Bid Publish Date
17-Sep-2025, 4:54 pm
Bid End Date
27-Sep-2025, 5:00 pm
Location
Progress
Quantity
7
The issuing authority invites bids for Fabrication of 01 in no wall mirror and securing arrangement in mese area Mat Glass Hard wood, Telep in NORTH AND MIDDLE ANDAMAN, ANDAMAN & NICOBAR. Quantity: 7. Submission Deadline: 27-09-2025 17: 00: 00. Submit your proposal before the deadline.
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Fabrication of 01 in no wall mirror and securing arrangement in mese area Mat Glass Hard wood | Fabrication of 01 in no wall mirror and securing arrangement in mese area Mat Glass Hard wood | 1 | jobs | shubham.sharma | 90 |
| 2 | Telephone unit not working in all DI DR carried out by ship staff suspect Auto Telephone exchange unit defective | Telephone unit not working in all DI DR carried out by ship staff suspect Auto Telephone exchange unit defective | 1 | jobs | shubham.sharma | 90 |
| 3 | CCTV Camera not working on 02 location DI DR carried out by ship staff suspect camera Line cable defective communication between camera and DVR not established | CCTV Camera not working on 02 location DI DR carried out by ship staff suspect camera Line cable defective communication between camera and DVR not established | 1 | jobs | shubham.sharma | 90 |
| 4 | During Defueling through port side catwalk fuelling De fueling point fuel leakage was observed from Stbd catwalk fueling De fueling point Suspect butterfly valve not holding | During Defueling through port side catwalk fuelling De fueling point fuel leakage was observed from Stbd catwalk fueling De fueling point Suspect butterfly valve not holding | 1 | jobs | shubham.sharma | 90 |
| 5 | Both side fueling defueling filling lines metallic caps thread damaged and rusted same caps to be repaired renewed | Both side fueling defueling filling lines metallic caps thread damaged and rusted same caps to be repaired renewed | 1 | jobs | shubham.sharma | 90 |
| 6 | Safety guards for both gearbox shafts in the ER are to be fabricated as a safety measure for protection near the shafts | Safety guards for both gearbox shafts in the ER are to be fabricated as a safety measure for protection near the shafts | 1 | jobs | shubham.sharma | 90 |
| 7 | DD Pump not developing required suction during trials | DD Pump not developing required suction during trials | 1 | jobs | shubham.sharma | 90 |
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | EBRAHIM MULLA SAMSUDDIN Under PMA | - | 22-09-2025 11:44:58 | Qualified |
| 2 | H M S MARINE SERVICES Under PMA | - | 19-09-2025 14:39:55 | Disqualified |
| 3 | R K TRADING & CO Under PMA | - | 25-09-2025 17:14:00 | Qualified |
| 4 | S F MARINE OFFSHORE AND INDUSTRIAL SUPPLY COMPANY Under PMA | - | 25-09-2025 12:25:41 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | S F MARINE OFFSHORE AND INDUSTRIAL SUPPLY COMPANY(MSE,MII)( MSE Social Category:General ) Under PMA | ₹4,20,000 | Item Categories : Fabrication of 01 in no wall mirror and securing arrangement in mese area Mat Glass Hard wood,Telep |
| L2 | EBRAHIM MULLA SAMSUDDIN (MSE,MII)( MSE Social Category:General ) Under PMA | ₹4,53,795 | Item Categories : Fabrication of 01 in no wall mirror and securing arrangement in mese area Mat Glass Hard wood,Telep |
| L3 | R K TRADING & CO (MSE,MII)( MSE Social Category:General ) Under PMA | ₹4,98,750 | Item Categories : Fabrication of 01 in no wall mirror and securing arrangement in mese area Mat Glass Hard wood,Telep |
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS