Progress
Product/service names: AIR DRYER WABCO, BULB 24V, BANJO BOLT, CHANGE OVER SWITCH, STAINER FUEL, PITIFUL COIL, OIL FILTER ASSY IMPROVED, OIL SEAL, THERMOSTAT INSERT, VOLTMETER VDO, HANDLE, FUEL WATER SEPARATOR, FILTER ELEMENT PRIMARY, SUSPENSION BUSH KIT
Quantities: 14 total items; exact quantities not provided
EMD/Estimated value: Not specified
Experience: Not specified
Quality/standards: Not explicitly specified; advices to align with ATC/defence norms
Delivery: Option to modify quantity up to 25% during contract; delivery period recalculations formula provided
Quantity variation up to 25% during contract
Advance sample required before technical bid opening
Documents: PAN, GST, cancelled cheque, EFT mandate
Bidder must not be in liquidation or bankruptcy
Vendor onboarding requires submitting procurement-specific documents
Not specified in data; expect standard defence terms per ATC; verify in final documents.
Delivery period can extend with option clause; additional time formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Not detailed in data; confirm LD terms in final ATC.
Not under liquidation, court receivership, or bankruptcy
Provide undertaking confirming financial standing
Submit PAN, GSTIN, cancelled cheque, and EFT mandate
Quantity
44
Category
AIR DRYER WABCO
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
20 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
AIR DRYER WABCO , BULB 24V , BANJO BOLT , CHANGE OVER SWITCH , STAINER FUEL , PITIFUL COIL , OIL FILTER ASSY IMPROVED , OIL SEAL , THERMOSTAT INSERT , VOLTMETER VDO , HANDLE , FUEL WATER SEPRATOR , FILTER ELEMENT PRIMARY , SUSPENSION BUSH KIT
Max Delivery Days
21
Delivery Locations
1
Delivery Cities
Nagaon
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Nagaon | Nagaon | - | - | 1 | 21 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
AIR DRYER WABCO
TATRA 4X4 6X6
BULB 24V
TATRA 4X4 6X6
BANJO BOLT
5 TON STLN
CHANGE OVER SWITCH
TATA 3 5 TON FAT
STAINER FUEL
TATA 3 5 TON FAT
PITIFUL COIL
TATRA 4X4 6X6
OIL FILTER ASSY IMPROVED
TATA 3 5 TON FAT
OIL SEAL
5 TON STLN
THERMOSTAT INSERT
TATA 3 5 TON FAT
VOLTMETER VDO
TATRA 4X4 6X6
HANDLE
5 TON STLN
FUEL WATER SEPRATOR
TATA 3 5 TON FAT
FILTER ELEMENT PRIMARY
TATA 3 5 TON FAT
SUSPENSION BUSH KIT
MARUTY GYPSY
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | AIR DRYER WABCO | TATRA 4X4 6X6 | 1 | nos | [email protected] | 21 | |
| 2 | BULB 24V | TATRA 4X4 6X6 | 2 | nos | [email protected] | 21 | |
| 3 | BANJO BOLT | 5 TON STLN | 18 | nos | [email protected] | 21 | |
| 4 | CHANGE OVER SWITCH | TATA 3 5 TON FAT | 2 | nos | [email protected] | 21 | |
| 5 | STAINER FUEL | TATA 3 5 TON FAT | 4 | nos | [email protected] | 21 | |
| 6 | PITIFUL COIL | TATRA 4X4 6X6 | 1 | nos | [email protected] | 21 | |
| 7 | OIL FILTER ASSY IMPROVED | TATA 3 5 TON FAT | 2 | nos | [email protected] | 21 | |
| 8 | OIL SEAL | 5 TON STLN | 1 | nos | [email protected] | 21 | |
| 9 | THERMOSTAT INSERT | TATA 3 5 TON FAT | 3 | nos | [email protected] | 21 | |
| 10 | VOLTMETER VDO | TATRA 4X4 6X6 | 1 | nos | [email protected] | 21 | |
| 11 | HANDLE | 5 TON STLN | 1 | nos | [email protected] | 21 | |
| 12 | FUEL WATER SEPRATOR | TATA 3 5 TON FAT | 4 | nos | [email protected] | 21 | |
| 13 | FILTER ELEMENT PRIMARY | TATA 3 5 TON FAT | 3 | nos | [email protected] | 21 | |
| 14 | SUSPENSION BUSH KIT | MARUTY GYPSY | 1 | nos | [email protected] | 21 |
Discover companies most likely to bid on this tender
BIDDER SUBMISSION documents as per Terms and Conditions
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT mandate certified by bank
Advance sample documentation (pre-opening requirement)
Any certificates/documents sought in Bid document/ATC/Corrigendum
Key insights about ASSAM tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate along with advance sample before technical bid. Ensure compliance with ATC terms, and be prepared for a 25% quantity variation. Provide 14 listed item qualifications and vendor onboarding documents.
Required documents include PAN Card, GSTIN, cancelled cheque, EFT Mandate certified by bank, and any certificates demanded by ATC/Corrigendum. Also attach advance sample and vendor onboarding materials as specified by the Terms.
Delivery terms enable a 25% quantity increase during contract and currency, with a delivery extension formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; exact delivery timelines to be stated in the final order.
Explicit standards are not listed in the supplied data; bidders should anticipate IS/ISO-style compliance and ensure OEM authorizations if demanded by ATC. Verify during bid submission and ATC issuance.
An advance sample must be submitted prior to opening the technical bid; failure to provide the sample leads to rejection of the bid as per Buyer ATC. Ensure sample aligns with the 14 item BOQ scope.
EMD details are not disclosed in the provided data; bidders must refer to the full tender Terms and Conditions for exact EMD amount or percentage and submission method (DD/online) as applicable.
The 14 items encompass air dryer WABCO, 24V bulbs, Banjo bolts, change over switches, fuel system components, oil filters and seals, thermostat inserts, voltmeters, handles, fuel water separators, filter elements, and suspension bush kits, with quantities not specified.
Payment terms are not explicitly stated in the data; bidders should awaiting final ATC for schedule of payments, including any advance, milestone, or after-delivery payment terms.