Invitation to Bid - Removal and disposal of old tile and fittings,Supply and fitting of Wall tile and floor Tile,Supply in KHORDHA, ODISHA

Bid Publish Date

21-Jul-2025, 5:16 pm

Bid End Date

11-Aug-2025, 6:00 pm

Progress

Issue21-Jul-2025, 5:16 pm
Technical08-Aug-2025, 5:01 pm
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

2917

Category

Supply and fitting of Wall tile and floor Tile

Bid Type

Two Packet Bid

Categories 32

Central Board Of Excise And Customs (cbec) announces a tender for Removal and disposal of old tile and fittings, Supply and fitting of Wall tile and floor Tile, Supply and fitting of Grid Ceiling 2ft x 2ft, MDF door with Frame, Rajashree Door with fittings, Upvc Widows, PVC Storge Box, Supply and fitting of Exhaust Fan, Bath room Plumbing wiring Materials, Table top wash Basin, Urinal, Ladies Urinal, Urinal Partition, Western Commode, Indian Pan, Pillar Cock, 2 In 1 Bib cock, Health Faucet, Angle Cock, Coupline, Flance, Steel Jali, Towel Rail, Soap Stand, Round Towel Rail, Hand Wash Dispenser, Tissue Paper Holder, Hand Dryer, Mirror with frame, Connect Pipe, Waiste Pipe, Ceiling Lights, Electric wires 2 mm, Modular board with switches, Painting Work, Conceal head with Cover, Ladies Cupboard, Service Charges in KHORDHA, ODISHA. Quantity: 2917. Submission Deadline: 11-08-2025 18: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Removal and disposal of old tile and fittings , Supply and fitting of Wall tile and floor Tile , Supply and fitting of Grid Ceiling 2ft x 2ft , MDF door with Frame , Rajashree Door with fittings , Upvc Widows , PVC Storge Box , Supply and fitting of Exhaust Fan , Bath room Plumbing wiring Materials , Table top wash Basin , Urinal , Ladies Urinal , Urinal Partition , Western Commode , Indian Pan , Pillar Cock , 2 In 1 Bib cock , Health Faucet , Angle Cock , Coupline , Flance , Steel Jali , Towel Rail , Soap Stand , Round Towel Rail , Hand Wash Dispenser , Tissue Paper Holder , Hand Dryer , Mirror with frame , Connect Pipe , Waiste Pipe , Ceiling Lights , Electric wires 2 mm , Modular board with switches , Painting Work , Conceal head with Cover , Ladies Cupboard , Service Charges

Authority Records

MINISTRY OF FINANCEREVENUE DEPARTMENTCENTRAL BOARD OF EXCISE AND CUSTOMS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8118296.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 38 Items Sign in for GEM prices

#1

Removal and disposal of old tile and fittings

Provision of removal and debrises disposal of existing tiles with machine and labour all complete including cost, taxes and conveyance as per specification all complete as per direction of Engineer-in-charge.

1 job Delivery: 45 days
#2

Supply and fitting of Wall tile and floor Tile

Fixing Vitrified/Ceramic tiles in floors & wall on 25mm thick

1,764 sft Delivery: 45 days
#3

Supply and fitting of Grid Ceiling 2ft x 2ft

Providing & fixing gypboard suspended false grid ceiling with 12.5mm thick MR Ultra Gyp board Gyproc make as per approved design with G.I. framework(Gypsteel) of perimeter channels, intermediate, channels and ceiling sections) and 12.5mm taped edge gypboard(MR) screw fixed to ceiling section as per design, complete including all cost of materials, labour, overheads T&P etc. complete as per the direction of the Engineer in-charge.

374 sft Delivery: 45 days
#4

MDF door with Frame

Providing ,fitting & fixing of MDF doors with choukatha frame including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

2 nos Delivery: 45 days
#5

Rajashree Door with fittings

Providing ,fitting & fixing of Rajashree doors with fittings including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

4 nos Delivery: 45 days
#6

Upvc Widows

Providing and fixing of factory made UPVC 2-track sliding complete,comprising UPVC multi-chambered frame 60 mm of size 67x54 with wall thickness of 2.3mm having in built upvc roller track on top and upvc

55 nos Delivery: 45 days
#7

PVC Storge Box

Providing ,fitting & fixing of PVC Storage Box including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

45 nos Delivery: 45 days
#8

Supply and fitting of Exhaust Fan

Any reputaed Brand

6 nos Delivery: 45 days
#9

Bath room Plumbing wiring Materials

Provision of Plumbing wiring at Bath room including machine & labour all complete with cost, taxes and conveyance as per specification all complete as per direction of Engineer-in-charge.

1 job Delivery: 45 days
#10

Table top wash Basin

Any reputaed Brand

6 nos Delivery: 45 days
#11

Urinal

Any reputaed Brand

4 nos Delivery: 45 days
#12

Ladies Urinal

Any reputaed Brand

1 nos Delivery: 45 days
#13

Urinal Partition

Any reputaed Brand

3 nos Delivery: 45 days
#14

Western Commode

Supplying ,fitting & fixing of Western Commode with 6 lit capasity cirstern including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

2 nos Delivery: 45 days
#15

Indian Pan

Supplying ,fitting & fixing of Indian Pan with 6 lit capasity cirstern including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

1 nos Delivery: 45 days
#16

Pillar Cock

Supplying ,fitting & fixing of Pillar Cock including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

6 nos Delivery: 45 days
#17

2 In 1 Bib cock

Supplying ,fitting & fixing of 2 in 1Bib cock including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

4 nos Delivery: 45 days
#18

Health Faucet

Supplying ,fitting & fixing of Health Faucet including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

4 nos Delivery: 45 days
#19

Angle Cock

Supplying ,fitting & fixing of Angle cock including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

14 nos Delivery: 45 days
#20

Coupline

Supplying ,fitting & fixing of Coupline including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

10 nos Delivery: 45 days
#21

Flance

Supplying ,fitting & fixing of Flance including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

23 nos Delivery: 45 days
#22

Steel Jali

Supplying ,fitting & fixing of Steel Jali including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

10 nos Delivery: 45 days
#23

Towel Rail

Supplying ,fitting & fixing of Towel Rail including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

4 nos Delivery: 45 days
#24

Soap Stand

Supplying ,fitting & fixing of Soap Stand including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

4 nos Delivery: 45 days
#25

Round Towel Rail

Supplying ,fitting & fixing of Round Tower Rail including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

4 nos Delivery: 45 days
#26

Hand Wash Dispenser

Supplying ,fitting & fixing of Hand wash dispenser including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

4 nos Delivery: 45 days
#27

Tissue Paper Holder

Supplying ,fitting & fixing of Tissue Paper Holder including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

4 nos Delivery: 45 days
#28

Hand Dryer

Supplying ,fitting & fixing of Hand Dryer including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

2 nos Delivery: 45 days
#29

Mirror with frame

Supplying ,fitting & fixing of Mirrior with frame including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

2 nos Delivery: 45 days
#30

Connect Pipe

Supplying ,fitting & fixing of Connect Pipe including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

16 nos Delivery: 45 days
#31

Waiste Pipe

Supplying ,fitting & fixing of Waiste Pipe including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

10 nos Delivery: 45 days
#32

Ceiling Lights

Supply, delivery, installation and testing of celling lights including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

16 nos Delivery: 45 days
#33

Electric wires 2 mm

Wiring for Circuits and Submain with 2 Sqmm wire including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

4 coil Delivery: 45 days
#34

Modular board with switches

Supply, delivery, installation and testing of Modular board with switches including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

1 job Delivery: 45 days
#35

Painting Work

Provision of Painting work all complete including cost, taxes and conveyance as per specification all complete as per direction of Engineer-in-charge.

482 sft Delivery: 45 days
#36

Conceal head with Cover

Supplying ,fitting & fixing of Conceal head with cover including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

2 nos Delivery: 45 days
#37

Ladies Cupboard

Supplying ,fitting & fixing of Cupboard including all cost of labour & materials labour, T&P etc. required for the complete in all respect as direction by EIC.

21 sft Delivery: 45 days
#38

Service Charges

Provision of Service Charges

1 job Delivery: 45 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
AZURE ENTERPRISES   Under PMA
-08-08-2025 17:01:39
2
BINOD KUMAR BALIARSINGH   Under PMA
-08-08-2025 16:58:01
3
LAXMI NARAYAN ENTERPRISES   Under PMA
-08-08-2025 19:58:20
4
M.G CONSULTANCY SERVICES   Under PMA
-08-08-2025 16:51:45

Financial Results

Rank Seller Price Item
L1
M.G CONSULTANCY SERVICES(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Removal and disposal of old tile and fittings,Supply and fitting of Wall tile and floor Tile,Supply
L2
BINOD KUMAR BALIARSINGH (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Removal and disposal of old tile and fittings,Supply and fitting of Wall tile and floor Tile,Supply
L3
AZURE ENTERPRISES (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Removal and disposal of old tile and fittings,Supply and fitting of Wall tile and floor Tile,Supply