TenderDekho Logo
Active GEM

Bank Of Baroda Inverter (V2) Tender Chennai Tamil Nadu 600001 - Inverter Specifications 2026

Bid Publish Date

30-Aug-2026, 10:59 pm

Bid End Date

14-Sep-2026, 3:00 pm

Progress

Issue30-Aug-2026, 10:59 pm
AwardPending

Tender Overview

The procuring organization is the Bank Of Baroda under the Department Of Financial Services, inviting bids for an Inverter (V2) solution in Chennai, Tamil Nadu (600001). The scope includes rating-related inverter items, battery provisioning with each unit, and related accessories, with after-sales service requirements. The tender emphasizes flexibility through an option clause allowing up to a 25% quantity variation at contracted rates. No explicit start/end dates or estimated value are provided in the data. A unique aspect is the emphasis on delivery timing calculations tied to original and extended delivery periods while maintaining a minimum delivery window. The procurement’s differentiator lies in combining inverter hardware, battery backup, and installation/maintenance services within a single bid, leveraging the buyer’s ATC terms for quantity adjustments and delivery extension rules.

Technical Specifications & Requirements

  • Category: Inverter (V2) with Output Rating (KVA) and Input Operating Voltage (wider ranges acceptable if performance is met)
  • Output Voltage: Inverter mode specification required
  • Battery Provision: Provision of battery with each inverter for backup; Minimum Battery Capacity (Ah) marked as 0 if batteries are not provided
  • Accessories: Provision of suitable trolley/rack for batteries
  • Installation & Commissioning: After Sales Service turnaround time guarantees; Preventive Maintenance timeline to be clarified (NA if not provided)
  • Additional notes reference the BOQ having zero items, suggesting the need to align with the ATC terms and bundled service scope

Terms, Conditions & Eligibility

  • Quantity Flexibility: Purchaser may increase or decrease quantity up to 25% of bid/contract quantity; similar adjustment permitted during currency at contracted rates
  • Delivery Period: Calculated method ties to the original and extended delivery periods with minimum 30 days when exercising the option clause; extension logic is specified in the ATC
  • Compliance: Bidders must adhere to the option clause and delivery rules; no explicit EMD or payment terms are stated in the provided data
  • Other ATCs: The document references an uploaded ATC; bidders should review for any additional supplier obligations or warranties
  • This section consolidates the critical terms that influence bid risk, delivery planning, and contractual flexibility for inverter procurement in Chennai

Key Specifications

  • Inverter category with Output Rating (KVA)

  • Input range: defined operating voltage; wider ranges acceptable if performance meets requirements

  • Output voltage specification in inverter mode

  • Battery provision with each inverter for backup

  • Battery capacity per unit: Minimum Ah = 0 if batteries not provided

  • Provision for trolley/rack for batteries

  • After-sales service turnaround time (AS-TAT)

  • Preventive maintenance timeline (if provided)

Terms & Conditions

  • EMD: not specified in data; verify ATC for requirement

  • Delivery: 25% quantity variation allowed; minimum 30 days extension rules

  • Warranty/AMC: not explicitly stated; confirm in ATC

  • BoQ: 0 items; align with ATC and installation scope

  • OEM/Brand: not specified; check required certifications in ATC

  • Payment terms: not defined in data; confirm in final tender documents

Important Clauses

Payment Terms

Payment terms are not specified in the provided data; bidders should refer to the ATC for any staged payments, warranty credits, or security deposits.

Delivery Schedule

Delivery period may extend based on the option clause; extension calculation is (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days.

Penalties/Liquidated Damages

No explicit LD terms shown; bidders must review ATC for penalty provisions and performance guarantees.

