Progress
Organization: Deputy Commissioner Thoubal, Revenue Department, located in THOUBAL, MANIPUR - 795103. Procurement category: Mobile Storage Compactors. Project scope: Tender for supply of mobile storage compactors; BOQ shows 0 items, indicating either early stage or framework requirement. Estimated value and EMD details are not disclosed in the available data. A notable differentiator is the included OPTION CLAUSE allowing ±25% quantity adjustments at contract award or during currency, at contracted rates. The ATC document linked by the buyer may specify additional conditions. This tender is positioned to address storage mobility needs within the revenue department’s scope.
Product/service names: Mobile Storage Compactors
Quantities/values: Not disclosed; quantity variation allowed ±25%
EMD/estimated value: Not disclosed
Experience: Prior supply of storage equipment advisable (not explicitly stated)
Quality/standards: Not specified
Delivery/installation: Delivery timeline and option clause apply
Option Clause allows ±25% quantity variation at contract and during currency
Delivery period adjustments follow a computed formula with a 30-day minimum
ATC document governs additional terms and bidder obligations
Delivery begins from the last date of original delivery order; extended period uses (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days
Purchaser may increase or decrease quantity up to 25% at placement and during currency at contracted rates
Bidder must review and comply with the uploaded ATC document for all terms
Must comply with option clause and delivery extensions
Submit standard GST, PAN, and financial documents
Adhere to ATC terms and any OEM/authorisation requirements
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Min. Avg. Annual Turnover
7
OEM Avg. Turnover
85
Past Performance
20 %
Warranty Period
1 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Mobile Storage Compactors (Q3)
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
75
Delivery Locations
1
Delivery Cities
Thoubal
Delivery Pincodes
795138
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Langpoklakpam Thamison Singh | 795138,Office of the Deputy Commissioner, Thoubal Athokpam | Thoubal | Manipur | 795138 | 1 | 75 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar mobilStorage equipment supply
Financial statements (last 2-3 years)
EMD/Security deposit payment proof (as per ATC)
Technical bid documents and compliance statements
OEM authorization (if applicable) and product datasheets
Any ATC-specific forms or declarations uploaded by buyer
Key insights about MANIPUR tender market
Submit the required documents per ATC: GST, PAN, financial statements, experience certificates, and OEM authorizations if needed. Ensure compliance with the option clause allowing ±25% quantity variation and provide delivery timelines per the 30‑day minimum extension rule.
Prepare GST certificate, PAN card, two to three years of financials, experience certificates for similar storage equipment, EMD proof, technical bid, and OEM authorization if applicable. Ensure ATC-specific forms are completed and signed.
Delivery starts after the original delivery order; extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days, and may be extended to the original period if required.
Experience in supplying storage equipment or similar mobile storage solutions is advantageous; however, the ATC specifies exact eligibility criteria, which should be reviewed and demonstrated via previous project certificates and references.
The purchaser may increase or decrease the order by up to 25% at contract award and during currency, at contracted rates; bidders should price accordingly and plan inventory and logistics to accommodate possible changes.
ATC details are uploaded by the buyer in the bid portal; bidders must view and strictly comply with all terms in the ATC document to avoid disqualification.
Delivery timeline adjustments are triggered by quantity changes; the formula yields a minimum 30 days extension, with computation based on original delivery period, ensuring feasible scheduling for mobilStorage equipment.