TenderDekho Logo
Closed GEM

UPPCL Electrical Works Tender Aligarh Uttar Pradesh 2026 – PCC/STP Poles & Transformer Installation 8.5–13 mtr

Bid Publish Date

08-Aug-2026, 3:49 pm

Bid End Date

24-Aug-2026, 4:00 pm

Value

₹5,00,000

Progress

RA
Issue08-Aug-2026, 3:49 pm
Reverse Auction04-Sep-2026, 7:00 pm
AwardPending

Tender Overview

Organization: Uttar Pradesh Power Corporation Limited (UPPCL) – Energy Department, Aligarh, Uttar Pradesh. Product/Service: Carriage, erection, and installation of PCC/STP poles (8.5, 11, 13 mtr), line materials, insulators, transformers (25 KVA, 63 KVA, 100 KVA), VCBs, and associated activities; includes 11KV TPMO, stay set grouting, ABC/ACSR conductors, plinths, and related distribution works. Estimated Value: ₹500,000. Location: Aligarh, Uttar Pradesh. Scope/Category: Medium-scale electrical infrastructure works supporting 11 KV networks and substations; broad scope across pole carriage, erection, and transformer installation. Unique differentiator: Wide range of pole heights and components combined with complete installation and overhauling elements under a single contract; option clause provides quantity flex for up to 25% during contract.

Technical Specifications & Requirements

  • Pole heights: 8.5 m, 11 m, 13 m (PCC/STP poles) and related grouting/installation tasks.
  • Electrical components: 11 KV TPMO, insulators, ACSR rabbit/dog conductors, ABC conductors, VCBs, transformers of ratings 25 KVA, 63 KVA, 100 KVA; includes complete overhauling/repair for 11KV VCB.
  • Delivery/installation scope: Carriage, erection, fixing, laying, and grouting; plinth fabrication; installation of transformers and associated line materials.
  • Standards/quality: Not explicitly specified in tender data; ATC references exist in uploaded ATC document.
  • BOQ: 15 items listed, with N/A quantities in provided data; bidders must rely on detailed ATC and BOQ during tender submission.
  • Contract terms: Option to increase/decrease quantity up to 25%; delivery period adjusts with a minimum of 30 days for extended quantities.

Terms, Conditions & Eligibility

  • EMD: Not specified in available data; bidders should verify in ATC/Terms.
  • Delivery timeline: Extended-delivery logic applies from last date of original delivery order; minimum 30 days for additional time.
  • Payment terms: Not clearly disclosed here; refer to ATC for schedules.
  • Documentation: Required submission as per Terms and Conditions and ATC; OEM authorizations and technical compliance may be necessary.
  • Eligibility: Compliance with option clause; capability to execute multi-component electrical works; baseline requirement appears in ATC document.

Authority & Contact

Reverse Auction Schedule

Completed

Start

04-Sep-2026, 7:00 pm

End

05-Sep-2026, 7:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

2277

Category

Carriage of following PCC STP poles 8.5 11 13 Mtr

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

2

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Carriage of following PCC STP poles 8.5 11 13 Mtr , Carriage of line material , Erection of PCC and STP poles 8.5, 11 and 13 Mtr , Erection of Double poles 8.5, 11 and 13 Mtr , Installation and fixing of 11 KV TPMO. , Erection and Grouting of stay set , Providing and fixing of insulator , Laying of ACSR Weasal, Rabbit and Dog Conductor. , Erection of ABC Conductor , Grouting of PCC and STP poles , Making of plinth , Carriage and Installation of 25 KVA Transformer , Carriage and Installation of 63 KVA Transformer , Carriage and Installation of 100 KVA Transformer , 11KV VCB Including complete overhauling repair

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

12

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

21

Delivery Locations

1

Delivery Cities

Aligarh

Delivery Pincodes

202001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rohitas Singh Jangpangi202001,Superintending Engineer, EDC-II Aligarh, SCADA, Building, Lal Diggi, Aligarh-202001AligarhUttar Pradesh2020017021-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9729645.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

Carriage of following PCC STP poles 8.5 11 13 Mtr

Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road Including the work of its loading and unloading at the respective ends also including the work of dragging etc. and also including the cost of labour T P carrier etc required for proper completion of work. (Dist. O to 50 Kms.). PCC STP poles 8.5 11 13 Mtr.

