TenderDekho Logo
GEM

Open Tender for To determine the magnetization characteristics and the speed Vs voltage curve of a separately excit in AIZAWL, MIZORAM

Bid Publish Date

20-Feb-2025, 11:50 am

Bid End Date

01-Apr-2025, 12:00 pm

Progress

Issue20-Feb-2025, 11:50 am
Technical31-03-2025 18:53:11
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

17

Category

To determine the magnetization characteristics and the speed Vs voltage curve of a separately excited DC Generator

Bid Type

Two Packet Bid

Categories 34

Mizoram University announces a tender for To determine the magnetization characteristics and the speed Vs voltage curve of a separately excited DC Generator, To determine the load characteristics of separately excited and shunt DC generators, To determine the load characteristics compound generators, To determine the mechanical characteristic of series Motor, To determine the performance and Mechanical characteristics of DC shunt Motor, Study of Speed control of D C shunt motor Shunt field control Armature resistance control, Study of Speed Torque characteristics of compound DC motor, Estimation of efficiency of DC machine by Swinburns test, Estimation of efficiency of DC machine by Hopkinsons test, Open circuit and short circuit tests on a single transformer, Sumpners test on two identical transformers, Three phase to Two phase conversion Scott Connection, 250 W MPPT Boost converter for solar PV, 250W Single phase grid synchronised inverer for solar PV, Grid synchronized inverter for integrating Three Energy sources, DFIG based wind energy conversion system, Three phased advanced power system experimentation setup in AIZAWL, MIZORAM. Quantity: 17. Submission Deadline: 01-04-2025 12: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

To determine the magnetization characteristics and the speed Vs voltage curve of a separately excited DC Generator , To determine the load characteristics of separately excited and shunt DC generators , To determine the load characteristics compound generators , To determine the mechanical characteristic of series Motor , To determine the performance and Mechanical characteristics of DC shunt Motor , Study of Speed control of D C shunt motor Shunt field control Armature resistance control , Study of Speed Torque characteristics of compound DC motor , Estimation of efficiency of DC machine by Swinburns test , Estimation of efficiency of DC machine by Hopkinsons test , Open circuit and short circuit tests on a single transformer , Sumpners test on two identical transformers , Three phase to Two phase conversion Scott Connection , 250 W MPPT Boost converter for solar PV , 250W Single phase grid synchronised inverer for solar PV , Grid synchronized inverter for integrating Three Energy sources , DFIG based wind energy conversion system , Three phased advanced power system experimentation setup

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7551583.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 17 Items Sign in for GEM prices

#1

To determine the magnetization characteristics and the speed Vs voltage curve of a separately excited DC Generator

To determine the magnetization characteristics and the speed Vs voltage curve of a separately excited DC Generator

1 pieces Delivery: 30 days
#2

To determine the load characteristics of separately excited and shunt DC generators

To determine the load characteristics of separately excited and shunt DC generators

1 pieces Delivery: 30 days
#3

To determine the load characteristics compound generators

To determine the load characteristics compound generators

1 pieces Delivery: 30 days
#4

To determine the mechanical characteristic of series Motor

To determine the mechanical characteristic of series Motor

1 pieces Delivery: 30 days
#5

To determine the performance and Mechanical characteristics of DC shunt Motor

To determine the performance and Mechanical characteristics of DC shunt Motor

1 pieces Delivery: 30 days
#6

Study of Speed control of D C shunt motor Shunt field control Armature resistance control

Study of Speed control of D C shunt motor Shunt field control Armature resistance control

1 pieces Delivery: 30 days
#7

Study of Speed Torque characteristics of compound DC motor

Study of Speed Torque characteristics of compound DC motor

1 pieces Delivery: 30 days
#8

Estimation of efficiency of DC machine by Swinburns test

Estimation of efficiency of DC machine by Swinburns test

1 pieces Delivery: 30 days
#9

Estimation of efficiency of DC machine by Hopkinsons test

Estimation of efficiency of DC machine by Hopkinsons test

1 pieces Delivery: 30 days
#10

Open circuit and short circuit tests on a single transformer

Open circuit and short circuit tests on a single transformer

1 pieces Delivery: 30 days
#11

Sumpners test on two identical transformers

Sumpners test on two identical transformers

1 pieces Delivery: 30 days
#12

Three phase to Two phase conversion Scott Connection

Three phase to Two phase conversion Scott Connection

1 pieces Delivery: 30 days
#13

250 W MPPT Boost converter for solar PV

250 W MPPT Boost converter for solar PV

1 pieces Delivery: 30 days
#14

250W Single phase grid synchronised inverer for solar PV

250W Single phase grid synchronised inverer for solar PV

1 pieces Delivery: 30 days
#15

Grid synchronized inverter for integrating Three Energy sources

Grid synchronized inverter for integrating Three Energy sources

1 pieces Delivery: 30 days
#16

DFIG based wind energy conversion system

DFIG based wind energy conversion system

1 pieces Delivery: 30 days
#17

Three phased advanced power system experimentation setup

Three phased advanced power system experimentation setup

1 pieces Delivery: 30 days

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
A.S. INDUSTRIAL CORPORATION   Under PMA
-31-03-2025 18:53:11
2
ANSHUMAN TECH PRIVATE LIMITED   Under PMA
-31-03-2025 17:59:48
3
ASSOCIATED SCIENTIFIC CORPORATION   Under PMA
-29-03-2025 20:50:38
4
DELTA TECHNOLOGIES   Under PMA
-28-03-2025 16:29:46
5
DEVI ELECTRONICS   Under PMA
-25-03-2025 18:50:44
6
elco scientific   Under PMA
-30-03-2025 13:44:57
7
LAB CONCERN INDIA   Under PMA
-01-04-2025 08:16:25
8
MAAN INDIA   Under PMA
-01-04-2025 08:17:08
9
MAVERICK TECHNOLOGIES   Under PMA
-27-03-2025 16:39:08
10
MICROMOT CONTROLS   Under PMA
-31-03-2025 07:16:24
11
SKYYSKILL ACADEMY PRIVATE LIMITED   Under PMA
-31-03-2025 18:22:14
12
SUPERB TECHNOLOGIES   Under PMA
-30-03-2025 11:01:30

Frequently Asked Questions

Key insights about MIZORAM tender market

What are the qualification requirements for equipment procurement tenders?

The qualification requirements include being a registered entity capable of supplying the necessary equipment as per the technical specifications listed in the tender documents. Additionally, bidders must have the requisite financial documents demonstrating stability and compliance with the specified eligibility criteria.

What documents are required to participate in this tender?

Bidders must submit certifications as specified in the Additional Terms and Conditions (ATC), including OEM authorization and compliance with BoQ specifications. Ensure to upload all necessary documentation in the accepted formats to validate your bid submission.

How do I register to participate in the tender?

To register for participation, bidders should follow the registration process outlined in the tender document. Ensure to provide all required information and documents to avoid disqualification. Familiarize yourself with the submission guidelines and deadlines provided in the tender documentation.

What payment terms are included in the tender?

The payment terms are detailed in the tender document and will typically describe conditions related to the performance security and milestones for payments. Suppliers must comply with these terms to ensure timely financial settlements post-delivery.

Does the tender provide benefits for MSMEs and startups?

Yes, the tender includes special provisions for Micro, Small, and Medium Enterprises (MSMEs) and startups. Bidders are encouraged to comply with the eligibility criteria outlined to take full advantage of these benefits which aim to promote local businesses and innovations in compliance with national policies such as 'Make in India.'