TenderDekho Logo
Active GEM

Open Tender for Plate Clutch,Pressure Plate Assy,Assy Clutch Release Bearing,Relay,Battery Cut Off Switch,S A of Pi in AMBALA, HARYANA

Bid Publish Date

26-Oct-2026, 12:42 pm

Bid End Date

05-Nov-2026, 1:00 pm

Value

₹1,49,000

Progress

Issue26-Oct-2026, 12:42 pm
AwardPending

Indian Army announces a tender for Plate Clutch, Pressure Plate Assy, Assy Clutch Release Bearing, Relay, Battery Cut Off Switch, S A of Pipe 5 8 DC Valve, Combination Switch, Ignition Switch, Cylinder Sleeve, Dual Seal Complete, Timing Belt, Blade Assy Wiper, Rear Door Lock Assy, Air Comp Repair kit, Water Strip Door, Drying and Distributing Unit, Spring Assy Front, Spring Foot Starter Return, Gear Dog, Assy Oil Filter, Assy Fuel Filter, Air Filter Element, Water Separator, Assy Vaccum Hose for EGR, Tank Coolant Vehicular, Assy Wiper Blade, Tapper Roller Bearing, Oil Seal, Rotary PTO Switch, Switch Assy RH, Indicator RR Brake, Shoe Comp Brake Rear, Rubber Step, Assy Coupling Flange, Ignition Coil, Armature Assy, Pinion with Bearing, Brush Set 4, Assy Clutch Master Cylinder, Clutch Plate, Clutch Release Bearing, Assy Fly Wheel, Ball Bearing Fly Wheel, Cover Air Compressor, Switch Assy LH, Hose Pipe 12mm x 1. 5 Mtr, Fuel Flexible Pipe Plastic in AMBALA, HARYANA. Quantity: 57. Submission Deadline: 05-11-2026 13: 00: 00. Last date to apply is approaching fast!

Advertisement

Tender Data

Bid Details

Quantity

57

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Plate Clutch , Pressure Plate Assy , Assy Clutch Release Bearing , Relay , Battery Cut Off Switch , S A of Pipe 5 8 DC Valve , Combination Switch , Ignition Switch , Cylinder Sleeve , Dual Seal Complete , Timing Belt , Blade Assy Wiper , Rear Door Lock Assy , Air Comp Repair kit , Water Strip Door , Drying and Distributing Unit , Spring Assy Front , Spring Foot Starter Return , Gear Dog , Assy Oil Filter , Assy Fuel Filter , Air Filter Element , Water Separator , Assy Vaccum Hose for EGR , Tank Coolant Vehicular , Assy Wiper Blade , Tapper Roller Bearing , Oil Seal , Rotary PTO Switch , Switch Assy RH , Indicator RR Brake , Shoe Comp Brake Rear , Rubber Step , Assy Coupling Flange , Ignition Coil , Armature Assy , Pinion with Bearing , Brush Set 4 , Assy Clutch Master Cylinder , Clutch Plate , Clutch Release Bearing , Assy Fly Wheel , Ball Bearing Fly Wheel , Cover Air Compressor , Switch Assy LH , Hose Pipe 12mm x 1.5 Mtr , Fuel Flexible Pipe Plastic

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Ambala

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-AmbalaAmbala--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10081165.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 50 Items Sign in for GEM prices

#1

Plate Clutch

Plate Clutch

1 nos Delivery: 15 days
#2

Pressure Plate Assy

Pressure Plate Assy

1 nos Delivery: 15 days
#3

Assy Clutch Release Bearing

Assy Clutch Release Bearing

1 nos Delivery: 15 days
#4

Relay

Relay

1 nos Delivery: 15 days
#5

Battery Cut Off Switch

Battery Cut Off Switch

1 nos Delivery: 15 days
#6

S A of Pipe 5 8 DC Valve

S A of Pipe 5 8 DC Valve

1 nos Delivery: 15 days
#7

Combination Switch

Combination Switch

1 nos Delivery: 15 days
#8

Ignition Switch

Ignition Switch

1 nos Delivery: 15 days
#9

Cylinder Sleeve

Cylinder Sleeve

1 nos Delivery: 15 days
#10

Dual Seal Complete

Dual Seal Complete

1 nos Delivery: 15 days
#11

Timing Belt

Timing Belt

1 nos Delivery: 15 days
#12

Blade Assy Wiper

Blade Assy Wiper

2 nos Delivery: 15 days
#13

Rear Door Lock Assy

Rear Door Lock Assy

1 nos Delivery: 15 days
#14

Air Comp Repair kit

Air Comp Repair kit

1 nos Delivery: 15 days
#15

Water Strip Door

Water Strip Door

2 nos Delivery: 15 days
#16

Drying and Distributing Unit

Drying and Distributing Unit

1 nos Delivery: 15 days
#17

Spring Assy Front

Spring Assy Front

2 nos Delivery: 15 days
#18

Spring Foot Starter Return

Spring Foot Starter Return

1 nos Delivery: 15 days
#19

Gear Dog

Gear Dog

1 nos Delivery: 15 days
#20

Assy Oil Filter

Assy Oil Filter

1 nos Delivery: 15 days
#21

Assy Fuel Filter

Assy Fuel Filter

1 nos Delivery: 15 days
#22

Air Filter Element

Air Filter Element

1 nos Delivery: 15 days
#23

Water Separator

Water Separator

1 nos Delivery: 15 days
#24

Assy Vaccum Hose for EGR

Assy Vaccum Hose for EGR

1 nos Delivery: 15 days
#25

Tank Coolant Vehicular

Tank Coolant Vehicular

1 nos Delivery: 15 days
#26

Assy Wiper Blade

Assy Wiper Blade

2 nos Delivery: 15 days
#27

Relay

Relay

1 nos Delivery: 15 days
#28

Battery Cut Off Switch

Battery Cut Off Switch

1 nos Delivery: 15 days
#29

Tapper Roller Bearing

Tapper Roller Bearing

1 nos Delivery: 15 days
#30

Oil Seal

Oil Seal

1 nos Delivery: 15 days
#31

Rotary PTO Switch

Rotary PTO Switch

1 nos Delivery: 15 days
#32

Switch Assy RH

Switch Assy RH

1 nos Delivery: 15 days
#33

Indicator RR Brake

Indicator RR Brake

2 nos Delivery: 15 days
#34

Shoe Comp Brake Rear

Shoe Comp Brake Rear

1 set Delivery: 15 days
#35

Rubber Step

Rubber Step

2 nos Delivery: 15 days
#36

Assy Coupling Flange

Assy Coupling Flange

2 nos Delivery: 15 days
#37

Ignition Coil

Ignition Coil

1 nos Delivery: 15 days
#38

Armature Assy

Armature Assy

1 nos Delivery: 15 days
#39

Pinion with Bearing

Pinion with Bearing

1 nos Delivery: 15 days
#40

Brush Set 4

Brush Set 4

1 nos Delivery: 15 days
#41

Assy Clutch Master Cylinder

Assy Clutch Master Cylinder

1 nos Delivery: 15 days
#42

Pressure Plate Assy

Pressure Plate Assy

1 nos Delivery: 15 days
#43

Clutch Plate

Clutch Plate

1 nos Delivery: 15 days
#44

Clutch Release Bearing

Clutch Release Bearing

1 nos Delivery: 15 days
#45

Assy Fly Wheel

Assy Fly Wheel

1 nos Delivery: 15 days
#46

Ball Bearing Fly Wheel

Ball Bearing Fly Wheel

1 nos Delivery: 15 days
#47

Cover Air Compressor

Cover Air Compressor

1 nos Delivery: 15 days
#48

Switch Assy LH

Switch Assy LH

1 nos Delivery: 15 days
#49

Hose Pipe 12mm x 1.5 Mtr

Hose Pipe 12mm x 1.5 Mtr

1 nos Delivery: 15 days
#50

Fuel Flexible Pipe Plastic

Fuel Flexible Pipe Plastic

1 nos Delivery: 15 days

Categories 53

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data
Advertisement