Bid Publish Date
08-Aug-2026, 3:49 pm
Bid End Date
24-Aug-2026, 4:00 pm
Value
₹5,00,000
Location
Progress
RAOrganization: Uttar Pradesh Power Corporation Limited (UPPCL) – Energy Department, Aligarh, Uttar Pradesh. Product/Service: Carriage, erection, and installation of PCC/STP poles (8.5, 11, 13 mtr), line materials, insulators, transformers (25 KVA, 63 KVA, 100 KVA), VCBs, and associated activities; includes 11KV TPMO, stay set grouting, ABC/ACSR conductors, plinths, and related distribution works. Estimated Value: ₹500,000. Location: Aligarh, Uttar Pradesh. Scope/Category: Medium-scale electrical infrastructure works supporting 11 KV networks and substations; broad scope across pole carriage, erection, and transformer installation. Unique differentiator: Wide range of pole heights and components combined with complete installation and overhauling elements under a single contract; option clause provides quantity flex for up to 25% during contract.
Start
04-Sep-2026, 7:00 pm
End
05-Sep-2026, 7:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
2277
Category
Carriage of following PCC STP poles 8.5 11 13 Mtr
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
2
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Carriage of following PCC STP poles 8.5 11 13 Mtr , Carriage of line material , Erection of PCC and STP poles 8.5, 11 and 13 Mtr , Erection of Double poles 8.5, 11 and 13 Mtr , Installation and fixing of 11 KV TPMO. , Erection and Grouting of stay set , Providing and fixing of insulator , Laying of ACSR Weasal, Rabbit and Dog Conductor. , Erection of ABC Conductor , Grouting of PCC and STP poles , Making of plinth , Carriage and Installation of 25 KVA Transformer , Carriage and Installation of 63 KVA Transformer , Carriage and Installation of 100 KVA Transformer , 11KV VCB Including complete overhauling repair
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
21
Delivery Locations
1
Delivery Cities
Aligarh
Delivery Pincodes
202001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rohitas Singh Jangpangi | 202001,Superintending Engineer, EDC-II Aligarh, SCADA, Building, Lal Diggi, Aligarh-202001 | Aligarh | Uttar Pradesh | 202001 | 70 | 21 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Carriage of following PCC STP poles 8.5 11 13 Mtr
Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road Including the work of its loading and unloading at the respective ends also including the work of dragging etc. and also including the cost of labour T P carrier etc required for proper completion of work. (Dist. O to 50 Kms.). PCC STP poles 8.5 11 13 Mtr.
Carriage of line material
Carriage of line material viz LT Cable, Conductor Gi earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc, and also including the cost of labour, T P carrier etc. required for proper completion of work. (Dist. 0 10 50 Km)
Erection of PCC and STP poles 8.5, 11 and 13 Mtr
Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Erection of Double poles 8.5, 11 and 13 Mtr
Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Installation and fixing of 11 KV TPMO.
Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Erection and Grouting of stay set
Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work
Providing and fixing of insulator
Providing and fixing of stay insulator
Laying of ACSR Weasal, Rabbit and Dog Conductor.
Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work
Erection of ABC Conductor
ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm
Grouting of PCC and STP poles
Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms
Making of plinth
Making the plinth of Steel poles
Carriage and Installation of 25 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
Carriage and Installation of 63 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
Carriage and Installation of 100 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
11KV VCB Including complete overhauling repair
Complete Repairing of Different make 11KV VCB Including complete overhauling repair replacement of defective and damaged minor spare that are tripping coils tripping plate and nut bolt with complete wiring T P etc. for proper completion of work the repairs circuit breaker will be tested on load. The spare taken out from circuit breaker at the time of repair shall be return to JE concerned who will be liable to hand over such scrape to store Aligarh.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Carriage of following PCC STP poles 8.5 11 13 Mtr | Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road Including the work of its loading and unloading at the respective ends also including the work of dragging etc. and also including the cost of labour T P carrier etc required for proper completion of work. (Dist. O to 50 Kms.). PCC STP poles 8.5 11 13 Mtr. | 70 | nos | edcaligarh2consignee | 21 | |
| 2 | Carriage of line material | Carriage of line material viz LT Cable, Conductor Gi earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc, and also including the cost of labour, T P carrier etc. required for proper completion of work. (Dist. 0 10 50 Km) | 35 | nos | edcaligarh2consignee | 21 | |
| 3 | Erection of PCC and STP poles 8.5, 11 and 13 Mtr | Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 60 | nos | edcaligarh2consignee | 21 | |
| 4 | Erection of Double poles 8.5, 11 and 13 Mtr | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 5 | nos | edcaligarh2consignee | 21 | |
| 5 | Installation and fixing of 11 KV TPMO. | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 5 | nos | edcaligarh2consignee | 21 | |
| 6 | Erection and Grouting of stay set | Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work | 55 | nos | edcaligarh2consignee | 21 | |
| 7 | Providing and fixing of insulator | Providing and fixing of stay insulator | 45 | nos | edcaligarh2consignee | 21 | |
| 8 | Laying of ACSR Weasal, Rabbit and Dog Conductor. | Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work | 1,503 | mtr | edcaligarh2consignee | 21 | |
| 9 | Erection of ABC Conductor | ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm | 465 | mtr | edcaligarh2consignee | 21 | |
| 10 | Grouting of PCC and STP poles | Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms | 8 | nos | edcaligarh2consignee | 21 | |
| 11 | Making of plinth | Making the plinth of Steel poles | 5 | nos | edcaligarh2consignee | 21 | |
| 12 | Carriage and Installation of 25 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 4 | nos | edcaligarh2consignee | 21 | |
| 13 | Carriage and Installation of 63 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 2 | nos | edcaligarh2consignee | 21 | |
| 14 | Carriage and Installation of 100 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 2 | nos | edcaligarh2consignee | 21 | |
| 15 | 11KV VCB Including complete overhauling repair | Complete Repairing of Different make 11KV VCB Including complete overhauling repair replacement of defective and damaged minor spare that are tripping coils tripping plate and nut bolt with complete wiring T P etc. for proper completion of work the repairs circuit breaker will be tested on load. The spare taken out from circuit breaker at the time of repair shall be return to JE concerned who will be liable to hand over such scrape to store Aligarh. | 13 | nos | edcaligarh2consignee | 21 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about UTTAR PRADESH tender market
Bidders should first review the ATC document uploaded with the tender and ensure compliance with the option clause allowing ±25% quantity variation. Prepare technical bids demonstrating experience in carriage, erection, and installation of PCC/STP poles (8.5–13 m) and associated line materials. Include EMD details if specified in ATC and ensure delivery terms align with the extended delivery framework.
Required documents typically include GST registration, PAN, company registration, technical capability certificates, past experience in similar works, financial statements, and EMD or security deposit as per ATC. OEM authorizations and VCB/transformer installation certifications may be needed; refer to the ATC for the exact list before submission.
Key specs include PCC/STP poles at 8.5, 11, and 13 m, 11 KV TPMO installation, insulator fitting, ACSR conductors, and 25/63/100 KVA transformer carriage and installation. The scope also covers stay-set grouting, ABC conductors, and complete VCB overhauls; exact standards are detailed in the ATC.
Delivery terms allow quantity variation up to 25% at contract; the delivery period begins from the last date of the original delivery order. For extended quantities, additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
EMD requirements are explicitly stated in the ATC; the main tender page shows the amount as unspecified here. Bidders must verify the exact EMD amount, payment method (DD/online), and validity period in the ATC document before bid submission.
While explicit standards are not listed in the data, the ATC will specify compliance requirements for 11 KV TPMO, VCBs, insulators, and transformers. Bidders should ensure their technical bids reference IS or equivalent standards if mentioned in the ATC and validate warranties and AMC terms there.
The scope includes carriage and installation of transformers rated at 25 KVA, 63 KVA, and 100 KVA, along with associated line materials, insulators, and conductors (ACSR). It also covers pole erection, stay-set grouting, and ABC conductor installation as part of the distribution network upgrade.
BOQ lists 15 items; current data shows N/A for quantities. Check the tender documents and the ATC for item-wise quantities, unit measurements, and pricing. Ensure your bid aligns with itemization, component specs (poles, TPMO, VCBs), and installation tasks described there.