60T WEIGH BRIDGE UPGRADATION/MODIFICATION (SUPPLY, INSTALLATION, COMMISSIONING & TESTING)
Bharat Heavy Electricals Limited (bhel)
UDHAM SINGH NAGAR, UTTARAKHAND
Bid Publish Date
30-Jun-2026, 10:10 am
Bid End Date
20-Jul-2026, 11:00 am
Location
Progress
Quantity
2
Bid Type
Two Packet Bid
Organization: Office Of Dg (ace), within the Department Of Defence Research & Development. Procurement scope includes Manufacturing, Integration, Testing and Supply of the 40m MLC-60 Bridge. Estimated value and start/end dates are not disclosed. The bid requires Supply, Installation, Testing and Commissioning of the bridge system, with a focus on meeting OEM turnover and bidder turnover criteria. Unique aspects include vendor code creation documentation requirements and OEM-related turnover thresholds, signaling a high-compliance, technically rigorous opportunity for bridge fabrication and field deployment. The tender emphasizes performance andOEM capability along with financial credibility.
Product: 40m MLC-60 Bridge
Scope: Supply, Installation, Testing and Commissioning (SITC)
Turnover: Minimum average annual turnover last 3 years; documents: audited balance sheets or CA certificate
OEM Turnover: OEM must meet turnover criteria; for bunch bids, OEM of primary product category with highest bid value must comply
Vendor documents: PAN, GSTIN, cancelled cheque, EFT Mandate verified by bank
Turnover evidence required for bidder and OEM
SITC included in bid price
Vendor code requires PAN, GSTIN, cancelled cheque, EFT mandate
Bid price must include all cost components; payment terms not specified beyond SITC scope
Not specified; implies turnkey SITC with installation and commissioning
Not specified in available data
Minimum 3 years average annual turnover demonstrated for bidder
OEM turnover criteria met; if bunch bid, highest value OEM must comply
Submission of PAN, GSTIN, cancelled cheque, and EFT mandate with bid
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Manufacturing, Integration, Testing and Supply of 40m MLC- 60 Bridge
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Heavy Electricals Limited (bhel)
UDHAM SINGH NAGAR, UTTARAKHAND
Office Of Dg (ace)
PUNE, MAHARASHTRA
Bharat Petroleum Corporation Ltd
N/A
ANUGUL, ODISHA
HP SIDC Limited
SIRMAUR, HIMACHAL PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Bidders must submit a complete SITC bid including Supply, Installation, Testing and Commissioning. Provide turnover proofs for both bidder and OEM (audited balances or CA certificate for last 3 years). Include PAN, GSTIN, cancelled cheque, and EFT mandate. Ensure OEM capacity meets category turnover thresholds for highest bid value if bidding in a bunch.
Submit PAN, GSTIN, cancelled cheque, and EFT mandate with bid. Provide audited financial statements or CA certificates showing three-year turnover. OEM turnover evidence and bidder turnover must meet minimum criteria. No BOQ items are listed; bid covers turnkey SITC of the 40m MLC-60 Bridge.
Current data lists no explicit standards; bidders should ensure compliance with OEM turnover norms and provide financial documentation. If there are implicit standards, cooperation with OEM and verification of any statutory compliances is advised; verify ISI/ISO requirements if specified in later addenda.
The bid scope includes Supply, Installation, Testing and Commissioning of the 40m MLC-60 Bridge. Price should cover all costs; no separate BOQ exists. Successful bidders must deliver turnkey integration and system commissioning, with post-installation verification.
Exact bid submission deadline is not provided in the current data; bidders should monitor official tender updates and ensure all turnover proofs, PAN, GSTIN, cancelled cheque, and EFT mandate are prepared ahead of the stated but undisclosed deadline.
Provide the OEM's average annual turnover for the last three financial years ending March 31 of the previous year, supported by audited balance sheets or CA certificates. If new OEMs, use completed years post-incorporation; for bunch bids, ensure the OEM with highest bid value meets the criterion.
Payment terms are not explicitly stated; bid requires all-in pricing. Suppliers should anticipate standard government terms: milestone-based payments after delivery, with satisfactory testing and commissioning, and possible bank guarantees as per bid conditions.
Department of Agriculture- World Bank Tenders
📍 NANDED, MAHARASHTRA
Office Of Dg (ace)
📍 PUNE, MAHARASHTRA
Meja Urja Nigamplimited
📍 ALLAHABAD, UTTAR PRADESH
IREL (INDIA) Limited
📍 ERNAKULAM, KERALA
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS