TenderDekho Logo
GEM

Open Tender for Chiller Plant 400 Litre,Chiller Plant 150 Litre,Water Dispenser,Desalination Unit,Chiiler Inbuilt 1 in CENTRAL DELHI, DELHI

Bid Publish Date

15-Jul-2025, 5:23 pm

Bid End Date

30-Jul-2025, 6:00 pm

EMD

₹37,000

Progress

Issue15-Jul-2025, 5:23 pm
Technical29-07-2025 09:46:30
Financial
Award19-Aug-2025, 1:56 am
Explore all 4 tabs to view complete tender details

Quantity

26

Category

Chiller Plant 400 Litre

Bid Type

Two Packet Bid

Categories 25

A tender has been published for Personnel Information And Management System Central Public Works Department Chiller Plant 400 Litre, Chiller Plant 150 Litre, Water Dispenser, Desalination Unit, Chiiler Inbuilt 120 Litre in CENTRAL DELHI, DELHI. Quantity: 26 by. Submission Deadline: 30-07-2025 18: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Chiller Plant 400 Litre , Chiller Plant 150 Litre , Water Dispenser , Desalination Unit , Chiiler Inbuilt 120 Litre

Authority Records

PUBLIC WORKS DEPARTMENTCENTRAL PUBLIC WORKS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8087381.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Chiller Plant 400 Litre

SITC of high efficiency water cooling system of 400 Litres stainless steel body (SS 304)

7 pieces Delivery: 15 days
#2

Chiller Plant 150 Litre

SITC of high efficiency water cooling system pedestal type stainless steel body (SS 304)

6 pieces Delivery: 15 days
#3

Water Dispenser

sitc of floor mounted water dispenser suitable for single phase Power Supply

1 pieces Delivery: 15 days
#4

Desalination Unit

SITC of Desalination and purification system 6 stage-wise which are completely assembled/pre-piped/pre-wired with manual operation

3 pieces Delivery: 15 days
#5

Chiiler Inbuilt 120 Litre

SITC of high efficiency water cooling and potable water system of 7-8 stage

9 pieces Delivery: 15 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
G PEAK TECHNOLOGIES   Under PMA
-29-07-2025 09:46:30
2
HI TECH INFOVISION   Under PMA
-30-07-2025 13:29:25
3
P R ENTERPRISES   Under PMA
-30-07-2025 13:54:38

Financial Results

Rank Seller Price Item
L1
G PEAK TECHNOLOGIES   Under PMA
Item Categories : Chiller Plant 400 Litre,Chiller Plant 150 Litre,Water Dispenser,Desalination Unit,Chiiler Inbuilt 1
L2
P R ENTERPRISES   Under PMA
Item Categories : Chiller Plant 400 Litre,Chiller Plant 150 Litre,Water Dispenser,Desalination Unit,Chiiler Inbuilt 1
L3
HI TECH INFOVISION   Under PMA
Item Categories : Chiller Plant 400 Litre,Chiller Plant 150 Litre,Water Dispenser,Desalination Unit,Chiiler Inbuilt 1

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about DELHI tender market

SEO-Optimized FAQs

Q1: How to register on GeM for Delhi government tenders related to chiller plants?
To participate in Delhi government tenders, it’s essential to complete your GeM registration. Visit TenderAI GeM Registration Services for professional support to expedite the process. Ensure your company meets all eligibility requirements, including valid certifications, GST registration, and active bank details. During registration, specify the product categories such as HVAC systems, chillers, or water treatment equipment. Proper registration ensures seamless bid submission and eligibility to access government procurement opportunities. For quick and accurate onboarding, consider expert assistance from TenderAI, which simplifies the documentation process, verifies compliance, and provides strategic recommendations for competitive bidding. This step is vital to establish your official presence on the government’s procurement platform and maximize chances of success.


Q2: What are the eligibility requirements for supplying chillers and water systems to Delhi government projects?
Eligibility for Delhi government tenders includes having at least 3 years’ experience in manufacturing or supplying similar chillers, water dispensers, or desalination units. Bidders need to demonstrate minimum average annual turnover of ₹18 lakh over the last three financial years, supported by audited balance sheets or CA certificates. OEM certificates, BIS certifications (for quality standards), and past performance briefs are mandatory documents. The firm must also be registered on the GeM portal and possess ISO certifications where required. MSMEs and startups are not explicitly exempted from experience or turnover-based eligibility here but are encouraged to showcase strong partnerships and past projects in similar domains to boost competitiveness. TenderAI can assist in preparing these documents and verifying eligibility through targeted insights.


Q3: How do I prepare the bid for Delhi’s chiller plant procurement without knowing the exact contract value?
Since the tender does not specify an explicit contract amount, focus on fulfilling all technical specifications and compliance criteria laid out in the BOQ documents. Submit detailed product specifications, past delivery certificates, and OEM certifications. Price competitively based on current market rates, considering energy efficiency, warranty, and after-sales service. Use the total evaluated value approach during bid submission — submitting a comprehensive quote aligned with quality standards. For guidance, utilize TenderAI’s bid optimization tools to assess market norms and structure your offer for maximum competitiveness. Remember, the evaluation will primarily be based on total value and technical compliance, not fixed contract amounts, emphasizing the importance of competitive yet realistic pricing.


Q4: What documentation is required to prove past performance in Delhi’s chiller procurement tenders?
Proven past performance is critical. Submit copies of orders and delivery certificates from government bodies or reputed private organizations confirming the supply of similar chillers or water treatment units within the last three years. Highlight at least 50% of the bid quantity supplied in one of these years. Include details like contract value, delivery dates, and client contact information. Also, provide performance certificates or client testimonials that demonstrate quality and timely completion. These documents substantiate your capability and increase chances of evaluation favorability. TenderAI offers document review services to ensure all key performance proof points are properly highlighted and formatted for submission.


Q5: How can MSMEs and startups benefit from Delhi’s chiller plant tenders?
While this specific tender does not offer explicit MSME or startup exemptions, small and medium enterprises can benefit through preferential procurement policies. MSMEs registered under government schemes may be eligible for price preference and expedited evaluation, which can be leveraged to strengthen bidding positions. Additionally, MSMEs and startups should focus on showcasing innovative solutions, energy-efficient technology, and reliable after-sales service to stand out. TenderAI provides specialized consulting to help MSMEs prepare competitive bids, build certificates, and navigate procurement procedures effectively, maximizing their chances of securing government contracts.


Q6: What are the delivery and logistics considerations for Delhi’s chiller equipment procurement?
Delivery must be completed within 15 days from the date of contract signing, as specified in the bid documents. Plan logistics accordingly, considering Delhi’s traffic and weather conditions. Coordinate with local courier and installation teams to ensure equipment reaches the designated addresses—mainly the Education Projects Zone at I.P. Estate—on time. Shipping documents, inspection certificates, and delivery receipts should be carefully maintained for audit and inspection purposes. Efficient coordination can prevent delays and facilitate smooth commissioning, especially during critical government project timelines.


Q7: How do I ensure compliance with the technical specifications for chillers in this tender?
Refer thoroughly to the detailed BOQ and technical specification documents. Ensure your product conforms to IS standards, energy efficiency norms, and quality certifications such as BIS and ISO. Prepare compliance certificates, test reports, and OEM certification documents to substantiate adherence. During bid evaluation, the technical team will verify your equipment matches BOQ requirements, including capacity, material, and control features. TenderAI offers technical review services to benchmark your products against tender specifications, ensuring compliance and reducing the risk of disqualification.


Q8: How to improve chances of winning Delhi government tenders for cooling systems?

  • Submit well-documented past projects demonstrating supply to similar government or reputed private agencies.
  • Offer competitive and transparent pricing, emphasizing energy savings and durability features.
  • Ensure all required certifications and compliance certificates are up to date.
  • Use TenderAI to analyze market rates and optimize your bid structure.
  • Develop relationships with local government officials and inspectors for better clarity on project expectations.
  • Participate in pre-bid meetings and clarify technical doubts early.
  • Focus on providing after-sales support and maintenance, which can be a decisive factor.
    Consistent quality, punctual delivery, and proactive engagement will position your firm as a preferred government supplier over time.

Q9: What steps should I take after submitting my bid for the Delhi chiller plant tender?
Post-submission, track your bid status via the GeM portal. Be prepared for technical clarifications or inspections if required. Use data analytics from TenderAI to monitor market trends and competitor activity. Keep communication lines open with the reporting officer for any additional document requests or clarifications. Prepare your team for potential negotiations or presentations. Once the contract is awarded, ensure swift logistics, installation, and testing according to the specified timelines. Build a record of compliance and performance for future tenders.


Q10: How does TenderAI assist small businesses and startups in winning government tenders like this?
TenderAI provides expert bid consulting services, including document preparation, technical review, and market insights tailored for government procurement. It offers tools for competitive bid structuring, real-time market trend analysis, and certification support to meet mandatory standards. For MSMEs and startups, TenderAI can identify suitable opportunities, streamline registration, improve compliance, and provide training sessions on procurement best practices, thereby enhancing their chance of success. Leverage TenderAI’s resources to access exclusive vendor insights, improve your bid quality, and establish long-term government supply relationships.


Seize this opportunity to grow your presence in Delhi’s public sector procurement market. Prepare today, get expert assistance, and unlock new business avenues!