TenderDekho Logo
Closed GEM

Contract Bidding Open For 4 MP camera,NVR,HDD,Display,24 port PoE Switch,9U Rack,6U Rack,6 Port LIU,SC-LC patch cord,Cat6 Cab in KANCHIPURAM, TAMIL NADU

Bid Publish Date

27-Jun-2026, 10:04 am

Bid End Date

18-Jul-2026, 10:00 am

EMD

₹30,466

Value

₹15,23,321

Progress

RA
Issue27-Jun-2026, 10:04 am
Reverse Auction22-Aug-2026, 2:00 pm
AwardPending

Indian Army announces a tender for 4 MP camera, NVR, HDD, Display, 24 port PoE Switch, 9U Rack, 6U Rack, 6 Port LIU, SC-LC patch cord, Cat6 Cable, 6 Core OFC, 3 Core 2. 5 SQMM power cable, 3 KVA UPS, 1 KVA UPS, 25 MM PVC Pipe, 40MM HDPE pipe, 10 Feet Pole, Soft and Hard soil digging, Installation, Testing and commissioning in KANCHIPURAM, TAMIL NADU. Quantity: 2247. Submission Deadline: 18-07-2026 10: 00: 00. Last date to apply is approaching fast!

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Reverse Auction Schedule

Completed

Start

22-Aug-2026, 2:00 pm

End

24-Aug-2026, 2:00 pm

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

2247

Category

4 MP camera

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Warranty Period

3 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

4 MP camera , NVR , HDD , Display , 24 port PoE Switch , 9U Rack , 6U Rack , 6 Port LIU , SC-LC patch cord , Cat6 Cable , 6 Core OFC , 3 Core 2.5 SQMM power cable , 3 KVA UPS , 1 KVA UPS , 25 MM PVC Pipe , 40MM HDPE pipe , 10 Feet Pole , Soft and Hard soil digging , Installation, Testing and commissioning

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

38

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Kanchipuram

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KanchipuramKanchipuram--2045-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9355532.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 19 Items Sign in for GEM prices

#1

4 MP camera

Supply of 4 MP outdoor Bullet Fixed lens camera along with fixing accessories, Certificate STQC Mandatory

20 no Delivery: 45 days
#2

NVR

Supply of 32 Channel NVR with 4 SATA and accessories

1 no Delivery: 45 days
#3

HDD

Supply of Surveillance HDD 8TB

4 no Delivery: 45 days
#4

Display

Supply of 55 inch 24by7 Display with fixing accessories

1 no Delivery: 45 days
#5

24 port PoE Switch

Supply of 24 port PoE Switch with 4 SFP fully loaded with accessories

2 no Delivery: 45 days
#6

9U Rack

Supply of 9U Rack 600MM Depth with PDU and fixing accessories

1 no Delivery: 45 days
#7

6U Rack

Supply of 6U Rack with PDU and fixing accessories

2 no Delivery: 45 days
#8

6 Port LIU

Supply of 6 Port LIU and Fully loaded with fixing accessories

2 no Delivery: 45 days
#9

SC-LC patch cord

Supply of SC LC Duplex Fibre Patch cords

4 no Delivery: 45 days
#10

Cat6 Cable

Supply of Cat6 Cable

5 box Delivery: 45 days
#11

6 Core OFC

Supply of 6 Core Single Mode OFC Cable

500 mtrs Delivery: 45 days
#12

3 Core 2.5 SQMM power cable

Supply of 3 Core 2.5 SQMM power cable Armoured

300 mtrs Delivery: 45 days
#13

3 KVA UPS

Supply of 3 KVA UPS 1 hour backup time with Battery and fixing accessories

1 no Delivery: 45 days
#14

1 KVA UPS

Supply of 1 KVA UPS

1 no Delivery: 45 days
#15

25 MM PVC Pipe

Supply of 25 MM PVC Pipe with fixing accessories

500 mtrs Delivery: 45 days
#16

40MM HDPE pipe

Supply of 40MM HDPE pipe with fixing accessories

500 mtrs Delivery: 45 days
#17

10 Feet Pole

Supply of 10 Feet Pole with concrete work and fixing accessories

2 no Delivery: 45 days
#18

Soft and Hard soil digging

Supply of Soft and Hard soil digging with back filling

400 mtrs Delivery: 45 days
#19

Installation, Testing and commissioning

Installation, Testing and commissioning of the above items

1 ls Delivery: 45 days

Categories 38

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate

4

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer