Sanitary Napkins Vending Machines,Sanitary Napkins Incinetator Machine with Smoke Control Unit
Panchayati Raj Department
SAMASTIPUR, BIHAR
Progress
Quantity
4
Category
Sanitary Napkins Vending Machines
Bid Type
Two Packet Bid
The Panchayati Raj Department Bihar invites bids for Sanitary Napkins Vending Machines and an Incinerator Machine with Smoke Control Unit (SCU) in Darbhanga, Bihar 846001. The scope includes a stand-equipped main unit with defined insulation, sheet thickness, and housing materials, plus a SCU with carbon and odor filtration. Interested suppliers should note option clauses allowing up to 25% quantity variation and the requirement to establish a state-wide service centre within 30 days of contract award. Unique design approvals and post-award modifications drive early collaboration.
25% quantity variation right during contract execution
Functional Service Centre requirement in each state; 30 days to establish
7-day post-award drawing approval; modifications communicated within 7–10 days
EMD and payment terms are per ATC; DD acceptable; payment release upon service centre evidence and contract milestones.
Delivery begins after last delivery order; extended delivery time proportionally calculated, minimum 30 days.
Not explicitly stated; adjust via contract terms with modification allowance and delivery timelines.
Functional service capability in Bihar or ability to establish service centres in target districts
Experience in supplying sanitation equipment or incineration units with smoke control
Compliance with electrical safety and waste emission standards
Panchayati Raj Department
SAMASTIPUR, BIHAR
Panchayati Raj Department
SAMASTIPUR, BIHAR
Panchayati Raj Department
VAISHALI, BIHAR
Panchayati Raj Department
VAISHALI, BIHAR
Rural Development Department
SAMASTIPUR, BIHAR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERAL | Stand provided | Yes, No |
| DIMENSIONS OF MAIN UNIT | Thickness of thermal Insulation material (mm) | 25, 40 |
| DIMENSIONS OF MAIN UNIT | Thickness of MS/SS sheet of burning chamber (internal) (mm) (Min) | 3, 5, 1 Or higher |
| DIMENSIONS OF MAIN UNIT | Machine Weight(kg) | 5-15, 16-30, 31-50, 51-250 |
| DIMENSIONS OF MAIN UNIT | Thickness of door including insulation (mm) | 20, 25, 40, 50, 60 |
| DIMENSIONS OF MAIN UNIT | Flexible emission Outlet pipe dia (mm) | 25, 40, 50, 63, 76 |
| MATERIAL OF MACHINE UNIT | Material of Housing cabinet (External) | Mild Steel(CRCA) sheet, Stainless Steel sheet of SS-304 grade |
| MATERIAL OF MACHINE UNIT | Material of Burning chamber (Internal) | Mild Steel(CRCA) sheet, Stainless Steel sheet of SS-304 grade |
| MATERIAL OF MACHINE UNIT | Material of Thermal Insulation | High Density Ceramic Fiber sheet, High Density Ceramic Board |
| CONTROL & FUNCTIONAL FEATURES | Temperature indicator provided | Yes, No |
| CONTROL & FUNCTIONAL FEATURES | Minimum Burning temperature (degree C) | 800, 950 |
| CONTROL & FUNCTIONAL FEATURES | Burning Capacity per day (Number of Napkins) | 15-50, 51-100, 100-200, 200-500, 500-700, 700-1000, 1000-1250 |
| CONTROL & FUNCTIONAL FEATURES | Burning Capacity at a time (Number of Napkins) | 1-15, 16-25, 26-50 |
| CONTROL & FUNCTIONAL FEATURES | Burning time of full capacity Napkins/pads (minutes) (Max) | 5, 10, 15, 20, 25, 30, 35, 40, 45, 50, 55, 60, 3 |
| ELECTRICAL AND SAFETY FEATURES | Automatic digital controller for time | Yes, No |
| ELECTRICAL AND SAFETY FEATURES | Automatic digital controller for temperature | Yes, No |
| SMOKE CONTROL UNIT (SCU) | Type of SCU (Smoke Control Unit) | Top mounted, Side Mounted, Separate unit, Not Required |
| SMOKE CONTROL UNIT (SCU) | Material of housing of Smoke Control Unit (SCU) | Mild Steel(CRCA) cabinet, Stainless Steel of SS-304 grade, NA |
| SMOKE CONTROL UNIT (SCU) | Both carbon Control and Foul odour Control Chambers for filteration of smoke emission | Yes, Not Required |
| SMOKE CONTROL UNIT (SCU) | Number of filters in Carbon control chamber | One, Two, Three, Not Required |
| SMOKE CONTROL UNIT (SCU) | Type of filters in Carbon control chamber | Teflon filter, Activated Carbon filter, Steel mesh filterr, Teflon filter & Activated Carbon filter, Teflon filter, Activated Carbon filter & Steel mesh filter, Ceramic blanket as a filter, Not Required |
| SMOKE CONTROL UNIT (SCU) | Number of filters in Odour control chamber | One, Two, Three, Not Required |
| SMOKE CONTROL UNIT (SCU) | Blower RPM | 1800, 2700, 0 |
| PERFORMANCE REQUIREMENTS | Warranty in Years (Option of comprehensive warranty is available through bidding only, which if opted will supersede normal warranty in the catalogue) | 1, 2, 3, 4, 5 Or higher |
Discover companies most likely to bid on this tender
GST registration
PAN card
Experience certificates (relevant to sanitary vending or incinerator systems)
Financial statements (audited if available)
EMD documents (DD or other allowed mode per ATC)
Technical bid documents
OEM authorizations (if applicable)
Key insights about BIHAR tender market
Bidders must submit GST, PAN, and experience certificates, plus EMD as per ATC. The tender requires service centre evidence in Bihar, Detailed Design Drawings within 7 days of award, and post-receipt inspection. Ensure IS/SCU and insulation specs are highlighted.
Submit GST registration, PAN, financial statements, OEM authorizations if any, technical bid, and EMD. Include service centre proof or plan, and Detailed Design Drawings within 7 days of award for approval and potential modifications.
SCU must support carbon and odour filtration as specified, with blower RPM data. The main unit requires insulation and metal sheet thickness data, temperature controls, and automatic digital controllers. Compliance with electrical safety standards is implied through specified controllers.
Delivery begins from the last date of the original delivery order; quantity can increase up to 25% with proportional extension. Minimum additional time is 30 days, and extended periods may be recalculated if the original period is shorter or longer.
Bidders must have or establish a Functional Service Centre in Bihar for carry-in warranty; if not present at bidding, establish within 30 days post-award. Payment release is contingent on furnishing service centre evidence.
After award, suppliers must submit Detailed Design Drawings within 7 days for buyer approval. Buyer will approve or request a 7–10 day modification list; delays in approval extend delivery timelines without LD penalties.
N/a
Panchayati Raj Department
📍 KATIHAR, BIHAR
Katihar District Panchayats
📍 KATIHAR, BIHAR
Katihar District Panchayats
📍 KATIHAR, BIHAR
Katihar District Panchayats
📍 KATIHAR, BIHAR
Access all tender documents at no cost
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS