Progress
Quantity
105
Category
One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard.
Bid Type
Two Packet Bid
Goa Shipyard Limited announces a tender for One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard. , Tools Multimeter, Tools Set of spanners, Tools Allen Key, Tools Cutting Plier, Tools Screw Driver, Binding drawings manuals and documents for installation test and trail, As made drawings manuals and documents for handing over the commissioning, On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE, Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate, Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE, SERVICE ENGINEER CHARGES, TRAINING in SOUTH GOA, GOA. Quantity: 105. Submission Deadline: 13-12-2024 15: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard. , Tools Multimeter , Tools Set of spanners , Tools Allen Key , Tools Cutting Plier , Tools Screw Driver , Binding drawings manuals and documents for installation test and trail , As made drawings manuals and documents for handing over the commissioning , On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE , Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate , Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE , SERVICE ENGINEER CHARGES , TRAINING
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard.
INCINERATOR
Tools Multimeter
INCINERATOR
Tools Set of spanners
INCINERATOR
Tools Allen Key
INCINERATOR
Tools Cutting Plier
INCINERATOR
Tools Screw Driver
INCINERATOR
Binding drawings manuals and documents for installation test and trail
INCINERATOR
As made drawings manuals and documents for handing over the commissioning
INCINERATOR
On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate
INCINERATOR
Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
SERVICE ENGINEER CHARGES
INCINERATOR
TRAINING
INCINERATOR
One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard.
INCINERATOR
Tools Multimeter
INCINERATOR
Tools Set of spanners
INCINERATOR
Tools Allen Key
INCINERATOR
Tools Cutting Plier
INCINERATOR
Tools Screw Driver
INCINERATOR
Binding drawings manuals and documents for installation test and trail
INCINERATOR
As made drawings manuals and documents for handing over the commissioning
INCINERATOR
On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate
INCINERATOR
Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
SERVICE ENGINEER CHARGES
INCINERATOR
TRAINING
INCINERATOR
One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard.
INCINERATOR
Tools Multimeter
INCINERATOR
Tools Set of spanners
INCINERATOR
Tools Allen Key
INCINERATOR
Tools Cutting Plier
INCINERATOR
Tools Screw Driver
INCINERATOR
Binding drawings manuals and documents for installation test and trail
INCINERATOR
As made drawings manuals and documents for handing over the commissioning
INCINERATOR
On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate
INCINERATOR
Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
SERVICE ENGINEER CHARGES
INCINERATOR
TRAINING
INCINERATOR
One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard.
INCINERATOR
Tools Multimeter
INCINERATOR
Tools Set of spanners
INCINERATOR
Tools Allen Key
INCINERATOR
Tools Cutting Plier
INCINERATOR
Tools Screw Driver
INCINERATOR
Binding drawings manuals and documents for installation test and trail
INCINERATOR
As made drawings manuals and documents for handing over the commissioning
INCINERATOR
On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate
INCINERATOR
Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
SERVICE ENGINEER CHARGES
INCINERATOR
TRAINING
INCINERATOR
One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard.
INCINERATOR
Tools Multimeter
INCINERATOR
Tools Set of spanners
INCINERATOR
Tools Allen Key
INCINERATOR
Tools Cutting Plier
INCINERATOR
Tools Screw Driver
INCINERATOR
Binding drawings manuals and documents for installation test and trail
INCINERATOR
As made drawings manuals and documents for handing over the commissioning
INCINERATOR
On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate
INCINERATOR
Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
SERVICE ENGINEER CHARGES
INCINERATOR
TRAINING
INCINERATOR
One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard.
INCINERATOR
Tools Multimeter
INCINERATOR
Tools Set of spanners
INCINERATOR
Tools Allen Key
INCINERATOR
Tools Cutting Plier
INCINERATOR
Tools Screw Driver
INCINERATOR
Binding drawings manuals and documents for installation test and trail
INCINERATOR
As made drawings manuals and documents for handing over the commissioning
INCINERATOR
On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate
INCINERATOR
Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
SERVICE ENGINEER CHARGES
INCINERATOR
TRAINING
INCINERATOR
One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard.
INCINERATOR
Tools Multimeter
INCINERATOR
Tools Set of spanners
INCINERATOR
Tools Allen Key
INCINERATOR
Tools Cutting Plier
INCINERATOR
Tools Screw Driver
INCINERATOR
Binding drawings manuals and documents for installation test and trail
INCINERATOR
As made drawings manuals and documents for handing over the commissioning
INCINERATOR
On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate
INCINERATOR
Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE
INCINERATOR
SERVICE ENGINEER CHARGES
INCINERATOR
TRAINING
INCINERATOR
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard. | INCINERATOR | 1 | set | con4.gsl | 90 | |
| 2 | Tools Multimeter | INCINERATOR | 1 | nos | con4.gsl | 90 | |
| 3 | Tools Set of spanners | INCINERATOR | 1 | nos | con4.gsl | 90 | |
| 4 | Tools Allen Key | INCINERATOR | 1 | nos | con4.gsl | 90 | |
| 5 | Tools Cutting Plier | INCINERATOR | 1 | nos | con4.gsl | 90 | |
| 6 | Tools Screw Driver | INCINERATOR | 1 | nos | con4.gsl | 90 | |
| 7 | Binding drawings manuals and documents for installation test and trail | INCINERATOR | 2 | set | con4.gsl | 90 | |
| 8 | As made drawings manuals and documents for handing over the commissioning | INCINERATOR | 2 | set | con4.gsl | 90 | |
| 9 | On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 90 | |
| 10 | Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate | INCINERATOR | 1 | set | con4.gsl | 90 | |
| 11 | Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 90 | |
| 12 | SERVICE ENGINEER CHARGES | INCINERATOR | 1 | lum | con4.gsl | 90 | |
| 13 | TRAINING | INCINERATOR | 1 | lum | con4.gsl | 90 | |
| 14 | One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard. | INCINERATOR | 1 | set | con4.gsl | 180 | |
| 15 | Tools Multimeter | INCINERATOR | 1 | nos | con4.gsl | 180 | |
| 16 | Tools Set of spanners | INCINERATOR | 1 | nos | con4.gsl | 180 | |
| 17 | Tools Allen Key | INCINERATOR | 1 | nos | con4.gsl | 180 | |
| 18 | Tools Cutting Plier | INCINERATOR | 1 | nos | con4.gsl | 180 | |
| 19 | Tools Screw Driver | INCINERATOR | 1 | nos | con4.gsl | 180 | |
| 20 | Binding drawings manuals and documents for installation test and trail | INCINERATOR | 2 | set | con4.gsl | 180 | |
| 21 | As made drawings manuals and documents for handing over the commissioning | INCINERATOR | 2 | set | con4.gsl | 180 | |
| 22 | On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 180 | |
| 23 | Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate | INCINERATOR | 1 | set | con4.gsl | 180 | |
| 24 | Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 180 | |
| 25 | SERVICE ENGINEER CHARGES | INCINERATOR | 1 | lum | con4.gsl | 180 | |
| 26 | TRAINING | INCINERATOR | 1 | lum | con4.gsl | 180 | |
| 27 | One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard. | INCINERATOR | 1 | set | con4.gsl | 270 | |
| 28 | Tools Multimeter | INCINERATOR | 1 | nos | con4.gsl | 270 | |
| 29 | Tools Set of spanners | INCINERATOR | 1 | nos | con4.gsl | 270 | |
| 30 | Tools Allen Key | INCINERATOR | 1 | nos | con4.gsl | 270 | |
| 31 | Tools Cutting Plier | INCINERATOR | 1 | nos | con4.gsl | 270 | |
| 32 | Tools Screw Driver | INCINERATOR | 1 | nos | con4.gsl | 270 | |
| 33 | Binding drawings manuals and documents for installation test and trail | INCINERATOR | 2 | set | con4.gsl | 270 | |
| 34 | As made drawings manuals and documents for handing over the commissioning | INCINERATOR | 2 | set | con4.gsl | 270 | |
| 35 | On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 270 | |
| 36 | Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate | INCINERATOR | 1 | set | con4.gsl | 270 | |
| 37 | Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 270 | |
| 38 | SERVICE ENGINEER CHARGES | INCINERATOR | 1 | lum | con4.gsl | 270 | |
| 39 | TRAINING | INCINERATOR | 1 | lum | con4.gsl | 270 | |
| 40 | One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard. | INCINERATOR | 1 | set | con4.gsl | 360 | |
| 41 | Tools Multimeter | INCINERATOR | 1 | nos | con4.gsl | 360 | |
| 42 | Tools Set of spanners | INCINERATOR | 1 | nos | con4.gsl | 360 | |
| 43 | Tools Allen Key | INCINERATOR | 1 | nos | con4.gsl | 360 | |
| 44 | Tools Cutting Plier | INCINERATOR | 1 | nos | con4.gsl | 360 | |
| 45 | Tools Screw Driver | INCINERATOR | 1 | nos | con4.gsl | 360 | |
| 46 | Binding drawings manuals and documents for installation test and trail | INCINERATOR | 2 | set | con4.gsl | 360 | |
| 47 | As made drawings manuals and documents for handing over the commissioning | INCINERATOR | 2 | set | con4.gsl | 360 | |
| 48 | On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 360 | |
| 49 | Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate | INCINERATOR | 1 | set | con4.gsl | 360 | |
| 50 | Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 360 | |
| 51 | SERVICE ENGINEER CHARGES | INCINERATOR | 1 | lum | con4.gsl | 360 | |
| 52 | TRAINING | INCINERATOR | 1 | lum | con4.gsl | 360 | |
| 53 | One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard. | INCINERATOR | 1 | set | con4.gsl | 450 | |
| 54 | Tools Multimeter | INCINERATOR | 1 | nos | con4.gsl | 450 | |
| 55 | Tools Set of spanners | INCINERATOR | 1 | nos | con4.gsl | 450 | |
| 56 | Tools Allen Key | INCINERATOR | 1 | nos | con4.gsl | 450 | |
| 57 | Tools Cutting Plier | INCINERATOR | 1 | nos | con4.gsl | 450 | |
| 58 | Tools Screw Driver | INCINERATOR | 1 | nos | con4.gsl | 450 | |
| 59 | Binding drawings manuals and documents for installation test and trail | INCINERATOR | 2 | set | con4.gsl | 450 | |
| 60 | As made drawings manuals and documents for handing over the commissioning | INCINERATOR | 2 | set | con4.gsl | 450 | |
| 61 | On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 450 | |
| 62 | Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate | INCINERATOR | 1 | set | con4.gsl | 450 | |
| 63 | Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 450 | |
| 64 | SERVICE ENGINEER CHARGES | INCINERATOR | 1 | lum | con4.gsl | 450 | |
| 65 | TRAINING | INCINERATOR | 1 | lum | con4.gsl | 450 | |
| 66 | One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard. | INCINERATOR | 1 | set | con4.gsl | 540 | |
| 67 | Tools Multimeter | INCINERATOR | 1 | nos | con4.gsl | 540 | |
| 68 | Tools Set of spanners | INCINERATOR | 1 | nos | con4.gsl | 540 | |
| 69 | Tools Allen Key | INCINERATOR | 1 | nos | con4.gsl | 540 | |
| 70 | Tools Cutting Plier | INCINERATOR | 1 | nos | con4.gsl | 540 | |
| 71 | Tools Screw Driver | INCINERATOR | 1 | nos | con4.gsl | 540 | |
| 72 | Binding drawings manuals and documents for installation test and trail | INCINERATOR | 2 | set | con4.gsl | 540 | |
| 73 | As made drawings manuals and documents for handing over the commissioning | INCINERATOR | 2 | set | con4.gsl | 540 | |
| 74 | On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 540 | |
| 75 | Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate | INCINERATOR | 1 | set | con4.gsl | 540 | |
| 76 | Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 540 | |
| 77 | SERVICE ENGINEER CHARGES | INCINERATOR | 1 | lum | con4.gsl | 540 | |
| 78 | TRAINING | INCINERATOR | 1 | lum | con4.gsl | 540 | |
| 79 | One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all accessories alarms or Instrumentations required for fitment and successful operation onboard. | INCINERATOR | 1 | set | con4.gsl | 630 | |
| 80 | Tools Multimeter | INCINERATOR | 1 | nos | con4.gsl | 630 | |
| 81 | Tools Set of spanners | INCINERATOR | 1 | nos | con4.gsl | 630 | |
| 82 | Tools Allen Key | INCINERATOR | 1 | nos | con4.gsl | 630 | |
| 83 | Tools Cutting Plier | INCINERATOR | 1 | nos | con4.gsl | 630 | |
| 84 | Tools Screw Driver | INCINERATOR | 1 | nos | con4.gsl | 630 | |
| 85 | Binding drawings manuals and documents for installation test and trail | INCINERATOR | 2 | set | con4.gsl | 630 | |
| 86 | As made drawings manuals and documents for handing over the commissioning | INCINERATOR | 2 | set | con4.gsl | 630 | |
| 87 | On board spares required for 2 years of maintenance PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 630 | |
| 88 | Inspection and test certificate FAT report duly signed by inspecting authority and report of weighed weight Material test and guarantee certificate | INCINERATOR | 1 | set | con4.gsl | 630 | |
| 89 | Installation and commissioning spares PRICE BREAK UP TO BE PROVIDED IN PDF FILE | INCINERATOR | 1 | set | con4.gsl | 630 | |
| 90 | SERVICE ENGINEER CHARGES | INCINERATOR | 1 | lum | con4.gsl | 630 | |
| 91 | TRAINING | INCINERATOR | 1 | lum | con4.gsl | 630 |
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
18-Jan-2025, 3:00 pm
Opening Date
18-Jan-2025, 3:30 pm
Extended Deadline
11-Jan-2025, 3:00 pm
Opening Date
11-Jan-2025, 3:30 pm
Extended Deadline
04-Jan-2025, 3:00 pm
Opening Date
04-Jan-2025, 3:30 pm
Extended Deadline
19-Dec-2024, 3:00 pm
Opening Date
19-Dec-2024, 3:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | HAAT INCINERATORS INDIA PRIVATE LIMITED Under PMA | - | 18-12-2024 10:58:33 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | HAAT INCINERATORS INDIA PRIVATE LIMITED(MII) Under PMA | Item Categories : One complete unit of shipboard incinerator Approx. 180 000 to 200 00 Kcal per hr capacity with all |
Key insights about GOA tender market
The eligibility requirements include being a registered entity and demonstrating prior experience in supplying and installing industrial-grade incinerators. Additionally, bidders will need to meet minimum turnover criteria as defined and must submit relevant certification documents as specified in the Additional Terms and Conditions (ATC).
Bidders are required to submit several certifications, including experience documentation, turnover statements, and specific certificates requested in the ATC. If seeking exemptions from experience or turnover criteria, appropriate supporting documents are necessary to establish eligibility.
The registration process for participating in this tender can be initiated through the GEM portal, where bidders must create an account. Following that, they will need to adhere to the steps outlined in the portal for document upload and submission.
Accepted document formats for submission typically include PDF for detailed submissions, along with other formats defined in the ATC. It's crucial that any submission aligns with provided guidelines to avoid disqualification.
The technical specifications for the shipboard incinerator include required capacity (180,000 to 200,000 Kcal per hour), necessary alarms and instrumentation for operation, installation manuals, on-board spare parts for two years, and compliance with the outlined performance standards.
Yes, all bidders must comply with defined quality standards that ensure performance and reliability of the equipment being supplied. Details of these standards are usually specified in the tender documentation.
Bidders must ensure compliance with the technical specifications, financial requirements, and submission guidelines as outlined in the tender documents. Any non-compliance may lead to disqualification.
Testing criteria will generally include verification of quality, performance assessments, and adherence to the warranties and guarantees provided in the submitted documents. FAT reports also play a critical role in this evaluation.
The EMD required for this tender is ₹250,000, which must be submitted along with the bid to ensure commitment and serious intent to fulfill the contract terms.
Performance security requirements will be detailed post-award, aiming to ensure adherence to the delivery timelines and operational standards specified within the contract.
Payment terms will be outlined in the contract, but generally, payments will be milestone-based, contingent on successful delivery and installation of the incinerator as per agreed specifications.
Price evaluation will be based on the total value assessment, where the competitiveness of the offer in relation to both technical and financial proposals will be thoroughly evaluated.
Bids must be submitted electronically through the GEM portal according to the guidelines provided in the tender documentation. Ensuring all required documents are submitted in the accepted formats is critical.
While the document doesn't specify exact dates, bidders are encouraged to reference the tender notification for crucial submission timelines and deadlines that will be critical for successful participation.
The evaluation and selection process involves a review of all submitted documents for compliance followed by a financial assessment. It is designed to ensure that the most qualified bidder who meets technical specifications and offers competitive pricing is selected.
Notifications of results will be sent out per the tender's timeline followed by any additional procedural steps as detailed in the official communications and documentation.
Sign up now to access all documents
Main Document
OTHER
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS