Progress
Hindustan Petroleum Corporation Ltd invites bids for a package of electrical equipment and accessories including transformers up to 400 KVA, oil-type transformers 160 KVA, 11 KV VCBs (3-way & 2-way), load break switches, G O D O 11 KV switches with 2 cement poles, copper GI earthings (chemical) and HT/LT cables (120 Sqmm & 300 Sqmm), in JODHPUR, RAJASTHAN 342001. Estimated value not disclosed; EMD ₹78,000. The tender comprises 16 BOQ items with flexible quantity up to 25% per order. The bid must align with HPCL GTC precedence and include extensive financial/documents submissions as per Form 12. This opportunity targets suppliers with capability to supply high‑voltage electrical infrastructure components for refinery or substation upgrades. Unique clause includes option to adjust quantity within 25% at contract rates and delivery timing linked to last delivery order date.
EMD ₹78,000
16 BOQ items
25% quantity variation
Delivery based on last delivery order date
Section VI-1 & Form 12 submission
GST, PAN, Udyam certificates
HPCL GTC precedence over GEM GTC
11 KV electrical components and associated cables (120 Sqmm, 300 Sqmm)
EMD of ₹78,000 must accompany bid
Quantity may vary up to 25% during contract
Upload Form 12, Section VI-1 and all specified documents
HPCL GTC precedence governs terms
Last delivery order date governs delivery schedule
EMD with bid; payment terms per HPCL GTC; no specific milestones disclosed
Delivery period linked to last delivery order date; option to adjust time based on quantity variation with minimum 30 days
Not expressly stated; bidders should assume standard HPCL GTC LD provisions and ensure timely delivery
Demonstrated ability to supply high-voltage electrical equipment (transformers, switchgear, and cables)
Compliance with HPCL GTC and Form 12 submission requirements
Financially sound with last 3 years financial statements
Quantity
223
Category
TRANSFORMER 400 KVA
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
12
OEM Avg. Turnover
12
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
TRANSFORMER 400 KVA , OIL TYPE TRANSFORMER160 KVA , 11 KV VCE 3 WAY , 11KV VCE 2 WAY , 11 KV LOAD BREAK SWITCH , G O D O 11 KV SWITCH WITH 2 CEMENT POLES , COPPER EARTHING Chemical , GI EARTHING chemical , 120 Sqmm Al CABLE , 300Sqm AL Cable , HT METER BOX , HT JOINT BOX INDOOR AND OUTDOOR , CT PT 20 by 5 , CT PT 15 by 5 , RIGHT ANGLE BOOT , JDVVNL LIASONING
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
18
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Jodhpur
Delivery Pincodes
342005
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mukul Gupta | 342005,Jodhpur Retail Regional Office, Diesel Shed Road, Bhagat Ki Kothi, Jodhpur - 342005 | Jodhpur | Rajasthan | 342005 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
TRANSFORMER 400 KVA
TRANSFORMER 400 KVA
OIL TYPE TRANSFORMER160 KVA
OIL TYPE TRANSFORMER160 KVA
11 KV VCE 3 WAY
11 KV VCE 3 WAY
11KV VCE 2 WAY
11KV VCE 2 WAY
11 KV LOAD BREAK SWITCH
11 KV LOAD BREAK SWITCH
G O D O 11 KV SWITCH WITH 2 CEMENT POLES
G O D O 11 KV SWITCH WITH 2 CEMENT POLES
COPPER EARTHING Chemical
COPPER EARTHING Chemical
GI EARTHING chemical
GI EARTHING chemical
120 Sqmm Al CABLE
120 Sqmm Al CABLE
300Sqm AL Cable
300Sqm AL Cable
HT METER BOX
HT METER BOX
HT JOINT BOX INDOOR AND OUTDOOR
HT JOINT BOX INDOOR AND OUTDOOR
CT PT 20 by 5
CT PT 20 by 5
CT PT 15 by 5
CT PT 15 by 5
RIGHT ANGLE BOOT
RIGHT ANGLE BOOT
JDVVNL LIASONING
JDVVNL LIASONING
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | TRANSFORMER 400 KVA | TRANSFORMER 400 KVA | 1 | each | con653.hpcl.pb | 45 | |
| 2 | OIL TYPE TRANSFORMER160 KVA | OIL TYPE TRANSFORMER160 KVA | 1 | each | con653.hpcl.pb | 45 | |
| 3 | 11 KV VCE 3 WAY | 11 KV VCE 3 WAY | 1 | each | con653.hpcl.pb | 45 | |
| 4 | 11KV VCE 2 WAY | 11KV VCE 2 WAY | 1 | each | con653.hpcl.pb | 45 | |
| 5 | 11 KV LOAD BREAK SWITCH | 11 KV LOAD BREAK SWITCH | 1 | each | con653.hpcl.pb | 45 | |
| 6 | G O D O 11 KV SWITCH WITH 2 CEMENT POLES | G O D O 11 KV SWITCH WITH 2 CEMENT POLES | 1 | each | con653.hpcl.pb | 45 | |
| 7 | COPPER EARTHING Chemical | COPPER EARTHING Chemical | 2 | each | con653.hpcl.pb | 45 | |
| 8 | GI EARTHING chemical | GI EARTHING chemical | 5 | each | con653.hpcl.pb | 45 | |
| 9 | 120 Sqmm Al CABLE | 120 Sqmm Al CABLE | 100 | ream | con653.hpcl.pb | 45 | |
| 10 | 300Sqm AL Cable | 300Sqm AL Cable | 100 | ream | con653.hpcl.pb | 45 | |
| 11 | HT METER BOX | HT METER BOX | 1 | each | con653.hpcl.pb | 45 | |
| 12 | HT JOINT BOX INDOOR AND OUTDOOR | HT JOINT BOX INDOOR AND OUTDOOR | 4 | each | con653.hpcl.pb | 45 | |
| 13 | CT PT 20 by 5 | CT PT 20 by 5 | 1 | each | con653.hpcl.pb | 45 | |
| 14 | CT PT 15 by 5 | CT PT 15 by 5 | 1 | each | con653.hpcl.pb | 45 | |
| 15 | RIGHT ANGLE BOOT | RIGHT ANGLE BOOT | 2 | each | con653.hpcl.pb | 45 | |
| 16 | JDVVNL LIASONING | JDVVNL LIASONING | 1 | lumpsum | con653.hpcl.pb | 45 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Udyam Certificate
Form 12 (Section VI-1) duly filled and signed
Integrity Pact (if applicable)
PO + Completion Letter or PO + All Invoices of similar works with value mentioned in tender
Profit and Loss Statement & Balance Sheet for last 3 financial years
EMD documentation (payment proof)
Technical bid documents demonstrating compliance with HPCL GTC
OEM authorization (if required by Form 12)
Key insights about RAJASTHAN tender market
Bidders must submit Section VI-1 and Form 12 with GST, PAN, Udyam, Integrity Pact (if applicable), POs of similar works, and last 3 years financials. Include EMD ₹78,000 and comply with HPCL GTC precedence. Ensure OEM authorizations if required and bow to 25% quantity variation clause.
Submit GST certificate, PAN, Udyam, Form 12 (Section VI-1), Integrity Pact (if applicable), PO/Invoices for similar projects, Profit & Loss and Balance Sheet for 3 years, EMD proof, and technical bid detailing compliance with HPCL GTC and 16 BOQ items.
The EMD is ₹78,000. Submit via online payment or as specified in tender terms; ensure EMD accompanies the bid to avoid rejection and confirm online remittance proof in Form 12 submission.
The purchaser may increase/decrease quantity up to 25% at contract; delivery period extends based on a formula from the last delivery date, with a minimum 30 days extension. Ensure schedule aligns with last delivery order date.
Tender data cites no explicit standards; bidders should verify HPCL GTC requirements and provide OEM authorization where needed, plus IS/IEC compliance as applicable to electrical transformers, switchgear, and cables in the bid package.
The BOQ comprises 16 items covering transformers, 11 KV switchgear, earthing chemicals, HT cables, meter boxes, CT/PT assemblies, and related accessories; exact item descriptions are not disclosed in the data, requiring bidder compliance with Form 12 and HPCL terms.
Start and end dates are not provided in the tender data. Bidders should monitor GeM notifications and HPCL procurement announcements for activation, with readiness to submit Form 12, financials, and EMD upon tender release.
Eligibility requires GST, PAN, Udyam, Form 12, Integrity Pact (if applicable), prior PO/Invoices for similar works, last 3 years financials, and OEM authorizations where required; ensure all documents are current and accurately reflect project scale.