Bid Publish Date
26-Sep-2026, 11:50 am
Bid End Date
08-Oct-2026, 12:00 pm
Location
Progress
East Central Railway invites bids for Copper Patch Cord (Q2) to be supplied as a standalone goods contract. The scope is limited to the supply of copper patch cords, with the option to increase quantity up to 25% during or after contract award. Inspection is conducted at the consignee site; pre-dispatch inspection is not indicated. The eligibility clause requires OEM or authorized dealer track record, with past performance demonstrating supply of copper patch cords in similar quantities. The tender emphasizes mandatory document upload and adherence to ATC terms. Delivery timelines are tied to the original order and extended periods per the option clause. The procurement location aligns with Indian Railways’ East Central region, targeting standard copper patch cords meeting unspecified technical specs. A unique differentiator is the explicit option to adjust quantities while maintaining contracted rates.
Option-based quantity variation up to 25% with calculated delivery time rules
Past performance: 20% quantity in last 3 financial years on similar copper patch cords
Mandatory submission of bid and ATC documents; non-compliance leads to rejection
GST responsibility rests with bidder; GST reimbursement as actuals or as per lower applicable rate
Delivery period linked to original delivery order; extended period calculations based on quantity changes, minimum 30 days
Not explicitly detailed; applicable penalties would be per ATC and contract terms
OEM or Authorized Dealer with bid-specific authorization
Past performance showing supply of copper patch cords for 20% of bid quantity in the last 3 financial years
Submission of all mandatory documents per bid/ATC formats
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | eNET WORK SOLUTIONS (MII) Under PMA | Item Categories : Copper Patch Cord,Copper Patch Cord | |
| L2 | LAKSH SL ENTERPRISES Under PMA | Item Categories : Copper Patch Cord,Copper Patch Cord | |
| L3 | SHIVAM ENTERPRISES Under PMA | Item Categories : Copper Patch Cord,Copper Patch Cord |
Quantity
2000
Category
Copper Patch Cord
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Copper Patch Cord (Q2)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Samastipur
Delivery Pincodes
848101
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Manohar Kumar | 848101,Office of General Stores Depot East Central Railway Samastipur | Samastipur | Bihar | 848101 | 1000 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for past performance on copper patch cords
Financial statements for the last financial year
Evidence of supply: R.Note/CRAC/CRN for similar contracts
Bid-specific authorization for OEM/authorized dealer
Technical compliance certificates (if any as per ATC)
Any other documents specified in bid/ATC (notified formats)
Key insights about BIHAR tender market
Bidders must be OEM or authorized dealers with bid-specific authorization. Upload all mandatory documents per ATC, including GST, PAN, and past-performance evidence showing 20% quantity supply in the last 3 financial years. Ensure post-receipt inspection compliance and adhere to the 25% quantity option clause.
Submit GST registration, PAN, experience certificates, financial statements, supply proofs (R.Note/CRAC/CRN), OEM authorization, and all bid/ATC-mandated certificates. Ensure formats match bid specifications to avoid rejection during evaluation.
Delivery is governed by the original delivery order with a potential 25% quantities increase/decrease. The extended delivery period is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Bidders must have supplied copper patch cords for at least 20% of the bid quantity against a single contract in the last 3 financial years, with supply proof including R.Note/CRAC/CRN attached.
GST applicability is to be checked by the bidder; reimbursement will be as actuals or at the lower applicable rate, subject to the quoted GST percentage.
Post-receipt inspection is conducted at the consignee site before acceptance; pre-dispatch inspection is not mandated unless specified in ATC.
Incomplete submission leads to bid rejection; ensure mandatory uploads of all bid-specific and ATC documents exactly as required.