Bid Publish Date
30-Jul-2026, 6:03 pm
Bid End Date
28-Aug-2026, 8:00 pm
EMD
₹1,20,000
Location
Progress
A tender has been published for Urban Development And Housing Department Supply and Installation of Adaptive Traffic signal Controller with foundation and painting, Supply and Installation of Traffic Light Aspects - Red, Supply and Installation of Traffic Light Aspects - Green, Supply and Installation of Traffic Light Aspects - Amber, Supply and Installation of Countdown Timer, Supply and Installation of Cantilever poles with foundation and painting, Supply and Installation of Junction Box on each pole, Supply and Installation of UPS - Inverter and battery for backup of 4 hours including cabinet and foundation, Supply and Installation of Solar panel including frame, Supply and laying of 1. 5 sqmm 2 core armoured copper cables, Providing road cutting or trenching for laying cables including repairing of the road, Supply and laying of 75 mm HDPE pipe for laying cables, Supply and laying of 0. 75 sqmm 12 core armoured cable, Supply and laying of 2. 5 sqmm 3 core armoured cable for solar panel, Supply and Installation of Chemical Earthing, Testing and Commissioning in SAMASTIPUR, BIHAR. Quantity: 2530 by. Submission Deadline: 28-08-2026 20: 00: 00. Check eligibility and apply.
Quantity
2530
Category
Supply and Installation of Adaptive Traffic signal Controller with foundation and painting
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
30
OEM Avg. Turnover
240
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Supply and Installation of Adaptive Traffic signal Controller with foundation and painting , Supply and Installation of Traffic Light Aspects - Red , Supply and Installation of Traffic Light Aspects - Green , Supply and Installation of Traffic Light Aspects - Amber , Supply and Installation of Countdown Timer , Supply and Installation of Cantilever poles with foundation and painting , Supply and Installation of Junction Box on each pole , Supply and Installation of UPS - Inverter and battery for backup of 4 hours including cabinet and foundation , Supply and Installation of Solar panel including frame , Supply and laying of 1.5 sqmm 2 core armoured copper cables , Providing road cutting or trenching for laying cables including repairing of the road , Supply and laying of 75 mm HDPE pipe for laying cables , Supply and laying of 0.75 sqmm 12 core armoured cable , Supply and laying of 2.5 sqmm 3 core armoured cable for solar panel , Supply and Installation of Chemical Earthing , Testing and Commissioning
Advisory Bank
State Bank of India
ePBG Percentage
2%
ePBG Duration (Months)
38
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Samastipur
Delivery Pincodes
848101
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Raghunath Paswan | 848101,NEAR THANESHWAR MANDIR, NAGAR PARISHD SAMASTIPUR | Samastipur | Bihar | 848101 | 3 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply and Installation of Adaptive Traffic signal Controller with foundation and painting
As per specification document
Supply and Installation of Traffic Light Aspects - Red
As per specification document
Supply and Installation of Traffic Light Aspects - Green
As per specification document
Supply and Installation of Traffic Light Aspects - Amber
As per specification document
Supply and Installation of Countdown Timer
As per specification document
Supply and Installation of Cantilever poles with foundation and painting
As per specification document
Supply and Installation of Junction Box on each pole
As per specification document
Supply and Installation of UPS - Inverter and battery for backup of 4 hours including cabinet and foundation
As per specification document
Supply and Installation of Solar panel including frame
As per specification document
Supply and laying of 1.5 sqmm 2 core armoured copper cables
As per specification document
Providing road cutting or trenching for laying cables including repairing of the road
As per specification document
Supply and laying of 75 mm HDPE pipe for laying cables
As per specification document
Supply and laying of 0.75 sqmm 12 core armoured cable
As per specification document
Supply and laying of 2.5 sqmm 3 core armoured cable for solar panel
As per specification document
Supply and Installation of Chemical Earthing
As per specification document
Testing and Commissioning
As per specification document
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply and Installation of Adaptive Traffic signal Controller with foundation and painting | As per specification document | 3 | nos | [email protected] | 60 | |
| 2 | Supply and Installation of Traffic Light Aspects - Red | As per specification document | 22 | nos | [email protected] | 60 | |
| 3 | Supply and Installation of Traffic Light Aspects - Green | As per specification document | 58 | nos | [email protected] | 60 | |
| 4 | Supply and Installation of Traffic Light Aspects - Amber | As per specification document | 22 | nos | [email protected] | 60 | |
| 5 | Supply and Installation of Countdown Timer | As per specification document | 11 | nos | [email protected] | 60 | |
| 6 | Supply and Installation of Cantilever poles with foundation and painting | As per specification document | 11 | nos | [email protected] | 60 | |
| 7 | Supply and Installation of Junction Box on each pole | As per specification document | 11 | nos | [email protected] | 60 | |
| 8 | Supply and Installation of UPS - Inverter and battery for backup of 4 hours including cabinet and foundation | As per specification document | 3 | set | [email protected] | 60 | |
| 9 | Supply and Installation of Solar panel including frame | As per specification document | 3 | nos | [email protected] | 60 | |
| 10 | Supply and laying of 1.5 sqmm 2 core armoured copper cables | As per specification document | 180 | mtr | [email protected] | 60 | |
| 11 | Providing road cutting or trenching for laying cables including repairing of the road | As per specification document | 400 | mtr | [email protected] | 60 | |
| 12 | Supply and laying of 75 mm HDPE pipe for laying cables | As per specification document | 450 | mtr | [email protected] | 60 | |
| 13 | Supply and laying of 0.75 sqmm 12 core armoured cable | As per specification document | 1,050 | mtr | [email protected] | 60 | |
| 14 | Supply and laying of 2.5 sqmm 3 core armoured cable for solar panel | As per specification document | 300 | mtr | [email protected] | 60 | |
| 15 | Supply and Installation of Chemical Earthing | As per specification document | 3 | nos | [email protected] | 60 | |
| 16 | Testing and Commissioning | As per specification document | 3 | nos | [email protected] | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer