Centre For Development Of Telematics (CDOT) under the Department Of Telecommunications invites bids for a DC Power supply project in West Delhi (DELHI 110008). The procurement covers Supply, Installation, Testing and Commissioning of DC power equipment. While the BOQ shows zero items, the tender imposes a 25% quantity option during contract award and extended delivery periods. Eligible bidders must demonstrate prior supply to Central/State Govt bodies for at least 3 years and have OEM authorization if bidding via distributors. A minimum three-year average turnover is required, with annual audited financials or CA certificates to confirm capacity. The scope ensures delivery at contract rates, with potential quantity flex as per option clause. Unique features include combination of supply and on-site implementation, and the need for OEM turnover compliance alongside project experience. This opportunity targets vendors with robust government procurement experience and strong financial health, capable of handling DC power infrastructure for telecom deployments.
DC power supply for telecom deployment
Supply, installation, testing and commissioning scope
25% quantity option during contract and currency period
Delivery period adjustments per option clause with minimum 30 days
3 years govt/PSU supply experience required
OEM authorization required for distributors
Mandatory 3-year govt experience with relevant contracts
OEM authorization required for distributors submitting bids
Turnover evidence for last 3 years with audited statements
Not specified in data; bidder should seek clarification during bid submit
Delivery starts from last date of original delivery order; option to increase quantity up to 25% with proportional extension; minimum 30-day extension when extended period is used
Not specified in data; bidders should confirm LD terms during bidding
3+ years of government/PSU supply of similar DC power products
Audited turnover evidence for last 3 years (bidder and OEM)
OEM authorization if bidding through distributors
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
16
Warranty Period
5 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
DC Power supply
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
63
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
South
Delivery Pincodes
110030
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jyotsana Yadav | 110030,C-DOT Campus, Mandi road, Mehrauli, New Delhi. Near Chattarpur Metro Station. | South | Delhi | 110030 | 2 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates showing govt/PSU supply in last 3 years
Audited financial statements or CA certificate for turnover (last 3 years)
OEM authorization or distributor authorization details
Technical bid documentation demonstrating compliance for DC power equipment
Contract copies of similar projects as evidence
Any additional DoT/CDOT bid submission forms
Key insights about DELHI tender market
Bidders should verify DoT/CDOT tender requirements, ensure 3 years govt procurement experience, and provide OEM authorization if using distributors. Submit turnover proofs for last 3 years, and include evidence of similar DC power supply projects. Ensure the bid covers Supply, Installation, Testing and Commissioning with complete cost components.
Required documents include GST and PAN, experience certificates of govt/PSU supply, audited financial statements or CA certificates for turnover, OEM/distributor authorization, technical bid detailing DC power equipment, and copies of relevant contract proofs to support the 3-year experience criterion.
The scope includes Supply, Installation, Testing and Commissioning of DC power equipment. The bid price must cover all cost components, and the option clause allows up to 25% quantity variation with proportional delivery extensions, ensuring completion within contracted rates.
OEMs must demonstrate minimum average annual turnover for the last 3 years, ending 31st March of the previous year, supported by audited balances or CA certificates. If the bidder is an authorized distributor, OEM turnover evidence should accompany the authorization documents.
Delivery can extend when the purchaser increases quantity by up to 25% during contract or currency. The extension timeframe is calculated as (increased quantity / original quantity) × original delivery period, with a minimum extension of 30 days if applicable.
Key criteria include 3-year govt/psu purchase experience, OEM authorization if applicable, minimum turnover over the last 3 years, and ability to provide Supply, Installation, Testing and Commissioning within contracted rates, along with contract proofs for prior similar deployments.
Specific technical standards are not listed in the data; bidders should confirm applicable telecom DC power equipment standards during bid submission and ensure compliance with DoT procurement norms, including OEM authorization and documented audits for turnover.
Delivery terms align with original delivery period and optional 25% quantity changes with proportional extension. Payment terms are not detailed in the provided data; bidders should obtain exact payment milestones and progress payments during the bid clarification phase.