Progress
The Indian Army, Department Of Military Affairs, invites bids for a category including Fuel Line Assembly, Clamp, Fuel Connector, Primer Bulb, Valve Inlet, Valve Outlet, Water Pump Insert Cover, Housing Water Pump, O Ring, Impeller, and Outer Plate. The procurement scope covers 11 line items with unspecified quantities; estimated value is not disclosed. This tender emphasizes strict quality and compliance: ISO 9001 certification for bidders or OEMs, and mandatory Material Test Certificates to accompany supply. The buyer reserves a right to adjust quantity by up to 25% during and after contract award, with delivery periods recalculated accordingly. This structure supports flexible fulfillment while safeguarding performance. Unique differentiators include lab-verified material testing and a turnover-based eligibility framework that applies to both bidders and OEMs, ensuring financial and technical capability to sustain the contract.
Key Term 1: Quantity may increase or decrease up to 25% during contract
Key Term 2: ISO 9001 certification required for bidder or OEM
Key Term 3: Material Test Certificate mandatory with supply; lab results control acceptance
Not explicitly specified in tender text; standard government procurement terms implied; bidders should verify in bid documents
Delivery period adjusts with option clause; increased quantity requires recalculated delivery time based on (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
Not specified in the provided terms; bidders should review bid document for LDs or penalties
Must provide ISO 9001 certification for bidder or OEM
Must supply Material Test Certificates with the delivery
Must meet turnover criteria over last 3 years as per bid document
Must submit audited balance sheets or CA/Cost Accountant certificate proving turnover
Quantity
22
Category
Fuel Line Assy
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
10 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Fuel Line Assy , Clamp , Fuel Connector , Primer Bulb , Valve Inlet , Valve Outlet , Water Pump Insert Cover , Housing Water Pump , O Ring , Impeller , Outer Plate
Pre-Bid Date
21-10-2026 13:00:00
Pre-Bid Venue
846 FWC Dinjan With Sample
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Tinsukia
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tinsukia | Tinsukia | - | - | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Fuel Line Assy
Fuel Line Assy
Clamp
Clamp
Fuel Connector
Fuel Connector
Primer Bulb
Primer Bulb
Valve Inlet
Valve Inlet
Valve Outlet
Valve Outlet
Water Pump Insert Cover
Water Pump Insert Cover
Housing Water Pump
Housing Water Pump
O Ring
O Ring
Impeller
Impeller
Outer Plate
Outer Plate
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Fuel Line Assy | Fuel Line Assy | 2 | nos | buycon3.army.dinjan | 15 | |
| 2 | Clamp | Clamp | 2 | nos | buycon3.army.dinjan | 15 | |
| 3 | Fuel Connector | Fuel Connector | 2 | nos | buycon3.army.dinjan | 15 | |
| 4 | Primer Bulb | Primer Bulb | 2 | nos | buycon3.army.dinjan | 15 | |
| 5 | Valve Inlet | Valve Inlet | 2 | nos | buycon3.army.dinjan | 15 | |
| 6 | Valve Outlet | Valve Outlet | 2 | nos | buycon3.army.dinjan | 15 | |
| 7 | Water Pump Insert Cover | Water Pump Insert Cover | 2 | nos | buycon3.army.dinjan | 15 | |
| 8 | Housing Water Pump | Housing Water Pump | 2 | nos | buycon3.army.dinjan | 15 | |
| 9 | O Ring | O Ring | 2 | nos | buycon3.army.dinjan | 15 | |
| 10 | Impeller | Impeller | 2 | nos | buycon3.army.dinjan | 15 | |
| 11 | Outer Plate | Outer Plate | 2 | nos | buycon3.army.dinjan | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA/Cost Accountant turnover certificate for last 3 years
ISO 9001 certification document (bidder or OEM)
Material Test Certificate for each item and associated lab reports
OEM authorization letter (if bidding as an OEM via a supplier)
Technical bid documents demonstrating compliance with listed item categories
Any other certificates sought in the bid document, ATC, and corrigenda
Key insights about ASSAM tender market
Bidders must meet ISO 9001 certification, provide Material Test Certificates, and demonstrate turnover over the last three financial years via audited statements or CA certificate. Include OEM authorizations if applicable, and submit all required documents as listed in terms and conditions. Following eligibility, prepare technical bid for 11 item category and comply with the option clause for quantity adjustments.
Submit GST, PAN, audited turnover or CA certificate, ISO 9001 certificate, Material Test Certificates with lab reports, OEM authorization if bidding via a supplier, and complete technical bid. Include any ATC-corrigenda referenced in the tender and ensure all documents align with the 11-item BOQ categories.
Bidders must hold ISO 9001 certification for themselves or the OEM and provide Material Test Certificates for all items. The acceptance criteria rely on the buyer’s lab results, making QC documentation critical for eligibility and successful award.
The procurement scope covers 11 item categories: Fuel Line Assembly, Clamp, Fuel Connector, Primer Bulb, Valve Inlet, Valve Outlet, Water Pump Insert Cover, Housing Water Pump, O Ring, Impeller, Outer Plate. Quantities are not disclosed in the summary; bidders must verify BOQ details in the bid document.
The purchaser may adjust quantity up to ±25% of bid quantity during contract placement and during currency, with delivery time recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Extended periods may apply up to the original delivery period.
OEMs must meet the minimum average annual turnover criterion over the last three years as per the bid document, supported by audited balance sheets or CA/Cost Accountant certificates. If the OEM is less than three years old, turnover is calculated from completed financial years post-incorporation.
Yes. Mandatory certificates include ISO 9001, Material Test Certificate, and turnover proof. Bidders failing to upload required certificates per the bid document, ATC, or corrigenda risk rejection of their offer.
Delivery time adjusts based on the option clause. If quantity increases, the new delivery period uses the formula above with a minimum of 30 days; if decreases, timeline corrections follow the original schedule and any extended period constraints.