Bid Publish Date
22-Jul-2026, 1:56 pm
Bid End Date
12-Aug-2026, 2:00 pm
EMD
₹1,68,253
Location
Progress
RAPublic procurement opportunity for Indian Army 9 U Rack, 24 U Rack, 4 MP ANPR Camera, 8TB Surveillance HHD, 24 Port Core Switch L2 Managed, 8 Port PoE Switch, 40 MM PLB HDPE Pipe, GI Pole for Camera Mounting, 40 mm GI Pipe, OFC Route Marker, Camera Mount with Junction Box, PVC Conduit 25MM, Splicing and OTDR of each OFC Cores, Fixing and termination of CAT6 Patch Panel, Installation Integration Commissioning and Onsite support Charges in INDORE, MADHYA PRADESH. Quantity: 7590 issued by. Submission Deadline: 12-08-2026 14: 00: 00. View full details and respond.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | EWIT INFOTECH(MSE,MII) Under PMA Winner | ₹22,85,540 | Item Categories : 9 U Rack,24 U Rack,4 MP ANPR Camera,8TB Surveillance HHD,24 Port Core Switch L2 Managed,8 Port PoE |
| L2 | MAGNUM COMPUTERS (MSE,MII) Under PMA | ₹28,10,740 | Item Categories : 9 U Rack,24 U Rack,4 MP ANPR Camera,8TB Surveillance HHD,24 Port Core Switch L2 Managed,8 Port PoE |
| L3 | HAZZALE BLUE TRADING PRIVATE LIMITED (MSE) Under PMA | ₹67,32,330 | Item Categories : 9 U Rack,24 U Rack,4 MP ANPR Camera,8TB Surveillance HHD,24 Port Core Switch L2 Managed,8 Port PoE |
🎉 L1 Winner
EWIT INFOTECH(MSE,MII) Under PMA
Final Price: ₹22,85,540
Start
23-Sep-2026, 2:00 pm
End
24-Sep-2026, 2:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
7590
Category
4 MP ANPR Camera
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
OEM Avg. Turnover
14
Past Performance
40 %
Warranty Period
3 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
9 U Rack , 24 U Rack , 4 MP ANPR Camera , 8TB Surveillance HHD , 24 Port Core Switch L2 Managed , 8 Port PoE Switch , 40 MM PLB HDPE Pipe , GI Pole for Camera Mounting , 40 mm GI Pipe , OFC Route Marker , Camera Mount with Junction Box , PVC Conduit 25MM , Splicing and OTDR of each OFC Cores , Fixing and termination of CAT6 Patch Panel , Installation Integration Commissioning and Onsite support Charges
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
38
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
INDORE
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | INDORE | INDORE | - | - | 9 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
9 U Rack
9 U Rack
24 U Rack
24 U Rack
4 MP ANPR Camera
4 MP ANPR Camera
8TB Surveillance HHD
8TB Surveillance HHD
24 Port Core Switch L2 Managed
24 Port Core Switch L2 Managed
8 Port PoE Switch
8 Port PoE Switch
40 MM PLB HDPE Pipe
40 MM PLB HDPE Pipe
GI Pole for Camera Mounting
GI Pole for Camera Mounting
40 mm GI Pipe
40 mm GI Pipe
OFC Route Marker
OFC Route Marker
Camera Mount with Junction Box
Camera Mount with Junction Box
PVC Conduit 25MM
PVC Conduit 25MM
Splicing and OTDR of each OFC Cores
Splicing & OTDR of each OFC Cores
Fixing and termination of CAT6 Patch Panel
Fixing and termination of CAT6 Patch Panel
Installation Integration Commissioning and Onsite support Charges
Installation Integration Commissioning and Onsite support Charges
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 9 U Rack | 9 U Rack | 9 | nos | gso1it_gem | 60 | |
| 2 | 24 U Rack | 24 U Rack | 1 | nos | gso1it_gem | 60 | |
| 3 | 4 MP ANPR Camera | 4 MP ANPR Camera | 2 | nos | gso1it_gem | 60 | |
| 4 | 8TB Surveillance HHD | 8TB Surveillance HHD | 13 | nos | gso1it_gem | 60 | |
| 5 | 24 Port Core Switch L2 Managed | 24 Port Core Switch L2 Managed | 1 | nos | gso1it_gem | 60 | |
| 6 | 8 Port PoE Switch | 8 Port PoE Switch | 10 | nos | gso1it_gem | 60 | |
| 7 | 40 MM PLB HDPE Pipe | 40 MM PLB HDPE Pipe | 2,500 | nos | gso1it_gem | 60 | |
| 8 | GI Pole for Camera Mounting | GI Pole for Camera Mounting | 6 | nos | gso1it_gem | 60 | |
| 9 | 40 mm GI Pipe | 40 mm GI Pipe | 300 | nos | gso1it_gem | 60 | |
| 10 | OFC Route Marker | OFC Route Marker | 50 | nos | gso1it_gem | 60 | |
| 11 | Camera Mount with Junction Box | Camera Mount with Junction Box | 54 | nos | gso1it_gem | 60 | |
| 12 | PVC Conduit 25MM | PVC Conduit 25MM | 4,575 | nos | gso1it_gem | 60 | |
| 13 | Splicing and OTDR of each OFC Cores | Splicing & OTDR of each OFC Cores | 60 | nos | gso1it_gem | 60 | |
| 14 | Fixing and termination of CAT6 Patch Panel | Fixing and termination of CAT6 Patch Panel | 8 | nos | gso1it_gem | 60 | |
| 15 | Installation Integration Commissioning and Onsite support Charges | Installation Integration Commissioning and Onsite support Charges | 1 | job | gso1it_gem | 90 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer