Indian Army Kitchenware Tender Meerut Uttar Pradesh 2026: Stainless Steel & Utensil Categories Supply, Installation & Commissioning
Indian Army
MEERUT, UTTAR PRADESH
Progress
Quantity
1
Bid Type
Single Packet Bid
Bharat Electronics Limited invites bids for establishing a PNG gas pipeline under the Department of Defence Production framework. The scope centers on on-site pipeline establishment with a delivery timeline of one month from site clearance. The procurement requires formal acknowledgement of the BEL scope of work, submission of supplier compliance (Annexure-III), and statutory docs including GST registration, PAN card, MSME/Udyam certificate. A PNG gas sale agreement exists between BEL and Gail Gas Limited, underscoring regulatory alignment. The tender emphasizes bidder comprehension of scope and the right of BEL to reject any or all bids, while demanding adherence to the stated terms. This is a focused execution contract rather than a multi-item BOQ, highlighting single-scope execution with strict delivery and certification prerequisites.
Delivery timeline is strictly 1 month post site clearance
100% payment within 30 days after Engineer-in-Charge certification
Bel reserves the right to reject any or all bids without assigning reasons
100% payment within 30 days after completion of service and certification by Engineer-in-Charge
Delivery within 1 month from site clearance by Engineer-in-Charge
Not specified in provided text
Submit signed BEL scope of work and Annexure-III
Provide GST, PAN, and MSME/Udyam certificates
Demonstrate capability to complete PNG gas pipeline establishment within 1 month post site clearance
Main Document
SCOPE_OF_WORK
OTHER
OTHER
OTHER
OTHER
PAYMENT
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
MEERUT, UTTAR PRADESH
Indian Army
RAJAURI, JAMMU & KASHMIR
Power Grid Corporation Of India Limited
ALLAHABAD, UTTAR PRADESH
Indian Army
Ajmer, RAJASTHAN
Bharat Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Duly signed BEL scope of work/tender document
Duly filled supplier compliance (Annexure-III) for commercial terms in technical bid
Scanned GST Registration certificate
Copy of PAN card
MSME/Udyam Registration Certificate (post-01.04.2025 download if applicable)
Any other Statutory Certificates relevant to the bid
Acknowledgement of intention to comply with BEL scope and tender content
Key insights about KARNATAKA tender market
Bidders must submit the signed BEL scope of work, complete Annexure-III supplier compliance, and upload GST registration, PAN, and MSME/Udyam certificates. Ensure acceptance of the BEL scope and awareness of the BEL-Gail Gas Limited PNG Gas Sale Agreement terms. Delivery is 1 month post site clearance, with 100% payment within 30 days after certification.
Required documents include the signed BEL scope of work, filled Annexure-III, GST registration, PAN card, MSME/Udyam certificate (post-2025 if applicable), and other statutory certificates. Tender submission implies understanding of scope and agreement to BEL terms; BEL may reject bids without reasons.
Delivery is expected within one month from date of site clearance by the Engineer-in-Charge. Contractors must ensure mobilization, safety clearances, and on-site coordination with BEL and Engineer-in-Charge to meet the timeline and earn certification for payment.
Payment is 100% within 30 days after completion and certification by the Engineer-in-Charge. Ensure all certifications and site completion reports are submitted to enable timely processing; late payments are not indicated in the provided terms.
The engagement follows the PNG Gas Sale Agreement between BEL and Gail Gas Limited. Compliance with this agreement and the BEL scope is mandatory, with BEL retaining right to reject any bid not meeting stated conditions or terms.
Submit GST registration, PAN, and MSME/Udyam certificates (date-specific upload if applicable). Also ensure compliance with BEL’s Annexure-III for commercial terms; the bidder must acknowledge and accept all tender contents and scope.
Yes. BEL reserves the right to reject any or all tenders without assigning any reason. Bidders should ensure full compliance with BEL scope, Annexure-III, and the PNG Gas Sale Agreement to maximize bid viability.
The scope involves establishing a PNG gas pipeline under BEL guidance, with site clearance by Engineer-in-Charge and delivery within 1 month. Ensure agreement to BEL scope, complete Annexure-III, and readiness to comply with the BEL-Gail Gas Limited framework.
Bharat Sanchar Nigam Limited Portal(bsnl)
📍 DHARWARD, KARNATAKA
Armoured Vehicles Nigam Limited
Indian Coast Guard
📍 VISAKHAPATNAM, ANDHRA PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Indian Army
📍 KOTA, RAJASTHAN
Sign up now to access all documents
Main Document
SCOPE_OF_WORK
OTHER
OTHER
OTHER
OTHER
PAYMENT
GEM_GENERAL_TERMS_AND_CONDITIONS