Progress
RAQuantity
570
Category
BACK BOX AND FACE PLATE
Bid Type
Two Packet Bid
Indian Navy has released a public tender for BACK BOX AND FACE PLATE, TOOL LESS KEYSTONE IO, CAT 6 STP SHIELDED CABLE 305 MTR BOX, CASING CAPPING 1 INCH, 2X2 INCH TRUNKING, 12U RACK FOR SWITCH IP68, 24 PORT PATCH PANEL, CAT 6 PATCH CORD 1 MTR WITH LED, CAT 6 PATCH CORD 2 MTR WITH LED, ELECTRICAL 2 SOCKET 2 SWITCH READYMADE BOX, 3 CORE ELECTRICAL CABLE 2. 5 SQMM 100 MTR BOX, 3 CORE ELECTRICAL CABLE 6 SQMM 100 MTR BOX, RCCB DISTRIBUTION BOX 4 CORE 3 WAY in SOUTH GOA, GOA. Quantity: 570. Submission Deadline: 19-02-2026 19: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
BACK BOX AND FACE PLATE , TOOL LESS KEYSTONE IO , CAT 6 STP SHIELDED CABLE 305 MTR BOX , CASING CAPPING 1 INCH , 2X2 INCH TRUNKING , 12U RACK FOR SWITCH IP68 , 24 PORT PATCH PANEL , CAT 6 PATCH CORD 1 MTR WITH LED , CAT 6 PATCH CORD 2 MTR WITH LED , ELECTRICAL 2 SOCKET 2 SWITCH READYMADE BOX , 3 CORE ELECTRICAL CABLE 2.5 SQMM 100 MTR BOX , 3 CORE ELECTRICAL CABLE 6 SQMM 100 MTR BOX , RCCB DISTRIBUTION BOX 4 CORE 3 WAY
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
BACK BOX AND FACE PLATE
BACK BOX AND FACE PLATE
TOOL LESS KEYSTONE IO
TOOL LESS KEYSTONE IO
CAT 6 STP SHIELDED CABLE 305 MTR BOX
CAT 6 STP SHIELDED CABLE 305 MTR BOX
CASING CAPPING 1 INCH
CASING CAPPING 1 INCH
2X2 INCH TRUNKING
2X2 INCH TRUNKING
12U RACK FOR SWITCH IP68
12U RACK FOR SWITCH IP68
24 PORT PATCH PANEL
24 PORT PATCH PANEL
CAT 6 PATCH CORD 1 MTR WITH LED
CAT 6 PATCH CORD 1 MTR WITH LED
CAT 6 PATCH CORD 2 MTR WITH LED
CAT 6 PATCH CORD 2 MTR WITH LED
ELECTRICAL 2 SOCKET 2 SWITCH READYMADE BOX
ELECTRICAL 2 SOCKET 2 SWITCH READYMADE BOX
3 CORE ELECTRICAL CABLE 2.5 SQMM 100 MTR BOX
3 CORE ELECTRICAL CABLE 2.5 SQMM 100 MTR BOX
3 CORE ELECTRICAL CABLE 6 SQMM 100 MTR BOX
3 CORE ELECTRICAL CABLE 6 SQMM 100 MTR BOX
RCCB DISTRIBUTION BOX 4 CORE 3 WAY
RCCB DISTRIBUTION BOX 4 CORE 3 WAY
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | BACK BOX AND FACE PLATE | BACK BOX AND FACE PLATE | 34 | nos | met.edu | 60 | |
| 2 | TOOL LESS KEYSTONE IO | TOOL LESS KEYSTONE IO | 34 | nos | met.edu | 60 | |
| 3 | CAT 6 STP SHIELDED CABLE 305 MTR BOX | CAT 6 STP SHIELDED CABLE 305 MTR BOX | 7 | box | met.edu | 60 | |
| 4 | CASING CAPPING 1 INCH | CASING CAPPING 1 INCH | 280 | mtr | met.edu | 60 | |
| 5 | 2X2 INCH TRUNKING | 2X2 INCH TRUNKING | 100 | mtr | met.edu | 60 | |
| 6 | 12U RACK FOR SWITCH IP68 | 12U RACK FOR SWITCH IP68 | 1 | nos | met.edu | 60 | |
| 7 | 24 PORT PATCH PANEL | 24 PORT PATCH PANEL | 2 | nos | met.edu | 60 | |
| 8 | CAT 6 PATCH CORD 1 MTR WITH LED | CAT 6 PATCH CORD 1 MTR WITH LED | 34 | nos | met.edu | 60 | |
| 9 | CAT 6 PATCH CORD 2 MTR WITH LED | CAT 6 PATCH CORD 2 MTR WITH LED | 34 | nos | met.edu | 60 | |
| 10 | ELECTRICAL 2 SOCKET 2 SWITCH READYMADE BOX | ELECTRICAL 2 SOCKET 2 SWITCH READYMADE BOX | 34 | nos | met.edu | 60 | |
| 11 | 3 CORE ELECTRICAL CABLE 2.5 SQMM 100 MTR BOX | 3 CORE ELECTRICAL CABLE 2.5 SQMM 100 MTR BOX | 6 | box | met.edu | 60 | |
| 12 | 3 CORE ELECTRICAL CABLE 6 SQMM 100 MTR BOX | 3 CORE ELECTRICAL CABLE 6 SQMM 100 MTR BOX | 2 | box | met.edu | 60 | |
| 13 | RCCB DISTRIBUTION BOX 4 CORE 3 WAY | RCCB DISTRIBUTION BOX 4 CORE 3 WAY | 2 | nos | met.edu | 60 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
25-Apr-2026, 12:00 pm
End
27-Apr-2026, 1:52 pm
Duration: 50 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ********** Under PMA | - | 19-02-2026 08:00:45 | |
| 2 | ********** Under PMA | - | 19-02-2026 00:04:34 | |
| 3 | ********** Under PMA | - | 19-02-2026 15:38:36 | |
| 4 | ********** Under PMA | - | 19-02-2026 09:22:28 | |
| 5 | ********** Under PMA | - | 18-02-2026 17:37:36 | |
| 6 | ********** Under PMA | - | 18-02-2026 11:39:41 | |
| 7 | ********** Under PMA | - | 19-02-2026 16:54:47 | |
| 8 | ********** Under PMA | - | 19-02-2026 16:15:23 | |
| 9 | ********** Under PMA | - | 18-02-2026 20:13:40 | |
| 10 | ********** Under PMA | - | 19-02-2026 14:07:50 | |
| 11 | ********** Under PMA | - | 18-02-2026 10:33:38 | |
| 12 | ********** Under PMA | - | 17-02-2026 13:08:05 | |
| 13 | ********** Under PMA | - | 19-02-2026 15:24:52 | |
| 14 | ********** Under PMA | - | 19-02-2026 18:06:11 | |
| 15 | ********** Under PMA | - | 19-02-2026 16:41:30 | |
| 16 | ********** Under PMA | - | 17-02-2026 20:37:10 |
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS