Bid Publish Date
10-Nov-2026, 11:31 am
Bid End Date
01-Dec-2026, 12:00 pm
EMD
₹20,000
Location
Progress
N/a announces a tender for Supplying of 50 KVA DG set, Supplying of XLPE Armoured cable with Aluminium Conductor, Supply installation Testing and commissioning of CRCA panel, Providing and fixing 25 mm X 5 mm G. I. strip, G. I. earth plate 600 mm X 600 mm X 6 mm thick, Providing and laying in position cement concrete, PVC insulated and sheathed XLPEpower cable in NICOBAR, ANDAMAN & NICOBAR. Quantity: 178. Submission Deadline: 01-12-2026 12: 00: 00. Last date to apply is approaching fast!
Quantity
178
Category
Supplying of 50 KVA DG set
Bid Type
Two Packet Bid
Bid Validity
45 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
1
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Supplying of 50 KVA DG set , Supplying of XLPE Armoured cable with Aluminium Conductor , Supply installation Testing and commissioning of CRCA panel , Providing and fixing 25 mm X 5 mm G.I. strip , G.I. earth plate 600 mm X 600 mm X 6 mm thick , Providing and laying in position cement concrete , PVC insulated and sheathed XLPEpower cable
Advisory Bank
State Bank of India
ePBG Percentage
2%
ePBG Duration (Months)
14
Pre-Bid Date
16-11-2026 11:00:00
Pre-Bid Venue
Office of the Divisional Forest Officer, Nicobar Division, Campbell Bay, 744302 Video call link: https://meet.google.com/vmq-pfeo-pav
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Nicobars
Delivery Pincodes
744302
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ravi Kant | 744302,Office of the Divisional Forest Officer, Nicobar Division, Campbell Bay | Nicobars | Andaman And Nicobar Islands | 744302 | 1 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Supplying of 50 KVA DG set
As per specification document
Supplying of XLPE Armoured cable with Aluminium Conductor
As per specification document
Supply installation Testing and commissioning of CRCA panel
As per specification document
Providing and fixing 25 mm X 5 mm G.I. strip
As per specification document
G.I. earth plate 600 mm X 600 mm X 6 mm thick
As per specification document
Providing and laying in position cement concrete
As per specification document
PVC insulated and sheathed XLPEpower cable
As per specification document
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supplying of 50 KVA DG set | As per specification document | 1 | pieces | dfo_nd | 120 | |
| 2 | Supplying of XLPE Armoured cable with Aluminium Conductor | As per specification document | 75 | metre | dfo_nd | 120 | |
| 3 | Supply installation Testing and commissioning of CRCA panel | As per specification document | 1 | pieces | dfo_nd | 120 | |
| 4 | Providing and fixing 25 mm X 5 mm G.I. strip | As per specification document | 20 | metre | dfo_nd | 120 | |
| 5 | G.I. earth plate 600 mm X 600 mm X 6 mm thick | As per specification document | 4 | set | dfo_nd | 120 | |
| 6 | Providing and laying in position cement concrete | As per specification document | 2 | cum | dfo_nd | 120 | |
| 7 | PVC insulated and sheathed XLPEpower cable | As per specification document | 75 | metre | dfo_nd | 120 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer