Invitation to Bid - Mobilization and demobilization of manpower tools and tackles welding machine gas cutting set scaff in Wokha, NAGALAND

Bid Publish Date

03-Oct-2026, 5:03 pm

Bid End Date

22-Oct-2026, 7:00 pm

EMD

₹8,84,735

Location

Wokha , NAGALAND

Progress

Issue03-Oct-2026, 5:03 pm
AwardPending

North Eastern Electric Power Corporation Limited has released a public tender for Mobilization and demobilization of manpower tools and tackles welding machine gas cutting set scaffolding materials and other necessary equipment to site, Dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by EIC, Preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication, Underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc, Providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack, Testing inspection and commissioning of newly installed trash rack including rectification of defects if any in Wokha, NAGALAND. Quantity: 1213. Submission Deadline: 22-10-2026 19: 00: 00. Download documents and apply online.

Advertisement

Tender Data

Bid Details

Quantity

1213

Category

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting set scaffolding materials and other necessary equipment to site

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

147

OEM Avg. Turnover

500

Past Performance

70 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting set scaffolding materials and other necessary equipment to site , Dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by EIC , Preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication , Underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc , Providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack , Testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

26

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

270

Delivery Locations

1

Delivery Cities

Doyang Hydro Electric Plant

Delivery Pincodes

797100

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
N.Orenthung Odyuo797100,Doyang Hydro Electric Plant, NagalandDoyang Hydro Electric Plant-7971001270-

Authority Records

MINISTRY OF POWERNORTH EASTERN ELECTRIC POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9976816.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting set scaffolding materials and other necessary equipment to site

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting set scaffolding materials and other necessary equipment to site

1 ls Delivery: 270 days
#2

Dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by EIC

Dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by EIC

100 mt Delivery: 270 days
#3

Preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication

Preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication

100 mt Delivery: 270 days
#4

Underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc

Underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc

1 ls Delivery: 270 days
#5

Providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack

Providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack

1,010 sqm Delivery: 270 days
#6

Testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Testing inspection and commissioning of newly installed trash rack including rectification of defects if any

1 ls Delivery: 270 days

Categories 55

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer