TenderDekho Logo
Active GEM

Procurement Opportunity: Manual excavation or digging works for cable laying,Laying of LT power cable in existing trench 2 r in HYDERABAD, TELANGANA

Bid Publish Date

24-Aug-2026, 6:35 pm

Bid End Date

07-Sep-2026, 7:00 pm

Progress

Issue24-Aug-2026, 6:35 pm
AwardPending

A tender has been published for Bharat Dynamics Limited Manual excavation or digging works for cable laying, Laying of LT power cable in existing trench 2 runs, Laying of LT power cable in existing trench 4 runs, Supply and laying of 4C x 10 sq mm, Road cutting works and refilling with concrete, Supply and laying of 150 mm dia RCC Hume pipe, Supply and laying of 300 mm dia RCC Hume pipe, Laying and fixing of cable tray with cover and support, cable termination works 4C x10 sq mm Al cable, cable termination works 300 sq mm Al cable, Supply of 300 sq mm LT Straight termination kit in HYDERABAD, TELANGANA. Quantity: 2080 by. Submission Deadline: 07-09-2026 19: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

2080

Category

Manual excavation or digging works for cable laying

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Manual excavation or digging works for cable laying , Laying of LT power cable in existing trench 2 runs , Laying of LT power cable in existing trench 4 runs , Supply and laying of 4C x 10 sq mm , Road cutting works and refilling with concrete , Supply and laying of 150 mm dia RCC Hume pipe , Supply and laying of 300 mm dia RCC Hume pipe , Laying and fixing of cable tray with cover and support , cable termination works 4C x10 sq mm Al cable , cable termination works 300 sq mm Al cable , Supply of 300 sq mm LT Straight termination kit

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Hyderabad

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-HyderabadHyderabad--55030-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9801422.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

Manual excavation or digging works for cable laying

As per Technical spec

550 meters Delivery: 30 days
#2

Laying of LT power cable in existing trench 2 runs

As per Technical spec

640 meters Delivery: 30 days
#3

Laying of LT power cable in existing trench 4 runs

As per Technical spec

160 meters Delivery: 30 days
#4

Supply and laying of 4C x 10 sq mm

As per Technical spec

600 meters Delivery: 30 days
#5

Road cutting works and refilling with concrete

As per Technical spec

20 meters Delivery: 30 days
#6

Supply and laying of 150 mm dia RCC Hume pipe

As per Technical spec

10 meters Delivery: 30 days
#7

Supply and laying of 300 mm dia RCC Hume pipe

As per Technical spec

10 meters Delivery: 30 days
#8

Laying and fixing of cable tray with cover and support

As per Technical spec

40 meters Delivery: 30 days
#9

cable termination works 4C x10 sq mm Al cable

As per Technical spec

40 each Delivery: 30 days
#10

cable termination works 300 sq mm Al cable

As per Technical spec

4 each Delivery: 30 days
#11

Supply of 300 sq mm LT Straight termination kit

As per Technical spec

6 each Delivery: 30 days