70 nos Delivery: 21 days
#2

Carriage of line material

Carriage of line material viz LT Cable, Conductor Gi earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc, and also including the cost of labour, T P carrier etc. required for proper completion of work. (Dist. 0 10 50 Km)

35 nos Delivery: 21 days
#3

Erection of PCC and STP poles 8.5, 11 and 13 Mtr

Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work

60 nos Delivery: 21 days
#4

Erection of Double poles 8.5, 11 and 13 Mtr

Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work

5 nos Delivery: 21 days
#5

Installation and fixing of 11 KV TPMO.

Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work

5 nos Delivery: 21 days
#6

Erection and Grouting of stay set

Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work

55 nos Delivery: 21 days
#7

Providing and fixing of insulator

Providing and fixing of stay insulator

45 nos Delivery: 21 days
#8

Laying of ACSR Weasal, Rabbit and Dog Conductor.

Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work

1,503 mtr Delivery: 21 days
#9

Erection of ABC Conductor

ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm

465 mtr Delivery: 21 days
#10

Grouting of PCC and STP poles

Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms

8 nos Delivery: 21 days
#11

Making of plinth

Making the plinth of Steel poles

5 nos Delivery: 21 days
#12

Carriage and Installation of 25 KVA Transformer

Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work

4 nos Delivery: 21 days
#13

Carriage and Installation of 63 KVA Transformer

Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work

2 nos Delivery: 21 days
#14

Carriage and Installation of 100 KVA Transformer

Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work

2 nos Delivery: 21 days
#15

11KV VCB Including complete overhauling repair

Complete Repairing of Different make 11KV VCB Including complete overhauling repair replacement of defective and damaged minor spare that are tripping coils tripping plate and nut bolt with complete wiring T P etc. for proper completion of work the repairs circuit breaker will be tested on load. The spare taken out from circuit breaker at the time of repair shall be return to JE concerned who will be liable to hand over such scrape to store Aligarh.

13 nos Delivery: 21 days

Categories 59

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid on UPPCL electrical works tender in Aligarh 2026 for PCC/STP poles?

Bidders should first review the ATC document uploaded with the tender and ensure compliance with the option clause allowing ±25% quantity variation. Prepare technical bids demonstrating experience in carriage, erection, and installation of PCC/STP poles (8.5–13 m) and associated line materials. Include EMD details if specified in ATC and ensure delivery terms align with the extended delivery framework.

What documents are required for UPPCL Aligarh tender submission 2026?

Required documents typically include GST registration, PAN, company registration, technical capability certificates, past experience in similar works, financial statements, and EMD or security deposit as per ATC. OEM authorizations and VCB/transformer installation certifications may be needed; refer to the ATC for the exact list before submission.

What are the key technical specifications for poles and transformers in this tender?

Key specs include PCC/STP poles at 8.5, 11, and 13 m, 11 KV TPMO installation, insulator fitting, ACSR conductors, and 25/63/100 KVA transformer carriage and installation. The scope also covers stay-set grouting, ABC conductors, and complete VCB overhauls; exact standards are detailed in the ATC.

When is the delivery period for quantity variants under the UPPCL tender?

Delivery terms allow quantity variation up to 25% at contract; the delivery period begins from the last date of the original delivery order. For extended quantities, additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What are the EMD requirements for this UPPCL bidding opportunity in 2026?

EMD requirements are explicitly stated in the ATC; the main tender page shows the amount as unspecified here. Bidders must verify the exact EMD amount, payment method (DD/online), and validity period in the ATC document before bid submission.

What installation and maintenance standards apply to the 11 KV equipment in this bid?

While explicit standards are not listed in the data, the ATC will specify compliance requirements for 11 KV TPMO, VCBs, insulators, and transformers. Bidders should ensure their technical bids reference IS or equivalent standards if mentioned in the ATC and validate warranties and AMC terms there.

What is the scope of transformers and line materials under this UPPCL project?

The scope includes carriage and installation of transformers rated at 25 KVA, 63 KVA, and 100 KVA, along with associated line materials, insulators, and conductors (ACSR). It also covers pole erection, stay-set grouting, and ABC conductor installation as part of the distribution network upgrade.

How to verify the exact BOQ items for this Aligarh tender submission?

BOQ lists 15 items; current data shows N/A for quantities. Check the tender documents and the ATC for item-wise quantities, unit measurements, and pricing. Ensure your bid aligns with itemization, component specs (poles, TPMO, VCBs), and installation tasks described there.