TenderDekho Logo
Active GEM

Central Warehousing Corporation Fumigation & Safety Equipment Tender 2026 NSPM-11 MBr Fumigation Rajasthan

Bid Publish Date

15-Jul-2026, 1:28 pm

Bid End Date

29-Jul-2026, 11:00 am

EMD

₹16,797

Progress

Issue15-Jul-2026, 1:28 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

3

Bid Type

Two Packet Bid

Key Highlights

  • EMD exact amount: ₹16,797
  • 25% quantity variation permitted during contract
  • Delivery period calculated with minimum 30 days and extension rules
  • GeM portal used for e-tendering; GeM-GTC governs only if terms align
  • NSPM-11 (MBr Fumigation) accreditation context for safety equipment
  • No BOQ items specified in data; requires interpretation of general terms
  • ATC clauses uploaded separately to govern tender execution

Categories 5

Tender Overview

Central Warehousing Corporation seeks procurement of essential fumigation and safety equipment under NSPM-11 (MBr Fumigation) via the GeM portal. The estimated value is not disclosed; the EMD is ₹16,797. The tender allows quantity variation up to 25% at contract award and during the currency of the contract at contracted rates. Delivery timelines are defined as commencing from the last date of the original delivery order, with extended time based on the option clause. No BOQ items are listed, and location details are not specified in the data. The GeM platform will govern tender participation, with tender terms prevailing over GeM-GTC where inconsistencies arise.

Technical Specifications & Requirements

  • EMD: ₹16,797 (earned deposit to participate).
  • Product category: Essential fumigation & safety equipment for accreditation under NSPM-11 (MBr fumigation).
  • Quantity variation: Up to 25% of bid quantity and contracted quantity during placement and currency of contract.
  • Delivery period mechanism: Calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extended delivery follows the same logic.
  • Platform: GeM portal used for e-tendering; tender terms prevail over GeM-GTC.
  • BOQ: Not available; no itemized list provided.
  • Standards/Certifications: Not specified within the data; bidders should rely on NSPM-11 compliance for fumigation equipment.

Terms, Conditions & Eligibility

  • Delivery terms: Delivery period begins after the original delivery order; option-based extension is permitted under the 25% quantity clause.
  • GeM precedence: Tender/spec terms prevail over GeM-GTC in case of inconsistency.
  • ATC: Additional terms exist in uploaded ATC documents on GeM portal; bidders must review.
  • Compliance: Bidders must comply with all attached terms and conditions; no explicit location or date provided in the data.

Key Specifications

  • Product/service: Essential fumigation & safety equipment for accreditation under NSPM-11 (MBr fumigation)

  • EMD amount: ₹16,797

  • Quantity variation: up to 25%

  • Delivery period: starts from last date of original delivery order; extended time formula applies with minimum 30 days

  • Platform: GeM portal; GeM-GTC applies where tender terms align

  • BOQ: Not provided; rely on general NSPM-11 requirements and ATC documents

Terms & Conditions

  • EMD of ₹16,797 required for bid participation

  • Quantity may be increased up to 25% at contract award and during currency

  • Delivery schedule follows formula-based extension with a 30-day minimum

  • GeM platform governs process; tender terms prevail over GeM-GTC

  • ATC document contains additional bidder obligations

Important Clauses

Payment Terms

Not specified in data; participants should review ATC for any payment milestones or advances tied to NSPM-11 compliant equipment

Delivery Schedule

Delivery period starts from the last date of the original delivery order; extended time = (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in data; check ATC for LD provisions or performance bonds

Bidder Eligibility

  • Experience in supplying fumigation or safety equipment for accreditation programs

  • Financial capability to support NSPM-11 related procurement

  • GST registration and PAN compliance with statutory documentation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Essential Fumigation & Safety Equipment for Accreditation under NSPM-11 (MBr Fumigation)

Advisory Bank

HDFC Bank

ePBG Percentage

5%

ePBG Duration (Months)

27

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

2

Delivery Cities

Lucknow, Shahjahanpur

Delivery Pincodes

226010, 242001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Somit Kumar242001,Krishi Utpadan Mandi Samiti, Roza,Shahjahanpur- 242001ShahjahanpurUttar Pradesh242001115-
Ravi Tiwari226010,Central Warehousing Corporation, Vibhuti KhandLucknowUttar Pradesh226010115-

Authority Records

MINISTRY OF CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTIONFOOD AND PUBLIC DISTRIBUTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9609413.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar fumigation/safety equipment supply

4

Financial statements or turnover proof

5

EMD submission document for ₹16,797

6

Technical bid documents and compliance certificates

7

OEM authorizations (if applicable) and supplier certifications

8

Any specific NSPM-11 compliance documents referenced in ATC

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid on fumigation equipment tender in Rajasthan 2026 for NSPM-11?

Bidders must submit GST, PAN, experience certificates, financials, and EMD of ₹16,797 via GeM; review ATC documents, ensure NSPM-11 compliance, and adhere to the 25% quantity variation clause with delivery timelines starting after the original order date.

What documents are required for Central Warehousing Corporation fumigation tender 2026?

Prepare GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD submission, technical compliance certificates, and OEM authorizations if applicable; review GeM ATC for any additional requirements specific to NSPM-11 equipment.

What are the delivery terms for NSPM-11 equipment tender 2026?

Delivery begins from the last date of the original delivery order; if quantity increases, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extension can reach the original delivery period under option clause.

Which standards or certifications are required for fumigation safety equipment tender?

Tender data does not specify exact standards; bidders should ensure NSPM-11 related accreditation compliance and review uploaded ATC for any certification requirements and OEM authorizations linked to the fumigation equipment.

What is the EMD amount for the NSMP-11 fumigation procurement?

The Earnest Money Deposit is ₹16,797; ensure payment via the designated GeM process and attach EMD document with bid submission to participate in the NSPM-11 equipment tender.

What are the key evaluation factors for CWC fumigation equipment bid 2026?

Primary factors include EMD submission, NSPM-11 compliance, OEM authorization where required, experience in similar projects, and adherence to the 25% quantity variation terms; detailed terms appear in ATC documents on GeM.