongside precision gauge upgrades, under a flexible client clause allowing quantity/duration adjustments up to 25%. No start/end dates released.
Key Term 1: Quantity/duration may be increased up to 25% at contract issue
Key Term 2: Terms from project document prevail over GEM in case of conflict
Key Term 3: EMD, delivery schedule, and payment terms are not disclosed; confirm during bid
Not disclosed in provided data; bidders must verify during bid submission
On-site installation and commissioning for measuring gauges and Qserver; exact timeline not provided
No LD details available; confirm penalties and warranty terms during tender clarification
Experience in upgrading measuring gauges or similar precision instrumentation in steel facilities
Capability to supply spares and perform on-site installation and commissioning
Compliance with local regulations and eligibility criteria in Chhattisgarh
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - Upgradation of Measuring gauges Thickness, Profile, Flatness and Camber and new addition of Qserver at Hot strip mill which includes supplies along with required spares, installation and commissioning
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Raipur
Delivery Pincodes
494001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Munde Nayan | 494001,NMDC STEEL LIMITED, C/o NMDC Iron & Steel Plant, Nagarnar, postbox no.2, Jagdalpur , Dist .Bastar, CG 494001 | Raipur | Chhattisgarh | 494001 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates demonstrating relevant upgradation projects
Financial statements or turnover proof
EMD documentation (amount not specified in data)
Technical bid documents (methodology for measuring gauge upgrade and Qserver integration)
OEM authorizations or approvals for measuring gauges and Qserver components
Any site-visit reports or installation plans if required by NMDC Steel Limited
Key insights about CHHATTISGARH tender market
Bidders should submit the technical bid with methodology for gauge upgrades and Qserver integration, along with required documents (GST, PAN, experience certificates, financials). Ensure compliance with the 25% quantity/duration adjustment clause and verify EMD requirements in the official bid documents.
Required documents typically include GST certificate, PAN, experience certificates, financial statements, EMD documentation, OEM authorizations, and technical bid materials showing approach to installation and commissioning of gauges and Qserver at the hot strip mill.
Expect on-site upgrade of measuring gauges for thickness, profile, flatness, camber, plus installation and commissioning of a Qserver. Supplies and spares must be provided. Detailed standards are not specified; bidders should propose compliant solutions and provide installation plans.
Exact delivery timelines are not disclosed in the available data. Bidders should seek clarification during bid inquiry and align schedules with on-site commissioning requirements after contract award.
The EMD amount is not disclosed in the provided tender data. Bidders must obtain the current EMD figure and payment mechanism (DD/online) from the official tender documents before submission.
No specific standards are listed in the available data. Bidders should confirm if ISO/IEC, BIS, or organization-specific standards apply during bid clarifications and ensure Qserver integration adheres to mill control system interfaces.
The scope includes required spares for the measuring gauges upgrade and Qserver integration. Exact part numbers and quantities are not provided; bidders should propose a bill of materials aligned with upgrade stages and warranty coverage.
Eligibility typically includes prior experience in similar upgrades, financial stability, and valid registrations. Confirm explicit criteria in the terms and submit experience certificates and financial documents to demonstrate capability for on-site installation at a steel mill.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS