Lab Setup for testing and Evaluation of power source
Office Of Dg (ace)
PUNE, MAHARASHTRA
Progress
Quantity
84
Category
Experiment kit for study of series and parallel connected magnetically coupled circuits
Bid Type
Two Packet Bid
Public procurement opportunity for N/a Experiment kit for study of series and parallel connected magnetically coupled circuits, Digital Function generator, Digital Multimeter, Banana patch cords, Simulation based Experiment, Add on Experiment, Voltage Current and Power measurement in RLC series setup, Network Theorem Study Kit, Energy Meter Testing Setup Device, Digital Single Phase AC Variac, Rheostat, LCR Meter, Current Probe, Dual DC Power Supply, Inductor, Wheatstone Bridge Setup, De Sauty s Bridge Setup, Schering Bridge Setup in GANJAM, ODISHA. Quantity: 84 issued by. Submission Deadline: 10-12-2025 16: 00: 00. View full details and respond.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Office Of Dg (ace)
PUNE, MAHARASHTRA
N/a
BHAGALPUR, BIHAR
National Institute Of Technology (nit)
RAIPUR, CHHATTISGARH
Science And Technology Department
SARAN, BIHAR
Bharat Heavy Electricals Limited (bhel)
GURDASPUR, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Experiment kit for study of series and parallel connected magnetically coupled circuits | As per specification | 1 | unit | [email protected] | 30 |
| 2 | Digital Function generator | As per specification | 4 | unit | [email protected] | 30 |
| 3 | Digital Multimeter | As per specification | 4 | unit | [email protected] | 30 |
| 4 | Banana patch cords | As per specification | 50 | unit | [email protected] | 30 |
| 5 | Simulation based Experiment | As per specification | 1 | nos | [email protected] | 30 |
| 6 | Add on Experiment | As per specification | 1 | nos | [email protected] | 30 |
| 7 | Add on Experiment | As per specification | 1 | nos | [email protected] | 30 |
| 8 | Voltage Current and Power measurement in RLC series setup | As per specification | 1 | set | [email protected] | 30 |
| 9 | Network Theorem Study Kit | As per specification | 1 | set | [email protected] | 30 |
| 10 | Energy Meter Testing Setup Device | As per specification | 1 | set | [email protected] | 30 |
| 11 | Digital Multimeter | As per specification | 4 | set | [email protected] | 30 |
| 12 | Digital Single Phase AC Variac | As per specification | 2 | set | [email protected] | 30 |
| 13 | Rheostat | As per specification | 2 | nos | [email protected] | 30 |
| 14 | Rheostat | As per specification | 2 | nos | [email protected] | 30 |
| 15 | LCR Meter | As per specification | 1 | nos | [email protected] | 30 |
| 16 | Current Probe | As per specification | 1 | nos | [email protected] | 30 |
| 17 | Dual DC Power Supply | As per specification | 2 | nos | [email protected] | 30 |
| 18 | Inductor | As per specification | 2 | nos | [email protected] | 30 |
| 19 | Wheatstone Bridge Setup | As per specification | 1 | nos | [email protected] | 30 |
| 21 | De Sauty s Bridge Setup | As per specification | 1 | nos | [email protected] | 30 |
| 22 | Schering Bridge Setup | As per specification | 1 | nos | [email protected] | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
10-Dec-2025, 4:00 pm
Opening Date
10-Dec-2025, 4:30 pm