Bid Publish Date
03-Oct-2026, 9:53 am
Bid End Date
19-Oct-2026, 10:00 am
Location
Progress
Advanced Weapons And Equipment India Limited invites bids for the supply of CONTROL PCB SET FOR THREE PHASE VOLTAGE STABILISER (including control PCB, drive PCB, wiring) and MAIN CONTROL PCB 7401 for three-phase voltage stabilisers. The work is FOR ORDNANCE FACTORY TIRUCHIRAPALLI with a delivery period of 60 days and a warranty of 12 months. EMD is not applicable; MSME participation is encouraged with 2026-2027 MSME certificate. Documents required include PAN, GSTN, cancelled cheque, and EFT mandate. This procurement references vendor code creation and requires compliance documentation with firm seal and signature. The tender emphasizes acceptance through ink-signed annexures and compliance declarations.
Product: CONTROL PCB SET FOR THREE PHASE VOLTAGE STABILISER (includes control PCB, drive PCB, wiring)
Product: MAIN CONTROL PCB 7401 FOR THREE PHASE VOLTAGE STABILISERS
Delivery: 60 DAYS
Warranty: 12 MONTHS
FOR: ORDNANCE FACTORY TIRUCHIRAPALLI
Delivery period is 60 days from order date and LD penalties may apply for delays
EMD/PSD not applicable; however, LD clause remains enforceable
MSME 2026-2027 certificate encouraged for purchase preference
Not explicitly defined in the tender; subject to contract terms and LD provisions.
Delivery within 60 days from PO date to ORDNANCE FACTORY TIRUCHIRAPALLI.
LD clause applicable for delays; details not specified in the tender text.
Must submit PAN, GSTIN, and EFT Mandate
MSME 2026-2027 certificate preferred for reservation eligibility
Compliance with ink-signed Tender Annexure and Firm Seal
Quantity
10
Category
Article. 1: CONTROL PCB SET FOR THREE PHASE VOLTAGE STABILISER CONSIST OF CONTROL PCB, DRIVE PCB, WIR
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Article. 1: CONTROL PCB SET FOR THREE PHASE VOLTAGE STABILISER CONSIST OF CONTROL PCB, DRIVE PCB, WIR , Article. 2: MAIN CONTROL PCB 7401 FOR THREE PHASE VOLTAGE STABILISERS
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Tiruchirappalli
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tiruchirappalli | Tiruchirappalli | - | - | 6 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
19-Oct-2026, 4:30 am
Opening Date
20-Oct-2026, 4:30 am
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
MSME Certificate (2026-2027) for reservation/verification
Bidder Compliance Statement Document with Firm’s Seal and Signature
Tender Annexure: ink signed with firm seal
Key insights about TAMIL NADU tender market
Bidders must submit PAN, GSTIN, cancelled cheque and EFT mandate, plus MSME 2026-2027 certificate if eligible. Upload the Bidder Compliance Statement with firm seal and ink-signed Tender Annexure. The delivery window is 60 days and the contract includes a 12-month warranty.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, MSME certificate (2026-2027), and ink-signed Tender Annexure with firm seal. Bidder compliance statement must be uploaded with seal and signature to accept the offer.
Technical items include CONTROL PCB SET (control PCB, drive PCB, wiring) and MAIN CONTROL PCB 7401 for three-phase stabilisers. Delivery is to Ordnance Factory Tiruchirappalli, with a 60-day turnaround and 12-month warranty.
The delivery deadline is 60 days from the order date, with penalties via the LD clause for delays. Ensure timely submission of all required documents to avoid acceptance issues.
The tender specifies a warranty/guarantee period of 12 months for the supplied control PCBs and related assemblies from the date of delivery and acceptance.
MSME 2026-2027 certificate is requested for eligibility and potential reservation benefits. Bidders should attach the certificate to strengthen acceptance and ensure compliance with vendor-code onboarding.