Bid Publish Date
14-Oct-2026, 6:02 pm
Bid End Date
24-Oct-2026, 7:00 pm
Location
Progress
Central Bank Of India invites bids for procurement of Split Air Conditioners in Guntur, Andhra Pradesh including 1 Ton 5-Star, 1.5 Ton 5-Star, and 2 Ton 5-Star models with copper hose and wall mount stands. The scope covers supply, installation, testing, and commissioning as part of the bid, with multiple size options consolidated under one procurement. The absence of explicit estimated value is noted, while the set of ATC clauses emphasize OEM authorization and local service capabilities. A key differentiator is the requirement for ISO 45001 certification and a local support presence, plus manufacturer authorization. The tender integrates a flexible quantity clause up to 25% variation and a commitment to deliver per contract terms in the event of quantity changes. Unique aspects include mandatory service centers in the state and a local office requirement in Guntur or Vijayawada for post-bid support.
Split Air Conditioners: 1 Ton, 1.5 Ton, 2 Ton, 5-Star rated
Copper hose included; wall mount stand supplied
Energy efficiency: 5-Star rating (BEE standard)
OEM certification: ISO 45001 required
Service: dedicated toll-free support; service centers in state
Delivery scope: Supply, Installation, Testing and Commissioning
25% quantity variation allowed during contract and currency
OEM must hold ISO 45001 certification; MA must be provided
Local support: registered office in Guntur/Vijayawada; service center in state
Bid must include OEM authorization letter; without MAF bid will be rejected
Functional service center in the consignee's state; evidence required; 30 days setup if absent
Quantity variation up to 25%; delivery period adjustments based on formula with minimum 30 days
Local office presence in Guntur or Vijayawada for post-sale support
ISO 45001 certification by OEM
No liquidation or bankruptcy status; valid undertaking required
Quantity
57
Category
Split Air Conditioner 1.5 TON, 5Star
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
3
OEM Avg. Turnover
3
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner 1 TON, 5Star , Split Air Conditioner 1.5 TON, 5Star , Split Air Conditioner 2TON, 5Star , copper hose , waal mount stand
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Guntur
Delivery Pincodes
522004
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Dudekula Usman | 522004,Central Bank of India, Regional Office, Nagarapalem, Guntur | Guntur | Andhra Pradesh | 522004 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Split Air Conditioner 1 TON, 5Star
Split Air Conditioner 1 TON, 5Star
Split Air Conditioner 1.5 TON, 5Star
Split Air Conditioner 1.5 TON, 5Star
Split Air Conditioner 2TON, 5Star
Split Air Conditioner 2TON, 5Star
copper hose
copper hose
waal mount stand
waal mount stand
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Split Air Conditioner 1 TON, 5Star | Split Air Conditioner 1 TON, 5Star | 2 | pieces | cmhrdguntro | 10 | |
| 2 | Split Air Conditioner 1.5 TON, 5Star | Split Air Conditioner 1.5 TON, 5Star | 15 | pieces | cmhrdguntro | 10 | |
| 3 | Split Air Conditioner 2TON, 5Star | Split Air Conditioner 2TON, 5Star | 2 | pieces | cmhrdguntro | 10 | |
| 4 | copper hose | copper hose | 19 | pieces | cmhrdguntro | 10 | |
| 5 | waal mount stand | waal mount stand | 19 | pieces | cmhrdguntro | 10 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar AC supply/installation
Financial statements or banker’s certificate
EMD/Security deposit documentation (as applicable)
Manufacturer Authorization Letter (MAF)
OEM authorization and ISO 45001 proof
Technical compliance statement on bidder/OEM letterhead
Local office registration proof in Guntur or Vijayawada
Key insights about ANDHRA PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD, MA letter, and ISO 45001 proof. Include OEM authorization and a local Guntur/Vijayawada office for service. The offer should cover supply, installation, testing, and commissioning with adherence to the 25% quantity variation clause.
Required documents include GST certificate, PAN, experience certificates of similar AC projects, financial statements, EMD documentation, OEM MA letter, ISO 45001 proof, technical compliance letter on bidder/OEM letterhead, and proof of a local service center in Andhra Pradesh.
Tender specifies 1 Ton, 1.5 Ton, and 2 Ton units with 5-Star energy efficiency. Each unit should include copper refrigerant hose and wall-mount stand. OEM must provide ISO 45001 certification and MA letter; service centers must be established in the state.
Scope includes Supply, Installation, Testing and Commissioning of goods. Delivery terms allow for up to 25% quantity variation; delivery period starts from the last date of the original delivery order, with minimum 30 days added for extended periods.
Payment terms are not explicitly stated in the data; however, contracts typically follow milestone-based payments upon installation and commissioning, subject to verification of service centers and submission of required documentation including MAF and ISO 45001 proofs.
Verify that the bidder has a local office in Guntur or Vijayawada, provides ISO 45001, holds a valid MA letter, and can demonstrate functional service centers in the state or establish within 30 days post-award; avoid entities in liquidation or bankruptcy.
The option clause allows increasing or decreasing order quantity by up to 25% at contract placement and during the currency at contracted rates. Delivery time adjusts based on a formula, ensuring minimum 30 days extension where necessary.
Mandatory standards include ISO 45001 certification for OEMs, Manufacturer Authorization Letter (MAF), and proof of a local service center. Bidders must also provide a detailed technical compliance statement on OEM letterhead.