Bidder Eligibility

  • Proven experience in supplying or installing inverter systems with backup batteries

  • Financial stability evidenced by recent financial statements

  • Compliance with local GST and PAN registration requirements

Tender Data

Bid Details

Quantity

8

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

Yes

Requirements

Min. Avg. Annual Turnover

288

OEM Avg. Turnover

3

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Inverter (V2) (Q2)

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

20

Delivery Locations

1

Delivery Cities

Chennai

Delivery Pincodes

600008

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Goutham Srinivas M600008,BANK OF BARODA REGIONAL OFFICE 123, R L ROAD EGMORE CHENNAIChennaiTamil Nadu600008820-

Authority Records

MINISTRY OF FINANCEFINANCIAL SERVICES DEPARTMENTBANK OF BARODA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9823303.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bank Of Baroda

Office Name

Chennai Zone

Grievance Contact

[email protected]

Categories 11

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates demonstrating relevance to inverter installations

4

Financial statements or turnover proof for last 2-3 financial years

5

EMD/security deposit details (as per ATC, if applicable)

6

Technical bid documents demonstrating product capability

7

OEM authorizations or channel partner certificates (if applicable)

8

Any existing after-sales service capability documents

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
INVERTER Output Rating of the Inverter (in KVA) 3
INVERTER Input - Operating Voltage of the Inverter (hint: The input range specified is minimum requirement; Wider input ranges shall also be acceptable being considered better provided meeting the performance requirement) 1 phase 180V -260V, 50 Hz AC mains
INVERTER Output Voltage of the Inverter ( in inverter mode) 1 phase 220V +/- 10 V, 50 Hz AC
BATTERY Provision of battery with each inverter for backup Yes
BATTERY Minimum Capacity of Each Battery ( in Ah) (hint: Write '0' in case battery not provided) 150.0
ACCESSORIES/ TROLLEY/ RACK Provision of Suitable Trolley/ Rack for Batteries Yes
INSTALLATION AND COMMISSIONING OF SERVICE After Sales Service (Turn Around Time) Within 48 hours
INSTALLATION AND COMMISSIONING OF SERVICE Preventive Maintenance (Hint: Mention Timeline if provided, NA if not provided) Half Yearly, Quarterly, Bi-Monthly, Monthly Or higher

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to participate in Bank Of Baroda inverter tender in Chennai?

To participate in the Bank Of Baroda inverter tender in Chennai, bidders must submit GST registration, PAN, experience certificates, and financial statements along with technical bid and OEM authorizations if applicable. Ensure compliance with the 25% quantity variation ATC and confirm delivery timelines as per ATC guidance.

What documents are required for inverter tender in Tamil Nadu?

Required documents include GST certificate, PAN card, experience certificates for inverter installations, financial statements for past 2-3 years, EMD details if applicable per ATC, technical bid, and OEM authorizations. Confirm additional ATC attachments and warranty terms during submission.

What are the key technical specs for Bank Of Baroda inverter bid?

Key specs include Output Rating (KVA), Input Operating Voltage (wide range acceptable), Output Voltage in inverter mode, and Battery provision with each unit. If batteries are not supplied, minimum battery capacity is indicated as 0 Ah. Ensure trolley/rack provision and AS-TAT commitment.

When is delivery expected for the Chennai inverter procurement?

Delivery timing is governed by the ATC option clause. The extension calculation uses (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Vendors should prepare production and logistics plans to meet the extended windows.

What are the EMD and payment terms for this tender?

The provided data does not specify EMD or payment terms. Bidders must consult the ATC document for exact EMD requirements and payment terms, including any advance, milestone payments, or security deposit obligations.

What is the significance of the 25% quantity variation clause?

The 25% variation clause allows increasing or decreasing awarded quantities at contracted rates during contract execution. It requires bidders to scale production, procurement, and delivery plans accordingly, with delivery extended per the clause’s calculation rules.

Are batteries mandatory for every inverter in this tender?

Batteries provision is specified as part of the inverter package; however, the minimum Ah is 0 if batteries are not provided. Bidders should confirm whether per-unit battery kits are required and include compatible rack/trolley provisions in the bid.

Which standard or certification is expected for this inverter procurement?

The tender data references standard-based compliance via IS/IS-like criteria; bidders should verify OEM authorizations and any specific BIS/IS/ISO certifications mentioned in the ATC to ensure alignment with Bank Of Baroda procurement requirements.