GEM

Indian Oil Corporation Limited Repair/Maintenance/Installation Tender Industry Unit 2025 – 25% Quantity/Duration Option

Bid Publish Date

07-Nov-2025, 5:13 pm

Bid End Date

29-Nov-2025, 3:00 pm

Latest Corrigendum Available

Progress

Issue07-Nov-2025, 5:13 pm
Corrigendum24-Nov-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Single Packet Bid

Tender Overview

Indian Oil Corporation Limited invites bids for Repair, Maintenance and Installation of Plant/Systems/Equipment under the Industry Unit category. The tender references ongoing maintenance services with potential quantity or duration adjustments up to 25% at contract issuance, and negotiated optional invoicing adjustments under an excess settlement mechanism. While BOQ items and exact values are not disclosed, the scope emphasizes service delivery, installation support, and ongoing maintenance across IOCL facilities. The key differentiator is the flexible quantity/duration modification and the service-level escalation handling embedded in the award terms. Bidders should align with IOCL’s governance for supplier changes and invoicing processes.

Technical Specifications & Requirements

  • No explicit BOQ items or technical specifications are published. Expect service categories aligned to plant/system maintenance, retrofit, or installation tasks within IOCL facilities.
  • Prospective bidders should prepare for generic maintenance capabilities, field service responsiveness, and installation support across plant systems.
  • The terms highlight an Excess Settlement option in invoicing, allowing additional charges up to a specified percentage of the item-level total value, with mandatory supporting documents to accompany invoiced addons.
  • Emphasis on service delivery performance, warranty/support considerations, and coordination with IOCL engineering and procurement teams.
  • Although exact standards are not listed, bidders should be ready to demonstrate prior plant maintenance experience and capability to scale up to 25% more quantity or duration.

Terms, Conditions & Eligibility

  • Optional Quantity/Duration Adjustment: up to 25% at contract issue; post-issue adjustments allowed within the same cap.
  • Excess Settlement: bidders may declare applicability of add-on charges; invoice total must stay within the specified excess settlement percentage with required supporting documents.
  • No BOQ data available; bidders should be prepared for IOCL’s standard supplier onboarding, compliance, and invoicing processes, including documentation submission and governance checks.

Key Specifications

  • Product/Service: Repair, Maintenance, and Installation of Plant/Systems/Equipment (Industry Unit)

  • Scope: Service delivery and installation support across IOCL facilities (as per tender terms)

  • EMD/Value: Not disclosed in data; prepare to align with IOCL tender submission norms

  • Experience: Demonstrated maintenance/installation capabilities in plant environments

  • Standards/Compliance: Not explicitly specified; bidders should be ready to prove technical capability and warranty commitments

Terms & Conditions

  • Quantity/Duration Adjustment up to 25% at contract issue

  • Excess Settlement: additional charges up to a specified percentage with supporting documents

  • No BOQ items disclosed; bidders must align with IOCL supplier onboarding and invoicing practices

Important Clauses

Payment Terms

Excess settlement option allows add-on charges up to a percent of item-level total; requires mandatory supporting documents during invoice creation

Delivery Schedule

Contractual quantity/duration can be adjusted up to 25% at contract issue; post-award adjustments permitted within same cap

Penalties/Liquidated Damages

Not specified in available data; bidders should assume standard IOCL L1/L2 penalties and compliance terms per procurement guidelines

Bidder Eligibility

  • Demonstrated experience in repair/maintenance/installation of plant systems

  • Financial capability to handle scalable contracts (up to 25% adjustment)

  • Compliance with IOCL supplier onboarding and invoicing procedures

Past Similar Tenders (Historical Results)

5 found

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Pow

Damodar Valley Corporation

Purulia, WEST BENGAL

Posted: 11 August 2025
Closed: 8 September 2025
GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Pow

Nuclear Power Corporation Of India Limited

UTTARA KANNADA, KARNATAKA

Posted: 21 May 2025
Closed: 23 June 2025
GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Pow

Nuclear Power Corporation Of India Limited

THANE, MAHARASHTRA

Posted: 23 April 2025
Closed: 5 May 2025
GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Ele

N/a

HYDERABAD, TELANGANA

Posted: 20 February 2025
Closed: 21 March 2025
GEM

Mahanadi Coalfields Limited Repair & Maintenance Tender Angul Odisha 2025 - IS 550/ISO Standards Compliant Scope of Work

Mahanadi Coalfields Limited

ANGUL, ODISHA

Posted: 11 November 2025
Closed: 21 November 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

24-Nov-2025

Extended Deadline

29-Nov-2025, 3:00 pm

Opening Date

29-Nov-2025, 3:30 pm

#2

Update

17-Nov-2025

Extended Deadline

24-Nov-2025, 3:00 pm

Opening Date

24-Nov-2025, 3:30 pm

Frequently Asked Questions

How to bid for IOCL repair maintenance tender in Industry Unit 2025?

Bidders should prepare experience proofs in plant maintenance, demonstrate scalable capacity for up to 25% quantity/duration changes, and provide standard onboarding docs. Include GST, PAN, financials, and any OEM authorizations as part of submission; ensure capability for excess settlement invoicing with supporting documents.

What documents are required for IOCL service contract submission 2025?

Submit GST registration, PAN, financial statements, experience certificates, technical compliance evidence, EMD as per IOCL norms, and any OEM authorizations. Also include company profile, past maintenance project references, and warranty/AMC capabilities to support installation work.

What is the 25% option in IOCL tender terms for Industry Unit?

The contract allows the buyer to increase or decrease the contract quantity or duration up to 25% at the time of issue and post-award, bidders must accept revised scope without dispute, ensuring capacities align with potential adjustments.

How does excess settlement work in IOCL tender 2025?

Excess settlement enables bidders to add charges up to a specified percentage of the item-level total. Provide mandatory supporting documents during invoice creation; total invoice amount including addons must not exceed the preset excess settlement limit.

What installation and maintenance capabilities are expected for IOCL Industry Unit?

Proven field service readiness for plant systems, with capability to scale service teams for installation and maintenance. Provide installation protocols, safety compliance records, and warranties/AMC commitments aligned to IOCL standards.

When will IOCL publish BOQ items and technical standards for this tender?

BOQ data is not provided in the current information. Bid readiness requires showcasing generic maintenance capabilities, compliance evidence, and readiness to adapt to undisclosed technical specifications upon release by IOCL procurement.

What are the key eligibility criteria for IOCL tender procurement 2025?

Eligibility includes demonstrated relevant maintenance experience, financial strength to absorb contract adjustments, GST/PAN compliance, and readiness to submit OEM authorizations if required by IOCL. Ensure adherence to IOCL onboarding and invoicing guidelines.

What standards or certifications are expected for IOCL service contracts?

No explicit standards are listed; bidders should prepare to demonstrate technical competence, safety compliance, and warranty/AMC frameworks. Provide any applicable certifications and prior project certifications to reinforce reliability for IOCL Industry Unit maintenance work.

Similar Tenders

2 found
Urgent

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit

Bharat Heavy Electricals Limited (bhel)

📍 HARIDWAR, UTTARAKHAND

⏰ Deadline: 2 days left
🛒 Type: Service
View GEM
Urgent

Uttar Pradesh Power Corporation Limited Repair/Maintenance of Plant Systems Equipment Saharanpur 2025 Tender

Uttar Pradesh Power Corporation Limited (uppcl)

📍 SAHARANPUR, UTTAR PRADESH

Est: ₹1.9 L
⏰ Deadline: 1 day left
🛒 Type: Service
View GEM

Explore More Opportunities

Quick Access