Bid Publish Date
23-Oct-2026, 8:38 pm
Bid End Date
02-Nov-2026, 9:00 pm
Location
Progress
Organization: Urban Development Department, Government of Uttar Pradesh, through the E-municipalities program for Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh.Procurement: LED Luminaire for Road and Street Lights conforming to IS 10322 (Part 5/Section 3) (V3) (Q2). Location: Azamgarh, Uttar Pradesh 223221. Quantity/Value: not disclosed; procurement scope is tied to IS standard compliance and approved drawings. Key differentiator: mandatory Detailed Design Drawings approval within 5 days of award with subsequent modification lists issued within 5 days. Unique aspects: option clause enabling up to 25% quantity variation with adjusted timelines. The tender emphasizes non-obsolescence (2-year residual life) and GST considerations managed by bidders.
Product: LED luminaire for road and street lighting conforming to IS 10322 (Part 5/Section 3) (V3) Q2
Standards: IS 10322 (Part 5/Section 3) (V3) Q2
Delivery: chain of delivery tied to design approval timeline; post-approval batching adjustments
Warranty/Support: not explicitly stated; assume standard govt practice pending tender terms
Life: minimum 2 years residual market life to avoid obsolescence
Key Term 1: Option clause permits +/-25% quantity variation at contracted rates
Key Term 2: Detailed Design Drawings approval within 5 days of award
Key Term 3: 3 years govt/PSU supply experience required by bidder or OEM
GST will be reimbursed based on actuals or applicable rates (whichever is lower) up to the quoted GST percentage.
Delivery period linked to approval of Detailed Drawings; no LD for buyer-delayed drawing approvals; extended delivery time calculated with option clause.
Not explicitly defined; implied adherence to delivery schedule with option-based adjustments; verify during bid.
3 years of experience supplying similar LED luminaire products to government bodies
Non-liquidation and no bankruptcy status; undertaking required
OEM or authorized reseller with Govt procurement track record
Quantity
4
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
1
Past Performance
70 %
Warranty Period
1 years
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Q2)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Mau
Delivery Pincodes
276129
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Satyendra Kumar | 276129,Executive Officer, Nagar Panchayat, Chiriyakot, District- Mau, Uttar Pradesh | Mau | Uttar Pradesh | 276129 | 4 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
02-Nov-2026, 3:30 pm
Opening Date
03-Nov-2026, 3:30 pm
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar govt sector supply (minimum 3 years)
Contract copies or purchase orders from govt/PSU (supporting annual quantity in each year)
Financial statements or solvency certificate
EMD documentation (amount and mode as specified by tender terms)
Technical bid documents and compliance certificates for IS 10322 (Part 5/Section 3) (V3) Q2
OEM authorization/brand/manufacturer credentials
End-user certificate (as applicable)
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, 3-year govt supply experience, and OEM authorization. Provide Detailed Design Drawings within 5 days of award and comply with IS 10322 (Part 5/Section 3) (V3) Q2. Understand 25% quantity variation rights and GST reimbursement terms.
Submit GST certificate, PAN card, 3-year govt/PSU supply contracts, financial statements, EMD documents, OEM authorization, IS 10322 (Part 5/Section 3) (V3) Q2 compliance certificates, and end-user certificate where applicable.
Tenders require LED luminaires compliant with IS 10322 (Part 5/Section 3) (V3) Q2. Ensure Detailed Design Drawings are approved within 5 days of award and that products remain non-obsolete for at least 2 years of market life.
Delivery periods begin after final approval of Detailed Design Drawings; if approvals delay, the delivery period is refixed with no LD; extension via option clause applies for quantity changes.
Purchaser may increase/decrease quantity up to 25% of bid quantity at contracted rates; additional time is calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days.
Bidders or OEMs must have supplied similar govt/PSU LED luminaires for at least 3 years; provide relevant contracts showing yearly quantities.
GST reimbursement is per actuals or applicable rates (whichever is lower) up to the quoted GST percentage; exact payment milestones to be clarified in the contract.
Submit an undertaking confirming no liquidation or bankruptcy; provide financial statements or solvency certificate to demonstrate fiscal stability for govt procurement.