TenderDekho Logo
Closed GEM

Indian Army Brake Plate Assy, Pressure Plate Assy, Rotavator Yoke Tender Samba Jammu & Kashmir 2026

Bid Publish Date

08-Aug-2026, 2:43 pm

Bid End Date

20-Aug-2026, 7:00 pm

Progress

Issue08-Aug-2026, 2:43 pm
Technical19-08-2026 18:26:50
Financial
AwardCompleted

Tender Overview

Indian Army is seeking procurement of multiple tractor-related assemblies and components, including Brake Plate Assembly, Pressure Plate Assembly, Top Link Assembly Adjusting Link, Oil Seal, Rubber Boot for Wet Dust Seal, Shim Set, Special Bolt MS, Seal Nanda Tractor, Universal Joint, Rotavator Yoke Upper, and Rotavator Yoke Lower. The tender covers 11 items in the category of agricultural machinery parts, located in Samba, Jammu & Kashmir. The bid features a quantity option allowing up to 25% additional quantity at contracted rates, with delivery timelines governed by the original and extended periods. Pre-sample submission is required by the seller per ATC. Documentation requirements include PAN, GST, Cancelled Cheque, and EFT Mandate.

Technical Specifications & Requirements

  • No explicit technical specifications provided in the data.
  • BOQ indicates 11 items with N/A quantities and units; no estimated value or EMD amount disclosed.
  • Items span brake, pressure, linkage assemblies, seals, shims, bolts, joints, and rotavator yokes; procurement scope focuses on spare parts compatibility with agricultural tractors.
  • Buyer terms authorize quantity variation up to 25% and specify ATC pre-sample submission by the seller.
  • Delivery schedule references “last date of original delivery order” with calculations for extended delivery; minimum 30 days extension rule applies.

Terms, Conditions & Eligibility

  • Option Clause permits up to 25% quantity increase/decrease during and after contract at contracted rates.
  • Required bidder documents: PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate (certified by bank).
  • Buyer may terminate for non-compliance, delivery failure, insolvency, or misrepresentation.
  • ATC mandates pre-sample of all items; seller must provide all required documents before bid participation.
  • No specific EMD or payment terms disclosed; bidders should prepare standard compliance documents and ensure eligibility criteria are met.

Key Specifications

  • Product categories: Brake Plate Assembly, Pressure Plate Assembly, Top Link Assembly Adjusting Link, Oil Seal, Rubber Boot for Wet Dust Seal, Shim Set, Special Bolt MS, Seal Nanda Tractor, Universal Joint, Rotavator Yoke Upper, Rotavator Yoke Lower

  • Quantity/BOQ: 11 items; quantities not disclosed; units not specified

  • Delivery: Calculations linked to original vs extended delivery period with a minimum 30 days

  • Quality/Compliance: Not specified in data; ATC requires pre-sample and seller-provided documentation

  • Brand/OEM: Not specified

Terms & Conditions

  • Quantity variation up to 25% at contract and during currency at contracted rates

  • Pre-sample submission required; all bidders must provide required documents before bid participation

  • Termination rights reserved by Buyer for delivery failure, non-compliance, insolvency, or misrepresentation

Important Clauses

Payment Terms

Not specified in data; bidders should anticipate standard government procurement terms and verify in final ATC

Delivery Schedule

Delivery timeline starts from last date of original delivery order; extended period uses a calculated formula with a minimum 30 days

Penalties/Liquidated Damages

Termination rights exist for delayed or non-delivery; LD provisions not explicitly stated in data

Bidder Eligibility

  • GST registration and PAN availability

  • Ability to supply 11 listed tractor parts/components

  • Compliance with vendor code creation and pre-sample submission

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
PRAKRAM ENTERPRISES   Under PMA
-19-08-2026 18:26:50
2
QUALITY UNIFORMS   Under PMA
-19-08-2026 19:19:44
3
SHARMA DIGITAL TECHNOLOGIES   Under PMA
-19-08-2026 18:36:38

Financial Results

Rank Seller Price Item
L1
PRAKRAM ENTERPRISES(MSE)( MSE Social Category:General )    Under PMA
Item Categories : Brake Plate Assy,Pressure Plate Assy,Top Link Assy Adjusting Link,Oil Seal,Rubber Boot Forwet Dust
L2
SHARMA DIGITAL TECHNOLOGIES (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Brake Plate Assy,Pressure Plate Assy,Top Link Assy Adjusting Link,Oil Seal,Rubber Boot Forwet Dust
L3
QUALITY UNIFORMS (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Brake Plate Assy,Pressure Plate Assy,Top Link Assy Adjusting Link,Oil Seal,Rubber Boot Forwet Dust

Tender Data

Bid Details

Quantity

27

Category

Rubber Boot Forwet Dust Seal

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

30 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Brake Plate Assy , Pressure Plate Assy , Top Link Assy Adjusting Link , Oil Seal , Rubber Boot Forwet Dust Seal , Shim Set , Special Bolt MS , Seal Nanda Tractor , Universal Joint , Rotavator Yoke Upper , Rotavator Yoke Lower

Delivery Details

Max Delivery Days

21

Delivery Locations

1

Delivery Cities

Samba

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SambaSamba--421-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9729641.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

Brake Plate Assy

Brake Plate Assy

4 nos Delivery: 21 days
#2

Pressure Plate Assy

Pressure Plate Assy

2 nos Delivery: 21 days
#3

Top Link Assy Adjusting Link

Top Link Assy Adjusting Link

2 nos Delivery: 21 days
#4

Oil Seal

Oil Seal

2 nos Delivery: 21 days
#5

Rubber Boot Forwet Dust Seal

Rubber Boot Forwet Dust Seal

2 nos Delivery: 21 days
#6

Shim Set

Shim Set

6 nos Delivery: 21 days
#7

Special Bolt MS

Special Bolt MS

4 nos Delivery: 21 days
#8

Seal Nanda Tractor

Seal Nanda Tractor

1 nos Delivery: 21 days
#9

Universal Joint

Universal Joint

2 nos Delivery: 21 days
#10

Rotavator Yoke Upper

Rotavator Yoke Upper

1 nos Delivery: 21 days
#11

Rotavator Yoke Lower

Rotavator Yoke Lower

1 nos Delivery: 21 days

Categories 7

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate duly certified by Bank

5

Pre-sample of all items as per ATC

6

All reqd documents will be provided by the seller before participating in the bid (Vendor Code Creation)

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid in the Indian Army tractor parts tender in Samba JK 2026?

To bid in this tender, bidders must register as a vendor, provide PAN, GSTIN, Cancelled Cheque, and EFT Mandate, and submit pre-sample items as per ATC. Ensure willingness to handle up to 25% quantity variation and comply with delivery terms linked to original and extended schedules.

What documents are required for the Indian Army parts tender in Samba?

Required documents include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank. Also prepare pre-sample submissions for all 11 listed components and vendor code creation materials as specified by buyer ATC.

What are the delivery terms for the Samba tractor parts procurement?

Delivery starts from the last date of the original delivery order; extended deliveries use a calculated extension: (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.

Which components are included in the Samba JK tractor parts tender 2026?

The tender covers Brake Plate Assembly, Pressure Plate Assembly, Top Link Assembly Adjusting Link, Oil Seal, Rubber Boot for Wet Dust Seal, Shim Set, Special Bolt MS, Seal Nanda Tractor, Universal Joint, Rotavator Yoke Upper, and Rotavator Yoke Lower.

What are the eligibility criteria for bidders in this Indian Army procurement?

Eligibility requires GST registration, PAN, ability to supply 11 specified components, and successful submission of pre-sample items per ATC. Maintain compliance with vendor code creation and bank-EFT requirements.

What happens if a bidder fails to deliver on time for this tender?

The buyer may terminate the contract or part thereof for non-delivery or delays, and may pursue remedies including price adjustments, replacements, or penalties as per the ATC terms.