TenderDekho Logo
GEM

Contract Bidding Open For Sixty two point Five KVA 3 phase Silent DG set with Electricity GRID connection for Genset,Earthing in DIBRUGARH, ASSAM

Bid Publish Date

08-Oct-2025, 2:03 pm

Bid End Date

03-Nov-2025, 2:00 pm

EMD

₹76,000

Value

₹38,00,000

Latest Corrigendum Available

Progress

Issue08-Oct-2025, 2:03 pm
Corrigendum29-Oct-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

129

Category

Automate Chiller room with Refrigeration unit

Bid Type

Two Packet Bid

Categories 48

Directorate Of Dairy Development announces a tender for Sixty two point Five KVA 3 phase Silent DG set with Electricity GRID connection for Genset, Earthing 4 nos, Change over switch, Aluminium armoured cable, Fuel Diesel, Refrigerated Sweet Display Counter, Vici cooler, Garden Table and Chair, Patio Umbrella, Automate Chiller room with Refrigeration unit in DIBRUGARH, ASSAM. Quantity: 129. Submission Deadline: 03-11-2025 14: 00: 00. Last date to apply is approaching fast!

Documents 5

GeM-Bidding-8401394.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Generator set 30 kva 3 Phase Silent Auto Panel Diesel start & Diesel Run

Indian Army

JABALPUR, MADHYA PRADESH

Posted: 21 June 2025
Closed: 12 July 2025
GEM

Silent type 1250 kVA /1000 kW, 3 phase, 415 Volt, 50 HZ Diesel Generator sets as per attached annex

Directorate Of Purchase And Stores

KHAMMAM, TELANGANA

Posted: 3 October 2025
Closed: 28 October 2025
GEM

OLD 125 KVA DG SET ROOM,PARALLEL CONNECTION TRASNFORMER ROOM,500 KVA TRANSFORMER ROOM,11 KV HT HT S

Central Silk Board

MURSHIDABAD, WEST BENGAL

Posted: 7 April 2025
Closed: 28 April 2025
GEM

Supply, installation, testing and commissioning of 250 kVA, 3 Phase, 415V AC, Silent DG Set

Irel (india) Limited

KANYAKUMARI, TAMIL NADU

Posted: 5 August 2025
Closed: 26 August 2025
GEM

SUPPLY INSTALLATION TESTING & COMISSIONING OF 20 KVA 3 phase 415 V silent DG SET comprising of Engi

Nfr Construction

Posted: 2 November 2024
Closed: 23 November 2024
GEM

Bill of Quantities (BOQ) 10 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Sixty two point Five KVA 3 phase Silent DG set with Electricity GRID connection for Genset 3 phase Silent DG set comprising of coupled to suitable make Sixty two point Five KVA Alternator 415 Volts alternator mounted on a common base frame along with other accessories like Manual and Fuel tank and Battery with leads 1 set buycon_dibrugarh 60
2 Earthing 4 nos Copper material 4 nos buycon_dibrugarh 60
3 Change over switch Polycorbonate Material of Color White Item Dimensions 200mm x 100mm x 100mm with 6 months warranty provided by the manufacturer from date of purchase 1 nos buycon_dibrugarh 60
4 Aluminium armoured cable 50Sqmm Three point Five Core 20 rm buycon_dibrugarh 60
5 Fuel Diesel For trail run 70 l buycon_dibrugarh 60
6 Refrigerated Sweet Display Counter Material SS 304 Counter Shape should be Rectangular of Colour White with Number of shelves 3 Power Consumption should be 100 Watts 8 nos buycon_dibrugarh 60
7 Vici cooler For heavy duty use with Easy open glass door and Corrosion resistant body with Adjustable Plastic coated wire mesh shelves and Tropicalized for high ambient temperatures 8 nos buycon_dibrugarh 60
8 Garden Table and Chair 1 Plastic table and 4 Plastic Chairs Designer and Colour may be Blue or Red or Pink or White 8 nos buycon_dibrugarh 60
9 Patio Umbrella Fabric Polyester The shape of the Umbrella Shape should be Round and Waterproof and Colour Blue 8 nos buycon_dibrugarh 60
10 Automate Chiller room with Refrigeration unit Chiller room for dairy products 1 unit buycon_dibrugarh 60

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

29-Oct-2025

Extended Deadline

03-Nov-2025, 2:00 pm

Opening Date

03-Nov-2025, 2:30 pm

#2

Update

16-Oct-2025