TenderDekho Logo
Active GEM

Procurement Opportunity: Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) in JHANSI, UTTAR PRADESH

Bid Publish Date

22-Aug-2026, 8:20 pm

Bid End Date

03-Sep-2026, 7:00 pm

EMD

₹76,000

Progress

Issue22-Aug-2026, 8:20 pm
AwardPending

Dg Of Defence Estate announces a tender for Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) in JHANSI, UTTAR PRADESH. Quantity: 1. Submission Deadline: 03-09-2026 19: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

19

OEM Avg. Turnover

144

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3)

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

60

Pre-Bid & Qualification

Pre-Bid Date

25-08-2026 12:00:00

Pre-Bid Venue

Office of the Executive Officer, Jhansi Cantonment Board

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

JHANSI

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JHANSIJHANSI--115-

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9795492.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Dg Of Defence Estate

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
INVERTER Rated output power of inverter (in KW) 40
INVERTER Operating Voltage Range of Inverter 50 V to 500 V, 160 V to 850 V, 200 V to 1000 V
INVERTER Service condition Outdoor
INVERTER Ingress protection rating of inverter IP 65 (for outdoor use)
INVERTER Inverter mounting type Wall Mounted
PROTECTION FOR INVERTER Power factor at rated output power >/= 0.9
DISPLAY FEATURES ON INVERTER Type of display LCD
CABLE FOR OUTPUT ISI marked Connecting cables according to Inverter rating for each system From Inverter to Net Meter
Other Add on Items Cabling work at input side for each system With PVC Conduit pipe with necessary clamps and screws
ARRAY STRUCTURE Material of mounting structure for mounting the modules/ panels/arrays Structural Steel, Grade: E300 (as per IS 2062), Structural Steel, Grade: E350 (as per IS 2062)
JUNCTION BOX Material of Junction Box GRP (Glass reinforced plastic), Powder Coated Aluminium
JUNCTION BOX Ingress protection (Degree of Protection) for Junction Box IP65
Wind Load Regional Wind Withstand Capacity of Mounting Structure - Suitable to withstand (in Km/Hour) 180, 150
WARRANTY Minimum guarantee for maintaining of output peak watt capacity > / = 90% at the end of 10 years and >/= 80% at the end of 25 years