Tender Overview
The Indian Army, Department Of Military Affairs, invites bids for a broad set of commodity items including Coupling Large, Coupling Small, Burner Large, Burner Small, Jumbo Valve, Copper Pipe 1 Ft, Roti Burner 2.5 Ft, Copper Pipe 2.5 Ft, Copper Pipe 1.5 Ft, Pipe Nozzle, Connection Pipe 30 Mtr Roll, and Adapter. The procurement is classified under a 12-item BoQ with a supply-only scope. Key terms include an option to vary quantity by up to 25% during contract execution and a flexible delivery timeline linked to delivered quantities. GST handling remains bidder-driven. No start/end dates are stated in the data.
- Organization: Indian Army | Department: Department Of Military Affairs
- Location: Not specified; focus on government supply of steel/copper fittings and burners
- Estimated value and EMD: Not provided
- Primary differentiator: Large, varied catalog within a single tender with quantity adjustment provisions
- Unique aspect: Vendor Code Creation requirements included in the bid process; GST implications clarified as bidder responsibility
Technical Specifications & Requirements
- Product categories include: Coupling Large, Coupling Small, Burner Large, Burner Small, Jumbo Valve, Copper Pipe 1 Ft, Copper Pipe 2.5 Ft, Copper Pipe 1.5 Ft, Pipe Nozzle, Connection Pipe 30 Mtr Roll, Adapter
- BoQ comprises 12 items; no explicit performance specs or material grades provided in the data
- Scope: Supply of Goods only; no installation or after-sales service specified
- Documentation flow: Bidder must align with the option clause and deliver per contract with flexibility up to 25%
- GST handling: bidders must determine applicable GST; reimbursement as per actuals or applicable rates
- Payment/EMD specifics: Not disclosed in the data; bidders should prepare for standard government GST/EFT verification and supplier code setup
Terms, Conditions & Eligibility
- EMD and exact values are not specified in the tender data; bidders must monitor the option clause allowing quantity variations up to 25%
- Delivery period: linked to last date of original delivery order; extended time calculations apply with a minimum of 30 days, adjustable for increased quantities
- GST obligations: bidder bears GST applicability; GST reimbursement as per actuals or applicable rates (whichever is lower)
- Vendor Code Creation: required documents include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank
- Scope: supply-only; no installation or maintenance terms stated; delivery terms and penalties not detailed
- No start/end dates or explicit values; bidders should prepare a structured bid pack and ensure compliance with vendor code prerequisites