TenderDekho Logo
Active GEM

Central Bank Of India Split Air Conditioners Procurement Guntur Andhra Pradesh 5Star ISo 45001 OEM Authorization 2026

Bid Publish Date

14-Oct-2026, 6:02 pm

Bid End Date

24-Oct-2026, 7:00 pm

Progress

Issue14-Oct-2026, 6:02 pm
AwardPending

Key Highlights

  • • Local service center requirement in Andhra Pradesh with 30-day setup deadline
  • • ISO 45001 certification mandated for OEMs; MA letter required
  • • Manufacturer Authorization Letter (MAF) is mandatory for bid submission
  • • Option clause allows ±25% quantity variation during contract and currency

Tender Overview

Central Bank Of India invites bids for procurement of Split Air Conditioners in Guntur, Andhra Pradesh including 1 Ton 5-Star, 1.5 Ton 5-Star, and 2 Ton 5-Star models with copper hose and wall mount stands. The scope covers supply, installation, testing, and commissioning as part of the bid, with multiple size options consolidated under one procurement. The absence of explicit estimated value is noted, while the set of ATC clauses emphasize OEM authorization and local service capabilities. A key differentiator is the requirement for ISO 45001 certification and a local support presence, plus manufacturer authorization. The tender integrates a flexible quantity clause up to 25% variation and a commitment to deliver per contract terms in the event of quantity changes. Unique aspects include mandatory service centers in the state and a local office requirement in Guntur or Vijayawada for post-bid support.

Technical Specifications & Requirements

  • Product category: Split ACs (1, 1.5, 2 Ton) with 5-Star energy rating
  • Special features: Copper refrigerant hose integration; wall-mount stand inclusion
  • Standards/Certifications: ISO 45001 certified (OEM), Manufacturer Authorization Letter (MAF) required, local service capability in Andhra Pradesh
  • Delivery/Installation Scope: Supply, installation, testing, commissioning; on-site or carry-in as per warranty terms
  • Service & Support: Escalation matrix and toll-free support; functional service center in the state; 30-day post-award setup guarantee if not existing
  • BoQ status: 5 items listed with N/A quantities, indicating item-level details to be confirmed during bid

Terms, Conditions & Eligibility

  • Option Clause: Quantity may change by up to 25% during contract and currency; extended delivery time follows a computed formula with a minimum of 30 days
  • Financial Standing: Bidder must not be in liquidation or bankruptcy; requires an undertaking
  • Delivery Timeline: Delivery period tied to last delivery order date; extended periods follow the option clause
  • Documentation: OEM authorization letter; MAF; ISO 45001 proof; local office registration in Guntur/Vijayawada; service center evidence
  • Warranty/Support: On-site or carry-in service based on warranty; dedicated support numbers and escalation path required

Key Specifications

  • Split Air Conditioners: 1 Ton, 1.5 Ton, 2 Ton, 5-Star rated

  • Copper hose included; wall mount stand supplied

  • Energy efficiency: 5-Star rating (BEE standard)

  • OEM certification: ISO 45001 required

  • Service: dedicated toll-free support; service centers in state

  • Delivery scope: Supply, Installation, Testing and Commissioning

Terms & Conditions

  • 25% quantity variation allowed during contract and currency

  • OEM must hold ISO 45001 certification; MA must be provided

  • Local support: registered office in Guntur/Vijayawada; service center in state

Important Clauses

Manufacturer Authorization

Bid must include OEM authorization letter; without MAF bid will be rejected

Service Center Availability

Functional service center in the consignee's state; evidence required; 30 days setup if absent

Option Clause and Delivery

Quantity variation up to 25%; delivery period adjustments based on formula with minimum 30 days

Bidder Eligibility

  • Local office presence in Guntur or Vijayawada for post-sale support

  • ISO 45001 certification by OEM

  • No liquidation or bankruptcy status; valid undertaking required

Advertisement

Tender Data

Bid Details

Quantity

57

Category

Split Air Conditioner 1.5 TON, 5Star

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3

OEM Avg. Turnover

3

Past Performance

10 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Split Air Conditioner 1 TON, 5Star , Split Air Conditioner 1.5 TON, 5Star , Split Air Conditioner 2TON, 5Star , copper hose , waal mount stand

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Guntur

Delivery Pincodes

522004

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Dudekula Usman522004,Central Bank of India, Regional Office, Nagarapalem, GunturGunturAndhra Pradesh522004215-

Authority Records

MINISTRY OF FINANCEFINANCIAL SERVICES DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10036280.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Hyderabad Zonal Office

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Split Air Conditioner 1 TON, 5Star

Split Air Conditioner 1 TON, 5Star

2 pieces Delivery: 10 days
#2

Split Air Conditioner 1.5 TON, 5Star

Split Air Conditioner 1.5 TON, 5Star

15 pieces Delivery: 10 days
#3

Split Air Conditioner 2TON, 5Star

Split Air Conditioner 2TON, 5Star

2 pieces Delivery: 10 days
#4

copper hose

copper hose

19 pieces Delivery: 10 days
#5

waal mount stand

waal mount stand

19 pieces Delivery: 10 days
Advertisement

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar AC supply/installation

4

Financial statements or banker’s certificate

5

EMD/Security deposit documentation (as applicable)

6

Manufacturer Authorization Letter (MAF)

7

OEM authorization and ISO 45001 proof

8

Technical compliance statement on bidder/OEM letterhead

9

Local office registration proof in Guntur or Vijayawada

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for split AC tender in Guntur Andhra Pradesh 2026?

Bidders must submit GST, PAN, experience certificates, financial statements, EMD, MA letter, and ISO 45001 proof. Include OEM authorization and a local Guntur/Vijayawada office for service. The offer should cover supply, installation, testing, and commissioning with adherence to the 25% quantity variation clause.

What documents are required for AC procurement in Andhra Pradesh?

Required documents include GST certificate, PAN, experience certificates of similar AC projects, financial statements, EMD documentation, OEM MA letter, ISO 45001 proof, technical compliance letter on bidder/OEM letterhead, and proof of a local service center in Andhra Pradesh.

What are the technical specifications for 5-Star split ACs in this tender?

Tender specifies 1 Ton, 1.5 Ton, and 2 Ton units with 5-Star energy efficiency. Each unit should include copper refrigerant hose and wall-mount stand. OEM must provide ISO 45001 certification and MA letter; service centers must be established in the state.

What is the delivery and installation scope for the ACs?

Scope includes Supply, Installation, Testing and Commissioning of goods. Delivery terms allow for up to 25% quantity variation; delivery period starts from the last date of the original delivery order, with minimum 30 days added for extended periods.

What are the payment terms for the AC procurement?

Payment terms are not explicitly stated in the data; however, contracts typically follow milestone-based payments upon installation and commissioning, subject to verification of service centers and submission of required documentation including MAF and ISO 45001 proofs.

How to verify eligibility criteria for OEMs in this bid?

Verify that the bidder has a local office in Guntur or Vijayawada, provides ISO 45001, holds a valid MA letter, and can demonstrate functional service centers in the state or establish within 30 days post-award; avoid entities in liquidation or bankruptcy.

What is the purpose of the 25% option clause in this tender?

The option clause allows increasing or decreasing order quantity by up to 25% at contract placement and during the currency at contracted rates. Delivery time adjusts based on a formula, ensuring minimum 30 days extension where necessary.

Which standards and certifications are mandatory for bidders?

Mandatory standards include ISO 45001 certification for OEMs, Manufacturer Authorization Letter (MAF), and proof of a local service center. Bidders must also provide a detailed technical compliance statement on OEM letterhead.

Advertisement