Bid Publish Date
19-Oct-2026, 1:35 pm
Bid End Date
29-Oct-2026, 2:00 pm
Value
₹1,00,000
Location
Progress
The Indian Army (Department of Military Affairs) in Agra, Uttar Pradesh invites bids for a 60 Ltr Oven Toaster and Griller (OTG). Estimated value: ₹100,000. Scope includes Supply, Installation, Testing and Commissioning of the OTG at the consignee location. The contract allows a ±25% quantity variation and requires OEM warranty certificates, with a 2-year warranty from final acceptance or after installation completion. A mandatory advance sample within 5 days of award, with a modify-or-approve process, governs bulk production. Unique terms include sample-based approval and post-approval conformity checks.
Product/service: 60 Ltr Oven Toaster Griller (OTG)
Quantity/scale: not specified in data; contract allows ±25% quantity variation
Estimated value: ₹100,000
Delivery/installation: SITC at consignee location in Agra, UP
Warranty/maintenance: 2 years; OEM warranty certificates required
Sample process: advance sample within 5 days; modify/approve within 5 days
Standards/certifications: not explicitly specified in tender data; OEM service network required in INDIA
Delivery quantity may vary up to 25% during and after award
Advance sample approval required within 5 days of contract award
Two-year warranty with OEM certification documentation at delivery
Not specified in provided data; standard govt tender terms would apply
Delivery schedule recalculated if quantity increases; extended time permitted with option clause
Not explicitly detailed; contract may include LD for delays as per standard terms
Proven experience in SITC of kitchen equipment for government/defence sector
Demonstrated nationwide after-sales service capability (service centers in INDIA)
Financial capacity to handle ₹100,000 contract with potential 25% quantity variation
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
5
OEM Avg. Turnover
4
Past Performance
20 %
Warranty Period
2 years
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
60 Ltr Oven Toaster and Griller (OTG)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
AGRA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | AGRA | AGRA | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply installations
Financial statements (recent audited if available)
EMD/Security deposit documentation (if applicable)
Technical bid submission detailing SITC capabilities
OEM authorization letters (if bidding as authorized reseller)
Proof of service centers and after-sales support details
Key insights about UTTAR PRADESH tender market
Bidders should submit SITC-capable bids with clear scope: supply, installation, testing, commissioning of a 60 Ltr OTG. Include OEM authorization, 2-year warranty certificates, and service network details. Prepare GST, PAN, financials, and experience certificates; include advance sample plan within 5 days of award.
Required documents include GST registration, PAN, recent audited financial statements, experience certificates for similar SITC projects, OEM authorization letters, and technical bid detailing installation and training capabilities. Also provide proof of service centers and product specifications to meet contracts.
The contract specifies a 2-year warranty from final acceptance or after installation. OEM warranty certificates must be provided at delivery. A well-established Indian service network is required, with service centers near the consignee locations to ensure timely maintenance.
Quantity may be increased or decreased up to 25% of bid/contract quantity. Delivery period adjusts based on the extended quantity, commencing from the original delivery date. If sample approval delays, the delivery period is reframed without liquidated damages for the delay caused by approval.
Within 5 days of contract award, submit one advance sample. The buyer approves or lists required modifications within 5 days. Bulk supply must match the approved sample; non-conformities may trigger fresh samples or contract termination at Buyer’s discretion.
Bidders must demonstrate end-to-end SITC capabilities: supply, on-site installation, user training, testing, commissioning, and post-sale maintenance. Include installation and troubleshooting teams, along with documented service centers across INDIA to support the consignee locations.
The provided data does not specify an EMD amount. Bidders should monitor the official bid portal for the exact EMD value, acceptable payment method, and submission deadline to ensure compliance with the procurement process.
The tender data does not list explicit standards. Bidders should ensure OEM warranties, service network registrations, and general quality compliance. If available, confirm ISI/AAA/TRTL equivalence or IS 550 compliance through the OEM and attach certification documents during submission.