TenderDekho Logo
Closed GEM

Contract Bidding Open For Supply of 320 KVA DEA Set,ITC of 320 KVA DEA set,earthing with copper plate,25 X 5 mm copper strip in AMBALA, HARYANA

Bid Publish Date

17-Jul-2026, 4:12 pm

Bid End Date

04-Aug-2026, 11:00 am

EMD

₹87,373

Value

₹43,68,649

Progress

RA
Issue17-Jul-2026, 4:12 pm
Reverse Auction18-Aug-2026, 11:00 am
AwardPending

Bharat Sanchar Nigam Limited Portal(bsnl) invites bids for Supply of 320 KVA DEA Set, ITC of 320 KVA DEA set, earthing with copper plate, 25 X 5 mm copper strip in pipe, 25 X 5 mm copper strip on surface, Laying of cable above 185sqmm, End termination, CC Foundation, MS Angle iron, AMC in AMBALA, HARYANA. Quantity: 159. Submission Deadline: 04-08-2026 11: 00: 00. Submit your proposal before the deadline.

Authority & Contact

Office Name

Office Of Ce Elect Bsnl Elect Zone Ambala

Grievance Contact

[email protected]

Reverse Auction Schedule

Completed

Start

18-Aug-2026, 11:00 am

End

19-Aug-2026, 11:00 am

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

159

Category

Supply of 320 KVA DEA Set

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

14

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply of 320 KVA DEA Set , ITC of 320 KVA DEA set , earthing with copper plate , 25 X 5 mm copper strip in pipe , 25 X 5 mm copper strip on surface , Laying of cable above 185sqmm , End termination , CC Foundation , MS Angle iron , AMC

Advisory Bank

PUNJAB NATIONAL BANK

ePBG Percentage

5%

ePBG Duration (Months)

30

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Ambala

Delivery Pincodes

133001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajesh Kumar Kalra133001,Main TE Building Ambala CanttAmbalaHaryana133001190-

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9623693.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

Supply of 320 KVA DEA Set

Specification as per ATC

1 set Delivery: 90 days
#2

ITC of 320 KVA DEA set

Specification as per ATC

1 job Delivery: 90 days
#3

earthing with copper plate

Specification as per ATC

4 jobs Delivery: 90 days
#4

25 X 5 mm copper strip in pipe

Specification as per ATC

20 meters Delivery: 90 days
#5

25 X 5 mm copper strip on surface

Specification as per ATC

40 meters Delivery: 90 days
#6

Laying of cable above 185sqmm

Specification as per ATC

10 meters Delivery: 90 days
#7

Laying of cable above 185sqmm

Specification as per ATC

20 meters Delivery: 90 days
#8

End termination

Specification as per ATC

4 jobs Delivery: 90 days
#9

CC Foundation

Specification as per ATC

8 cumt Delivery: 90 days
#10

MS Angle iron

Specification as per ATC

15 meters Delivery: 90 days
#11

AMC

Specification as per ATC

36 months Delivery: 90 days

Categories 12

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer