Progress
RAThe Indian Army, Department of Military Affairs, seeks supply, installation, testing and commissioning of Servo Motor Operated Automatic Line Voltage Correctors conforming to IS 9815 (Part 1) - Single Phase Applications. Scope includes delivery, installation and commissioning at consignee location with OEM warranty of 1 year. Data Sheets must accompany bids and OEM certificates are required. Bidder must show at least 3 years of experience supplying similar category products to central/state government or PSUs, with contracts and quantities for each year. Importantly, OEM confirmation for stabilizers and a registered Indian office for after-sales support are mandatory. The scope emphasizes repair response within 72 hours during warranty and post-warranty support through India-based service teams. Unique ATC clauses demand OEM MAF for stabilizers and strict adherence to supply timelines. This tender details a formal vendor code creation process and requires bank-related submission documents to enable EFT payments. Tender in India emphasizes installation, testing, and commissioning as core deliverables, with a clear focus on IS 9815 Part 1 compliance and single-phase applicability.
EMD amount not specified; ensure alignment with ATC and bank guarantees
3 years’ experience in government supply; provide annual contracts and quantities
OEM certificate/MAF for stabilizers; Indian office for after-sales service
EFT-based payment linked to submission of bank mandate and vendor code; no specific percentage given
Installation, commissioning and testing to be conducted as part of SITC scope; no explicit timeline provided
72-hour fault repair obligation; non-compliance allows purchaser to recover costs via PBG or dues
3 years of experience supplying similar products to Central/State Govt or PSU
OEM or OEM-certified supplier with Indian after-sales service capability
Data Sheet alignment and documentation readiness (PAN, GST, EFT mandate)
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | VOLTAIRE POWER SYSTEMS LLP(MSE) Under PMA Winner | ₹1,55,955 | Item Categories : Servo Motor Operated Automatic Line Voltage Correctors Conforming to IS 9815 (Part 1) - Single Phas |
| L2 | Power Select Systems (MSE) Under PMA | ₹1,56,111 | Item Categories : Servo Motor Operated Automatic Line Voltage Correctors Conforming to IS 9815 (Part 1) - Single Phas |
| L3 | AULTEN DIGITAL PRIVATE LIMITED Under PMA | ₹2,65,500 | Item Categories : Servo Motor Operated Automatic Line Voltage Correctors Conforming to IS 9815 (Part 1) - Single Phas |
🎉 L1 Winner
VOLTAIRE POWER SYSTEMS LLP(MSE) Under PMA
Final Price: ₹1,55,955
Start
23-Aug-2026, 8:00 pm
End
24-Aug-2026, 8:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
12
Category
Servo Motor Operated Automatic Line Voltage Correctors Conforming to IS 9815 (Part 1) - Single Phase Applications
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
6
Past Performance
40 %
Warranty Period
1 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Servo Motor Operated Automatic Line Voltage Correctors Conforming to IS 9815 (Part 1) - Single Phase Applications (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
14
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
JAIPUR (WEST)
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | JAIPUR (WEST) | JAIPUR (WEST) | - | - | 3 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
CATALOG Specification
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Data Sheet of offered product
OEM certificate / MAF for stabilizer in bid
Experience certificates showing 3 years in similar government projects
Contract copies for yearly quantities supplied
OEM authorization for India-based after-sales service
Warranty certificates from OEM
Proof of installation/commissioning capability (OEM resources)
| Category | Specification | Requirement |
|---|---|---|
| Construction | Rating (in KVA) | 5 |
Key insights about RAJASTHAN tender market
Bidders must submit PAN, GST, cancelled cheque, EFT mandate, and a Data Sheet aligned to IS 9815 Part 1. Provide OEM certificate for stabilizers, and proof of Indian after-sales service capability. Ensure 3 years of government supply experience and SITC scope coverage in your bid.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, Data Sheet, OEM certificate/MAF for stabilizers, 3-year government supply contracts, and proof of India-based after-sales service capability. Ensure data sheet matches technical parameters.
Stabilizers must conform to IS 9815 (Part 1) for single-phase applications. Bidders must attach a Data Sheet proving IS 9815 compliance and ensure OEM warranty certificates accompany delivery and SITC scope.
The warranty is 1 year from final acceptance or after installation completion, whichever is later. OEM warranty certificates must be submitted at delivery; timely repair within 72 hours is required during the warranty period.
Bidders must demonstrate an established Installation, Commissioning, Training, Troubleshooting and Maintenance service network in India, with OEM-certified resources or OEM-authorized resellers for SITC deployment and post-warranty support.
Payments are EFT-based, contingent on submission of a bank-mandated form and vendor code creation. While no specific percentage is stated, ensure bank details match the EFT mandate and that invoices align with final SITC deliverables.
Submit copies of contracts with Central/State Govt or PSU entities showing consistent supply of similar category products, with yearly quantities. If bundles exist, the primary high-value product must meet the 3-year criterion.
Installation, Commissioning and Testing must be carried out by OEM-certified resources or authorized resellers. Complete SITC scope includes on-site installation, system integration, and training if applicable, with performance validation at consignee location.