Bid Publish Date
07-Aug-2026, 2:44 pm
Bid End Date
07-Sep-2026, 3:00 pm
EMD
₹11,413
Location
Progress
Public procurement opportunity for Directorate General Of Lighthouses And Lightships SITC of WBOU, SITC of WIAP, SITC of 8 Port Switch, SI of SS Pole, SICT for Network cable, SI of Network cable, SI of Casing capping, SI Laying of HDPE pipe in RAMANATHAPURAM, TAMIL NADU. Quantity: 662 issued by. Submission Deadline: 07-09-2026 15: 00: 00. View full details and respond.
Quantity
662
Category
SITC of WBOU
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
22
Past Performance
80 %
Warranty Period
7 days
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SITC of WBOU , SITC of WIAP , SITC of 8 Port Switch , SI of SS Pole , SICT for Network cable , SI of Network cable , SI of Casing capping , SI Laying of HDPE pipe
Advisory Bank
State Bank of India
Pre-Bid Date
17-08-2026 15:00:00
Pre-Bid Venue
O/o The Director, Directorate of Lighthouses and Lightships, 5/20 Jaffer Syrang street, Deep Bhavan, Chennai- 600001
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Ramanathapuram
Delivery Pincodes
623526
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Palaniswamy S | 623526,Rameswaram DGPS Station, Anna Nagar (Near Karuppanna Samy koil), Rameswaram, Ramanathapuram District, Tamil Nadu State. PIN: 623526. | Ramanathapuram | Tamil Nadu | 623526 | 2 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
SITC of WBOU
SITC of Wireless Bridge outdoor unit as per Annexure -I
SITC of WIAP
SITC of Wireless indoor Access point a as per Annexure -I
SITC of 8 Port Switch
SITC of 8 Port Switch Network Switch for Distributionas per Annexure -I
SI of SS Pole
S I of SS Pole for installing Out door Antenna as per GEM Terms & Conditions
SICT for Network cable
SITC of Network cable as per Annexure -I
SI of Network cable
S&I, of Network cable with CAT 6 Armoured as per Annexure -I
SI of Casing capping
SI InCasing capping and SS clamps & Screws for Indoor
SI Laying of HDPE pipe
S I Laying and Installation charges for cables with Flexible HDPE pipe in ground upto 90cm Outdoor
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SITC of WBOU | SITC of Wireless Bridge outdoor unit as per Annexure -I | 2 | numbers | [email protected] | 60 | |
| 2 | SITC of WIAP | SITC of Wireless indoor Access point a as per Annexure -I | 6 | numbers | [email protected] | 60 | |
| 3 | SITC of 8 Port Switch | SITC of 8 Port Switch Network Switch for Distributionas per Annexure -I | 2 | numbers | [email protected] | 60 | |
| 4 | SI of SS Pole | S I of SS Pole for installing Out door Antenna as per GEM Terms & Conditions | 2 | number | [email protected] | 60 | |
| 5 | SICT for Network cable | SITC of Network cable as per Annexure -I | 190 | meters | [email protected] | 60 | |
| 6 | SI of Network cable | S&I, of Network cable with CAT 6 Armoured as per Annexure -I | 80 | meters | [email protected] | 60 | |
| 7 | SI of Casing capping | SI InCasing capping and SS clamps & Screws for Indoor | 300 | meters | [email protected] | 60 | |
| 8 | SI Laying of HDPE pipe | S I Laying and Installation charges for cables with Flexible HDPE pipe in ground upto 90cm Outdoor | 80 | meters | [email protected] | 60 |
Extended Deadline
07-Sep-2026, 9:30 am
Opening Date
07-Sep-2026, 10:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer