Bid Publish Date
09-Sep-2026, 12:45 pm
Bid End Date
19-Sep-2026, 2:00 pm
Value
₹4,99,730
Location
Progress
Organization: Uttar Pradesh Power Corporation Limited (UPPCL) - Energy Department Uttar Pradesh. Product: LED Luminaire for Floodlight conforming to IS 10322 (Part 5/Section 5) (V3) under BIS Scheme II (Q2). Location: AGRA, UTTAR PRADESH 282001. Estimated Value: ₹499,730.00. The tender enforces an option clause allowing up to 25% quantity variation at contracted rates, with delivery timing linked to the last delivery order date and minimum 30 days extension. No BOQ items are listed, and EMD amount is not specified here. The tender targets vendors capable of IS 10322 compliance with BIS oversight. This call is aligned to standard government supply of LED floodlight luminaires.
Product: LED Floodlight Luminaire conforming to IS 10322 Part 5/Section 5 (V3)
Standard: IS 10322 family with BIS Scheme II (Q2) compliance
Quantity flexibility: up to 25% increase during/order period
Delivery: based on last delivery order date with minimum 30 days extension
Financials: bidder and OEM turnover criteria with supporting documents
EMD amount not disclosed in tender data
Bidder and OEM turnover evidence required
GST payable by bidder with reimbursement as per actuals or quoted rate
Delivery period governed by original order + option clause
IS 10322 BIS Scheme II (Q2) compliance essential
GST handling by bidder; payment terms aligned with government procurement practices; exact schedule not provided in data
Delivery period starts from the last date of the original delivery order; option to extend with minimum 30 days; quantity may increase by up to 25%
Not specified in provided data
No liquidation, court receivership, or bankruptcy for bidders
Minimum turnover criteria for bidders and OEMs (3-year average)
IS 10322 (Part 5/Section 5) (V3) BIS Scheme II compliance capability
Quantity
55
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
Past Performance
60 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
4
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Agra
Delivery Pincodes
282006
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Kaushlendra Kumar | 282006,ELECTRICTY TRANSMISSION SUB DIVISION-II 400 KV SUB STATION PILIPOKHAR HATHRAS ROAD AGRA | Agra | Uttar Pradesh | 282006 | 55 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST certificate
PAN card
Audited financial statements or CA/Cost Accountant turnover certificate for last 3 years
OEM authorization (if bidding on behalf of OEM)
Technical bid documents demonstrating IS 10322 compliance
Proof of non-liquidation/non-bankruptcy undertaking
Any bid-specific compliance certificates required by BIS Scheme II
Key insights about UTTAR PRADESH tender market
Bidders must meet turnover requirements (last 3 years) with audited statements, provide GST and PAN, submit OEM authorizations if needed, and demonstrate IS 10322 (Part 5/Section 5) BIS Scheme II compliance. The bid requires an undertaking against liquidation status and adherence to option-based quantity increases up to 25%.
Submit GST certificate, PAN card, audited financials or CA certificate for turnover, OEM authorization if applicable, technical compliance documents for IS 10322, and an undertaking of non-liquidation. Include bid-specific compliance certificates for BIS Scheme II as available.
The tender enforces IS 10322 (Part 5/Section 5) (V3) with BIS Scheme II (Q2) compliance. Bidders must prove IS 10322 conformity through certified documentation and related BIS verification certificates to qualify.
Delivery timing is counted from the last date of the original delivery order, with an option to extend the period. Any additional quantity up to 25% must be delivered within calculated time including a minimum 30-day extension.
EMD amount is not specified in the provided data. Bidders should anticipate standard EMD practices and verify exact value and payment method in the final bid documents before submission.
Provide certified audited balance sheets or CA/Cost Accountant certificates showing average turnover for the last 3 years ending 31st March prior year. If the bidder/OEM is under 3 years, use completed years after incorporation for turnover computation.
Bidders must demonstrate quality verification under BIS Scheme II Q2 for LED luminaires, including IS 10322 conformity and related BIS certification/verification documents, ensuring product safety and performance standards before awarding.
If quantity increases by up to 25%, the extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; the contractor may extend up to the original delivery period.