Damodar Valley Corporation seeks calibration and testing services for the Hydrogen Dew Point Measurement Probe (Make: GE) installed in MTPS Unit 5-6 & Unit 7-8. The engagement is processed on an OEM basis via GeM, with an authorized vendor requirement for Sonepar India Pvt. Ltd. as the Panametrics Sensing Technology (India) Pvt. Ltd. partner. The contract duration is 180 days, with price fixed and a 100% payment within 15 working days after satisfactory completion. A 25% option clause allows scope/duration adjustments up to 25%. The assignment emphasizes strict safety, GCC compliance, and penalties for delays. Location details align with DVC site operations in India.
Product/Service: Hydrogen dew point probe calibration and testing
Make/Model: GE Panametrics dew point measurement system
Site scope: MTPS Units 5-6 and Unit 7-8 under Damodar Valley Corporation
Contract duration: 180 days; completion window: 180 days
Payment: 100% after satisfactory completion within 15 working days
Penalties: 0.5% per week delay; max 5% of contract value
Option clause: +/-25% quantity or duration as per contract issuance
Contract value to be treated as firm; GST included per GeM terms
OEM authorization must be provided by Sonepar India for Panametrics
Delivery and completion within 180 days from start date
100% payment within 15 working days after Engineer-in-Charge certifies satisfactory completion, including full taxes/duties.
Contract period fixed at 180 days from commencement; completion also within 180 days; 25% variation allowed subject to mutual consent.
Delay penalty of 0.5% of contract value per week, up to a maximum of 5% for delays attributable to the contractor.
OEM-based participation via GeM with authorized vendor status for Panametrics Sensing Technology (India) Pvt. Ltd.
Submission of OEM authorization certificate along with bid
Compliance with GCC safety clauses and GeM terms
Quantity
1
Similar Category
Operation and Maintenance Power House / Power Plant
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
3 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - Calibration and Testing of Hydrogen Dew Point Measurement Probe Make: GE Installed in MTPS Unit 5-6 and Unit 7-8 DVC
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Bankura
Delivery Pincodes
722183
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| MUDIT CHAUDHARY | 722183,Mejia Thermal Power Station (MTPS), Damodar Valley Corporation (DVC), Mejia, Bankura, 722183 | Bankura | West Bengal | 722183 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
18-Sep-2026, 4:30 am
Opening Date
19-Sep-2026, 4:30 am
Discover companies most likely to bid on this tender
OEM Authorization Certificate confirming authorized vendor status of Sonepar India Pvt. Ltd. for Panametrics Sensing Technology (India) Pvt. Ltd.
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates relevant to calibration/testing of dew point probes
Financial statements (as required by GCC/geM terms)
Technical bid documents demonstrating capability for GE dew point probe calibration
Any other bid submission documents specified under GeM terms and GCC
Key insights about WEST BENGAL tender market
Bidders must submit the OEM authorization certificate for Sonepar India as the Panametrics vendor, provide GSTIN and PAN, and attach experience certificates in dew point calibration. The contract is fixed for 180 days with 0.5% weekly penalty capped at 5%. Ensure 100% payment terms after certification within 15 working days.
Key documents include OEM authorization certificate, GST certificate, PAN card, relevant calibration experience certificates, financial statements, and technical bid documents proving capability for GE Panametrics dew point measurements; submit as per GCC and GeM terms.
Payment is 100% within 15 working days after satisfactory completion certified by the Engineer-in-Charge, with applicable taxes/duties included. Ensure milestone confirmations are documented to avoid disputes and enable timely payment.
Late completion incurs a penalty of 0.5% of the contract value per week, up to a maximum of 5% of the total contract value; the contractor bears responsibility for delays attributable to execution or compliance failures.
The scope covers calibration and testing of the Hydrogen Dew Point Measurement Probe (GE Panametrics) installed in MTPS Units 5-6 and 7-8, with work completed within a 180-day window from commencement; ensure OEM-authorized service delivery.
An option clause allows up to 25% variation in contract quantity or duration at the time of contract issue, with post-issuance adjustments subject to the supplier’s agreement and formal amendments.