Bid Publish Date
03-Nov-2026, 5:44 pm
Bid End Date
24-Nov-2026, 6:00 pm
EMD
₹7,70,600
Progress
A tender has been published for Assam Rifles Chain Link Fabric fence at Zochachhuah, Supply and Fixing of 60W LED Solar Street Light at Zochachhuah Crossing Point, Construction of Random Rubble masonry retaining wall at Zochachhuah Crossing Point, Construction of Footpath and Steps at Zochachhuah Crossing Point, Construction of drainage system at Zochachhuah Crossing Point, Construction of Boundary Wall at Namlee Crossing Point, Construction of Internal Road at Namlee Crossing Point, Construction of Retaining Wall at Namlee Crossing Point, Construction of Storm drainage at Namlee Crossing Point, Provision of PCC footpath with chequered tiles at Namlee Crossing Point, Construction of Paver Block at Namlee Crossing Point, Provision of earthwork in excavation at Namlee Crossing Point, Supply and Installation of Sentry Post at Namlee Crossing Point. Quantity: 7860 by. Submission Deadline: 24-11-2026 18: 00: 00. Check eligibility and apply.
Quantity
7860
Category
Construction of Boundary Wall at Namlee Crossing Point
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
192
OEM Avg. Turnover
770
Past Performance
40 %
Warranty Period
1 years
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Chain Link Fabric fence at Zochachhuah , Supply and Fixing of 60W LED Solar Street Light at Zochachhuah Crossing Point , Construction of Random Rubble masonry retaining wall at Zochachhuah Crossing Point , Construction of Footpath and Steps at Zochachhuah Crossing Point , Construction of drainage system at Zochachhuah Crossing Point , Construction of Boundary Wall at Namlee Crossing Point , Construction of Internal Road at Namlee Crossing Point , Construction of Retaining Wall at Namlee Crossing Point , Construction of Storm drainage at Namlee Crossing Point , Provision of PCC footpath with chequered tiles at Namlee Crossing Point , Construction of Paver Block at Namlee Crossing Point , Provision of earthwork in excavation at Namlee Crossing Point , Supply and Installation of Sentry Post at Namlee Crossing Point
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
12
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Aizawl
Delivery Pincodes
796001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Laishram Chitaranjan Singh | 796001,AIZWAL | Aizawl | Mizoram | 796001 | 170 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Chain Link Fabric fence at Zochachhuah
Construction of Chain link febric fence
Supply and Fixing of 60W LED Solar Street Light at Zochachhuah Crossing Point
Supply and fixing of LED solar street Light at Crossing Point
Construction of Random Rubble masonry retaining wall at Zochachhuah Crossing Point
Retaining wall to hold back soil
Construction of Footpath and Steps at Zochachhuah Crossing Point
Footpath and Steps for routes
Construction of drainage system at Zochachhuah Crossing Point
Drainage system to safely remove excess water and wastewater
Construction of Boundary Wall at Namlee Crossing Point
Boundary wall to enhance security
Construction of Internal Road at Namlee Crossing Point
Internal Road to provides access, circulation, and connectivity
Construction of Retaining Wall at Namlee Crossing Point
Retaining wall to hold back soil
Construction of Storm drainage at Namlee Crossing Point
Drainage system to safely remove excess water and wastewater
Provision of PCC footpath with chequered tiles at Namlee Crossing Point
PCC footpath with chequered tiles for entrance ramps
Construction of Paver Block at Namlee Crossing Point
Paver Block for exterior flooring
Provision of earthwork in excavation at Namlee Crossing Point
Earthwork in excavation for levelling
Supply and Installation of Sentry Post at Namlee Crossing Point
Sentry Post for security purpose
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Chain Link Fabric fence at Zochachhuah | Construction of Chain link febric fence | 170 | rm | [email protected] | 180 | |
| 2 | Supply and Fixing of 60W LED Solar Street Light at Zochachhuah Crossing Point | Supply and fixing of LED solar street Light at Crossing Point | 32 | job | [email protected] | 180 | |
| 3 | Construction of Random Rubble masonry retaining wall at Zochachhuah Crossing Point | Retaining wall to hold back soil | 33 | mtr | [email protected] | 180 | |
| 4 | Construction of Footpath and Steps at Zochachhuah Crossing Point | Footpath and Steps for routes | 50 | rm | [email protected] | 180 | |
| 5 | Construction of drainage system at Zochachhuah Crossing Point | Drainage system to safely remove excess water and wastewater | 40 | mtr | [email protected] | 180 | |
| 6 | Construction of Boundary Wall at Namlee Crossing Point | Boundary wall to enhance security | 600 | rm | [email protected] | 180 | |
| 7 | Construction of Internal Road at Namlee Crossing Point | Internal Road to provides access, circulation, and connectivity | 100 | rm | [email protected] | 180 | |
| 8 | Construction of Retaining Wall at Namlee Crossing Point | Retaining wall to hold back soil | 4,530 | cm | [email protected] | 180 | |
| 9 | Construction of Storm drainage at Namlee Crossing Point | Drainage system to safely remove excess water and wastewater | 150 | rm | [email protected] | 180 | |
| 10 | Provision of PCC footpath with chequered tiles at Namlee Crossing Point | PCC footpath with chequered tiles for entrance ramps | 140 | rm | [email protected] | 180 | |
| 11 | Construction of Paver Block at Namlee Crossing Point | Paver Block for exterior flooring | 150 | sqm | [email protected] | 180 | |
| 12 | Provision of earthwork in excavation at Namlee Crossing Point | Earthwork in excavation for levelling | 1,860 | cubic meter | [email protected] | 180 | |
| 13 | Supply and Installation of Sentry Post at Namlee Crossing Point | Sentry Post for security purpose | 5 | job | [email protected] | 180 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer