ROLLER TABLE FRAME ASSLY, PD/R-277320
Rourkela Steel Plant
SUNDERGARH, ODISHA
Bid Publish Date
29-Dec-2025, 5:13 pm
Bid End Date
14-Jan-2026, 5:00 pm
Location
Progress
Quantity
20
Bid Type
Two Packet Bid
The procurement is issued by Rourkela Steel Plant, a division of Steel Authority of India Limited, for door frame assembly under the category PD/R-355203&355204 in Sundargarh, Odisha 769001. The contract scope covers the supply of goods with a firm price through delivery within 6 months from order placement. Bidder obligations include specific branding on castings, and potential QAP submission. The tender includes a 25% quantity flex, and delivery timelines adjust with extended orders, ensuring a predictable supply cadence across the project. Unique clauses emphasize item identification, TBolt length adjustment (300mm), and compliance with GeM invoicing rules. The buying entity requires post-receipt inspection at RSP Stores and pre-dispatch inspection only if ATC triggers are selected. This opportunity targets suppliers capable of rigid packing, on-time delivery, and traceable manufacture. The absence of a BOQ indicates itemized pricing through the GeM portal and fixed component scope.
Product: Door frame assembly
Standards: PD/R-355203 & 355204 drawings referenced; TBolt length 300mm
Dimensions/Materials: Not explicitly specified in data; monogram engraving requirement
Packing: Adequate packing to prevent damage; freight included; supplier bears insurance
Inspection: Post-receipt at RSP Stores; pre-dispatch if ATC triggers
Delivery: 6 months from order; firm price till delivery
Delivery to RSP Stores within six months and 25% quantity uplift option
GST-compliant invoicing via GeM with GST payment screenshot
Monograms engraved/embossed on all castings; TBolt length 300mm
Post-receipt inspection at consignee site; pre-dispatch only if ATC selected
Firm price till delivery; insurance borne by supplier; freight paid by buyer
Delivery to be completed within six months of order placement; quantity may vary up to +25% during contract
Payments as per GeM guidelines; GST invoice and GST portal payment confirmation required
Not explicitly stated; ensure compliance with GeM terms and inspection outcomes; penalties via L.D. not specified
Experience in supplying door frame assemblies or similar castings
Minimum financial capacity evidenced by recent financial statements
GST registration and PAN provided; compliant with GeM invoicing
Rourkela Steel Plant
SUNDERGARH, ODISHA
Rourkela Steel Plant
SUNDERGARH, ODISHA
Rourkela Steel Plant
SUNDERGARH, ODISHA
Rourkela Steel Plant
SUNDERGARH, ODISHA
N/a
BANGALORE, KARNATAKA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar door frame assembly supply
Financial statements showing turnover capacity
EMD/Security deposit document (as per GeM/ATC guidance)
Technical bid documents and compliance certificates
OEM authorization (if applicable)
Quality Assurance Plan (QAP) if required by ATC
Key insights about ODISHA tender market
Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD, and technical compliance documents. Ensure TBolt length is 300mm per drawing PD/R-355204, and monograms are engraved on castings. Provide QAP if required and comply with GeM invoicing rules and post-receipt inspection at RSP Stores.
Submit GST certificate, PAN, experience certificates for similar work, financial statements, EMD document, technical bid documents, OEM authorizations, and a Quality Assurance Plan if requested. Include GeM-compliant GST invoice and proof of insurance for delivery.
Delivery must be completed within six months of order placement, with potential up to +25% quantity variation. Despatch is by supplier’s own means to RSP Stores, freight paid by purchaser, and insurance borne by supplier.
Post-receipt inspection occurs at RSP Stores before acceptance; pre-dispatch inspection applies only if ATC specifies. Inspection agency is MM, with acceptance contingent on passing at-store checks.
The TBolt length must be 300mm, as per the drawing PD/R-355204; this supersedes any 330mm specification and must be reflected in the bidder’s BOM and QA records.
Prices are firm till delivery; invoicing must be GeM-based with a scanned GST invoice and GST payment screenshot uploaded. The quoted price should include GST, and no packing/forwarding charges are applicable.
All castings must carry engraved or embossed monograms for identification, as specified in the commercial terms; ensure traceability across supplied batches and include in QA documentation.
Delivery is FOR RSP Stores in Sundargarh, Odisha; post-delivery inspection is conducted by the designated inspection agency at RSP Stores after receipt.
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS