Bid Publish Date
07-Sep-2026, 10:23 am
Bid End Date
18-Sep-2026, 5:00 pm
Location
Progress
Organization: Hindustan Aeronautics Limited (HAL) under the Department of Defence Production. Procurement: Manufacture of ground handling components including water drain adapter, tail stand, and propeller handling stand (BOQ shows 0 items listed but title confirms scope). Location: not disclosed; procurement in context of HAL aviation equipment support. Estimated value/EMD: not publicly disclosed. Critical differentiator: option clause permits ±25% quantity variation and extended delivery time with formula-based calculation. Bid process: two-bid system (Linewise & Established source); pricing to be entered only in GeM Portal. Unique email-based access to latest drawings and SOPs for eligible vendors.
Key Term 1: Option clause allows ±25% quantity variation during and after contract
Key Term 2: No pricing in technical bid; price entered in GeM Portal only
Key Term 3: Two-bid system; established source; no partial offers accepted
Prices to be entered in GeM Portal; no pricing in technical/commercial bid; standard government payment terms apply
Delivery period starts from last date of original delivery order; extended time calculated as (additional quantity / original quantity) × original delivery period; minimum 30 days
Not specified in public summary; governed by general HAL/Defence production procurement terms
Must be registered with relevant government procurement portals
Demonstrate capability in manufacturing aerospace ground handling equipment
Submit Part-A & Part-B compliance with no pricing in Technical Bid
Quantity
10
Category
MANUFACTURE OF WATER DRAIN ADAPTER, 11F-05-PFS4- 039-A, H/D/TL/26/9/1.
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
MANUFACTURE OF WATER DRAIN ADAPTER, 11F-05-PFS4- 039-A, H/D/TL/26/9/1. , MANUFACTURE OF TAIL STAND, 11F- 07-STR3-031-A, H/D/TL/26/9/1. , MANUFACTURE OF PROPELLER HANDLING STAND, 11F-05-PFS3-043-A, H/D/TL/26/9/1.
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Nashik
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Nashik | Nashik | - | - | 2 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar ground handling equipment production
Financial statements / turnover evidence
EMD documentation (as applicable in tender terms)
Technical compliance certificates
OEM authorization letters (where applicable)
Latest drawings, SOP, PAT, PTGHE documents (as emailed to eligible vendors)
Key insights about MAHARASHTRA tender market
Bidders must submit Part-A (Technical Compliance) and Part-B (Commercial Compliance) without pricing; pricing is entered only in the GeM portal. Ensure latest drawings, SOP, PAT, and PTGHE documents are emailed to eligible vendors, and comply with the 25% quantity variation option clause.
Submit GST certificate, PAN card, experience certificates for similar equipment, financial statements, EMD documents, technical compliance certificates, and OEM authorizations. Ensure technical bid includes Part-A and Part-B compliance sheets and attach latest drawings and PTGHE-related testing documents.
Delivery begins from the last date of the original delivery order. If quantity is increased by up to 25%, the extended period is calculated as (additional quantity/original quantity) × original delivery period, with a minimum extension of 30 days.
Certifications are tied to the latest drawings, SOPs, PAT, and PTGHE testing; no explicit IS or ISO standard is listed publicly. Vendors must provide compliance documents per ATC and corrigendum if issued and ensure OEM authorization where required.
Payment terms are not explicitly stated in the public data; bidders should expect standard government terms with possible release on delivery or after acceptance, typically through GeM portal invoicing aligned with the PO.
Ensure eligibility by submitting Part-A & Part-B compliance, demonstrating established source status, providing OEM authorizations if necessary, and not including pricing in technical documents; price details must be filled via GeM portal.
Scope includes manufacturing water drain adapters, tail stands, and propeller handling stands as indicated in the tender title; BOQ lists 0 items publicly, so scope relies on PO-level specifications and latest drawings provided to eligible bidders.
Submit experience certificates for similar ground handling equipment manufacturing, along with financial statements and supplier certifications; ensure these align with the two-bid established-source criteria and OEM authorizations if applicable.