TenderDekho Logo
Closed GEM

Invitation to Bid - Experiment kit for study of series and parallel connected magnetically coupled circuits,Digital Fun in GANJAM, ODISHA

Bid Publish Date

24-Nov-2025, 2:58 pm

Bid End Date

10-Dec-2025, 4:00 pm

EMD

₹75,000

Generate Docs

Progress

Issue24-Nov-2025, 2:58 pm
Corrigendum25-Nov-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

84

Category

Experiment kit for study of series and parallel connected magnetically coupled circuits

Bid Type

Two Packet Bid

Categories 35

Public procurement opportunity for N/a Experiment kit for study of series and parallel connected magnetically coupled circuits, Digital Function generator, Digital Multimeter, Banana patch cords, Simulation based Experiment, Add on Experiment, Voltage Current and Power measurement in RLC series setup, Network Theorem Study Kit, Energy Meter Testing Setup Device, Digital Single Phase AC Variac, Rheostat, LCR Meter, Current Probe, Dual DC Power Supply, Inductor, Wheatstone Bridge Setup, De Sauty s Bridge Setup, Schering Bridge Setup in GANJAM, ODISHA. Quantity: 84 issued by. Submission Deadline: 10-12-2025 16: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Experiment kit for study of series and parallel connected magnetically coupled circuits , Digital Function generator , Digital Multimeter , Banana patch cords , Simulation based Experiment , Add on Experiment , Voltage Current and Power measurement in RLC series setup , Network Theorem Study Kit , Energy Meter Testing Setup Device , Digital Single Phase AC Variac , Rheostat , LCR Meter , Current Probe , Dual DC Power Supply , Inductor , Wheatstone Bridge Setup , De Sauty s Bridge Setup , Schering Bridge Setup

Authority Records

SKILL DEVELOPMENT AND TECHNICAL EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8608987.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 21 Items Sign in for GEM prices

#1

Experiment kit for study of series and parallel connected magnetically coupled circuits

As per specification

1 unit Delivery: 30 days
#2

Digital Function generator

As per specification

4 unit Delivery: 30 days
#3

Digital Multimeter

As per specification

4 unit Delivery: 30 days
#4

Banana patch cords

As per specification

50 unit Delivery: 30 days
#5

Simulation based Experiment

As per specification

1 nos Delivery: 30 days
#6

Add on Experiment

As per specification

1 nos Delivery: 30 days
#7

Add on Experiment

As per specification

1 nos Delivery: 30 days
#8

Voltage Current and Power measurement in RLC series setup

As per specification

1 set Delivery: 30 days
#9

Network Theorem Study Kit

As per specification

1 set Delivery: 30 days
#10

Energy Meter Testing Setup Device

As per specification

1 set Delivery: 30 days
#11

Digital Multimeter

As per specification

4 set Delivery: 30 days
#12

Digital Single Phase AC Variac

As per specification

2 set Delivery: 30 days
#13

Rheostat

As per specification

2 nos Delivery: 30 days
#14

Rheostat

As per specification

2 nos Delivery: 30 days
#15

LCR Meter

As per specification

1 nos Delivery: 30 days
#16

Current Probe

As per specification

1 nos Delivery: 30 days
#17

Dual DC Power Supply

As per specification

2 nos Delivery: 30 days
#18

Inductor

As per specification

2 nos Delivery: 30 days
#19

Wheatstone Bridge Setup

As per specification

1 nos Delivery: 30 days
#21

De Sauty s Bridge Setup

As per specification

1 nos Delivery: 30 days
#22

Schering Bridge Setup

As per specification

1 nos Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

25-Nov-2025

Extended Deadline

10-Dec-2025, 4:00 pm

Opening Date

10-Dec-2025, 4:30 pm