Progress
Mishra Dhatu Nigam Limited (MDN) in Hyderabad, Telangana invites bids for the supply of ALUMINIUM OXIDE EMERY BELTS sized WIDTH: 300MM; LENGTH: 1310MM, GRIT/GRAIN 220, quantity 1000 Nos. Belts must be from DEERFOS/Cumi/Grindwell Norton brands, with cloth described as ALOXIDE emery and a Tape joint. Delivery is 6 weeks from PO date; first lot of 5 belts within 2 weeks of order placement, with balance on acceptance. Payment terms are 100% within 30 days after receipt and acceptance at MIDHANI. Scope is strictly the supply of goods; no services included.
Aluminium Oxide Emery Belts
Quantity: 1000 Nos
Dimensions: 300 mm width x 1310 mm length
Grit: 220
Cloth: ALOXIDE emery
Joint: Tape joint
Make: DEERFOS/Cumi/Grindwell Norton
Delivery: 6 weeks from PO; first lot 5 belts within 2 weeks
Acceptance: post-first-lot acceptance
Payment: 100% within 30 days of receipt/acceptance at MDHANI
PO-based delivery within 6 weeks with an initial 2-week window for first 5 belts
100% payment within 30 days after receipt and acceptance at the MIDHANI facility
Quantity may vary up to 50% under the option clause with adjusted delivery timelines
100% payment within 30 days from date of receipt and acceptance at MIDHANI
Delivery of first lot (5 belts) within 2 weeks; total delivery within 6 weeks from PO
Delivery schedule adherence per ATC; penalties to be as per MIDHANI terms
Ability to supply aluminum oxide emery belts meeting specified dimensions and grit
Brand conformity to DEERFOS/Cumi/Grindwell Norton
Compliant with bidder document submission: PAN, GST, EFT mandate, cancelled cheque
Quantity
1000
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ALUMINIUM OXIDE EMERY BELTS SIZE - WIDTH: 300MM; LENGTH: 1310MM, GRIT/GRAIN 220
Advisory Bank
HDFC Bank
ePBG Percentage
5%
ePBG Duration (Months)
5
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
42
Delivery Locations
1
Delivery Cities
Hyderabad
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Hyderabad | Hyderabad | - | - | 1000 | 42 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by Bank
Any MSME/MII certificate (if applicable) per ATC
Vendor code creation documents
Key insights about TELANGANA tender market
Bidders should prepare PAN, GST, cancelled cheque, and EFT mandate, plus vendor code creation documents. Ensure belt dimensions 300 mm x 1310 mm with 220 grit, cloth as ALoxide, tape joint, and brands DEERFOS/Cumi/Grindwell Norton. Delivery is 6 weeks from PO, with first 5 belts due within 2 weeks. Payment is 100% within 30 days of receipt/acceptance.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by Bank, and any MSME/MII certificates if applicable. These must be uploaded with the bid for vendor code creation, along with evidence of capability to supply 1000 belts at 300x1310x220 grit.
Belts must be 300 mm wide, 1310 mm long, with 220 grit, made of ALoxide emery cloth, and tape joint. Brand options are DEERFOS, Cumi, or Grindwell Norton. Quantity is 1000 belts; first delivery of 5 belts within 2 weeks after order; total delivery 6 weeks from PO.
The overall delivery deadline is 6 weeks from the Purchase Order date. The first lot comprises 5 belts to be delivered within 2 weeks of order placement, after which the remainder is delivered subject to acceptance of the first lot.
Bidders should expect 100% payment within 30 days from the date of receipt and acceptance of material at MIDHANI. Ensure invoicing aligns with acceptance milestones and proper delivery documentation is provided to trigger payment.
Yes. The purchaser reserves the right to vary the quantity by up to 50% at contract award, with corresponding adjustments to delivery timelines. Additional time calculations are based on the formula provided and must meet a minimum 30 days.